Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095E660 + (ML20095E660)
- RBG-42264, Responds to Request for Addl Info Re Drywell Bypass Leakage + (ML20095E663)
- 05000325/LER-1995-014, :on 950712,unplanned Esfa Occurred Due to Low Voltage Spike on B Reactor Protection Sys.Replaced Voltage Regulators on All Four RPS MG Sets + (ML20095E665)
- NRC-95-4606, Forwards AP600 MAAP4 Benchmarking Plan.Plan Describes Comprehensive Plan to Address All Outstanding MAAP4 Issues, Including Benchmarking & Thermal/Hydraulic Concerns + (ML20095E666)
- ML20095E672 + (ML20095E672)
- ML20095E680 + (ML20095E680)
- ML20095E688 + (ML20095E688)
- ML20095E693 + (ML20095E693)
- ML20095E702 + (ML20095E702)
- ML20095E704 + (ML20095E704)
- ML20095E708 + (ML20095E708)
- ML20095E712 + (ML20095E712)
- ML20095E717 + (ML20095E717)
- 05000445/LER-1995-005, :on 950831,power Operated Relief Valves Potentially Inoperable Due to non-conservative Setpoints. Raised PORV N Accumulator Low Pressure Alarm Setpoints to 90 Psig + (ML20095E720)
- ML20095E725 + (ML20095E725)
- 05000423/LER-1992-005, Discusses Omission of RCS Depressurization Function from TS Requirements for Remote Shutdown Capability,Per LER 92-005 Submitted Via .Caused by Administrative Oversight.Ts Change Will Be Processed & Valves Tested + (ML20095E726)
- 05000423/LER-1991-014, :on 910609,reactor & Subsequent Turbine Trip Occurred.Caused by phase-to-ground Fault on 345 Kv Sys Transmission Line & Loose Restraint Tap of Relay.Tap Screw & Wiring Repaired & Relay Returned to Svc + (ML20095E728)
- ML20095E731 + (ML20095E731)
- ML20095E734 + (ML20095E734)
- ML20095E735 + (ML20095E735)
- ML20095E741 + (ML20095E741)
- ELV-03653, Responds to NRC 920414 Telcon Request for Addl Info Re Thermal Design Flow & Analyses of Inadvertent Opening of SG Relief or Safety Valve,Steam Sys Supply Failure & Main Steam Line Break Info Used for Superheat Study + (ML20095E743)
- ML20095E747 + (ML20095E747)
- ML20095E750 + (ML20095E750)
- ML20095E752 + (ML20095E752)
- ML20095E758 + (ML20095E758)
- ML20095E760 + (ML20095E760)
- RBG-42272, Clarifies Intent to Match SR 3.0.2 Re Extensions to Surveillance Intervals Proposed in 951024 License Amend Request 95-21,to Generic Implementing Specs in NRC + (ML20095E770)
- RBG-18597, Interim Deficiency Rept DR-219 Re Design Loads of Conduit Supports.Interim or Final Status Rept Will Be Provided by 841101 + (ML20095E771)
- ML20095E772 + (ML20095E772)
- ML20095E775 + (ML20095E775)
- RBG-18596, Interim Deficiency Rept DR-220 Re License Indications on Valve Seats of Cylinder Leads in Standby Diesel Generators Supplied by Tdi.Interim or Final Status Rept Will Be Submitted by 841101 + (ML20095E799)
- ML20095E803 + (ML20095E803)
- ML20095E808 + (ML20095E808)
- ML20095E814 + (ML20095E814)
- 05000336/LER-1995-043, :on 951115,reactor Core Power Exceeded Rated Thermal Power of 2,700 Mw for Period of 11 H.Caused by Personnel Error.Changed Procedure OP 2316A + (ML20095E818)
- ML20095E820 + (ML20095E820)
- ML20095E826 + (ML20095E826)
- ML20095E831 + (ML20095E831)
- TXX-4273, Advises of Adoption of Westinghouse Generic Core Damage Assessment Methodology,In Response to NUREG-0737,Item II.B.3, Post-Accident Sampling Capability + (ML20095E846)
- ML20095E847 + (ML20095E847)
- ML20095E856 + (ML20095E856)
- ML20095E858 + (ML20095E858)
- ML20095E859 + (ML20095E859)
- ML20095E862 + (ML20095E862)
- ML20095E873 + (ML20095E873)
- TXX-4276, Informs That Qualification Maint Program Described in FSAR Section 2.4,App 3A Will Be Fully Implemented Prior to Unit 1 Fuel Load + (ML20095E875)
- ML20095E876 + (ML20095E876)
- TXX-4268, Application to Amend CPPR-126,reflecting Partial Exemption from 10CFR50,App a Requirements (GDC-4).Fee Paid.Affidavit Encl + (ML20095E880)
- ML20095E881 + (ML20095E881)
- RBG-42241, Special Rept:On 950912,EDG Failed to Start During Test. Caused by Machining Errors Caused by Mfg Resulted in Binding Between Piston & Bore + (ML20095E885)