Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000354/LER-1995-003-01, Informs of Extension of Expected Submission Date for LER 95-003-01 Entitled Failure to Perform Surveillance in Operational Condition Specified in TS from 951130 to 960105 + (ML20094S506)
- 05000265/LER-1995-004-01, Forwards LER 95-004-01 Re Condenser Vacuum Scram Switches Found Out of TS Limits Due to Apparent Setpoint Drift + (ML20094S508)
- ML20094S517 + (ML20094S517)
- ELV-03627, Special Rept:On 920320 & 21,invalid Failures of DG 2A Occurred Due to Inadequate Fuel in Supply Lines & Governor Speed Increased Too Slowly.On 920322,DG High Vibration Trip Occurred Due to Defective Sensor.Sensor Replaced + (ML20094S518)
- W3P84-2196, Submits Addl Info Re Radwaste Solidification Process Control Programs.Nus Process Svcs Corp Will Perform Initial Solidification.Expeditious Review Requested to Facilitate Interim Approval to Process Wet Radwastes + (ML20094S520)
- ML20094S522 + (ML20094S522)
- ELV-03632, Special Rept 2-92-2:on 920317,dust & Debris Observed Settling in Vicinity of Generator End of Diesel.Caused by Large Piece of Fireproofing Insulation Falling Into Lead Termination Box.Power Termination Box Repaired + (ML20094S530)
- 05000265/LER-1995-004, :on 950726,switches 2-503-A/B/C/D Setpoints Found to Be Out of Tech Specs Limits.Caused by High Humidity Which Affected Switch Performance.Qcis 500-1,quarterly Low Condenser Vacuum Scram Calibr & Function Revised + (ML20094S536)
- ST-HL-AE-1019, Forwards Rev 5 to QA Program Description for Design & Const Phases.Includes Revs to Bechtel & Ebasco Programs + (ML20094S538)
- ML20094S545 + (ML20094S545)
- ML20094S546 + (ML20094S546)
- ML20094S555 + (ML20094S555)
- ML20094S559 + (ML20094S559)
- ML20094S567 + (ML20094S567)
- ML20094S571 + (ML20094S571)
- BVY-92-042, Monthly Operating Rept for Mar 1992 for VT Yankee Nuclear Power Station + (ML20094S573)
- ML20094S575 + (ML20094S575)
- ML20094S579 + (ML20094S579)
- ML20094S581 + (ML20094S581)
- ML20094S588 + (ML20094S588)
- ML20094S589 + (ML20094S589)
- ML20094S593 + (ML20094S593)
- ELV-03637, Monthly Operating Repts for Mar 1992 for Votgle Electric Generating Plant,Units 1 & 2 + (ML20094S594)
- ML20094S599 + (ML20094S599)
- ML20094S602 + (ML20094S602)
- ML20094S603 + (ML20094S603)
- ML20094S605 + (ML20094S605)
- ML20094S613 + (ML20094S613)
- B11261, Forwards Response to SER Open Item Re Internally Generated Missile from nonsafety-related Equipment & Effect on safety-related Equipment,Per + (ML20094S624)
- 3F0492-03, Documents Closure of Open Commitment Re Sebring Utils Commission Transfer (Amend 140) of Ownership Share to Florida Power Corp.Transfer & Ownership Completed on 920318 & Became Effective on 920319 + (ML20094S630)
- ML20094S642 + (ML20094S642)
- ML20094S646 + (ML20094S646)
- ML20094S649 + (ML20094S649)
- ML20094S654 + (ML20094S654)
- ML20094S659 + (ML20094S659)
- ML20095A008 + (ML20095A008)
- ML20095A010 + (ML20095A010)
- ML20095A018 + (ML20095A018)
- ML20095A022 + (ML20095A022)
- ML20095A027 + (ML20095A027)
- ML20095A031 + (ML20095A031)
- ML20095A033 + (ML20095A033)
- ML20095A045 + (ML20095A045)
- A07702, Torsiograph Test of Emergency Diesel Generator 1A at Catawba Nuclear Power Station + (ML20095A063)
- ML20095A068 + (ML20095A068)
- ML20095A081 + (ML20095A081)
- ML20095A091 + (ML20095A091)
- W3P84-2184, Application to Amend CPPR-103,extending Completion Date to 841231 + (ML20095A095)
- ML20095A097 + (ML20095A097)
- ML20095A100 + (ML20095A100)
- 05000354/LER-1995-026-01, :on 951026,RMCS Found in locked-up Condition Causing Entry of LCO Action Statement.Caused by Failure to Maintain Power Supply within Required Tolerances. Investigation Continuing + (ML20095A109)