Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093G940 + (ML20093G940)
- RBG-19074, Final Deficiency Rept DR-154 Re Rework & Repair of High Voltage Cable Terminations.Initially Reported on 840831. Repairs Completed According to Specs + (ML20093G944)
- 05000374/LER-1984-068, :on 840906,internal Bellows Seal of HPCS Discharge Relief Valve 2E22-F035 Failed.Caused by Hydraulic Forces on Seal Inherent in Sys Design.Cold Shutdown Achieved & Valve Repaired & Tested + (ML20093G949)
- 05000286/LER-1984-010-01, :on 840710,during Evaluation,Util Recognized That Postulated Loss of Station Battery 32,w/concurrent Loca,May Prevent Automatic Starting of Some Safeguards Equipment.Also Reported Per Part 21 + (ML20093G952)
- 05000250/LER-1984-024, :on 840902,biweekly Test for Temp Average & Delta-T Not Performed.Caused by Oversight of Personnel in Not Completing Test within Allowed Time Interval.Method of Scheduling Changed + (ML20093G954)
- ML20093G955 + (ML20093G955)
- 05000483/LER-1984-003, :on 840615 & 0712,containment Purge Isolation & Control Room Ventilation Isolation Signals Actuated by Spurious Containment Radiation Alarm + (ML20093G956)
- 05000416/LER-1984-040, :on 840905,scram Occurred While Control Rods Being Withdrawn.Caused by Intermediate Range Monitors Not Ranging Up During Response to Power Level Increase.Procedure Requirements Revised + (ML20093G960)
- ML20093G965 + (ML20093G965)
- ML20093G980 + (ML20093G980)
- ML20093G987 + (ML20093G987)
- BECO-LTR-95-106, Forwards Scenario Package for Pilgrim Nuclear Power Station Nrc/Fema Evaluated Exercise Scheduled for 951213.W/o Encl + (ML20093G998)
- 05000285/LER-1984-019, :on 840902,ventilation Isolation Actuation Sys Started.Caused by Operator Error During Changing of Ventilation Discharge Duct Monitor.Monitors Returned to Normal & Sys Reset.Procedures Under Review + (ML20093H011)
- 05000285/LER-1984-008, :on 840516,RCS Leakage Approached 110 Gpm W/Indication of Tube Rupture in Steam Generator B RC-2B. Caused by Igscc.Corrective Actions Contained in + (ML20093H023)
- LIC-95-0201, Informs That Util Implemented Necessary Actions Associated W/Listed Open TAC Issues & That Subject to Agreement by NRR Project Manager,Items Considered Ready to Close + (ML20093H024)
- ML20093H026 + (ML20093H026)
- ML20093H028 + (ML20093H028)
- ML20093H044 + (ML20093H044)
- 05000370/LER-1984-021-01, :on 840831,unit Tripped on Two Out of Four Channel Power Range High Flux Rate Signals During Test Procedure.Caused by Personnel Error.Personnel Instructed + (ML20093H048)
- 05000255/LER-1984-018, :on 840905,surveillance Test for Snubber on Steam Supply Line to Feedwater Pump Not Performed.Caused by Personnel Error.Computerized Tracking Tool Being Developed + (ML20093H050)
- ML20093H053 + (ML20093H053)
- ML20093H060 + (ML20093H060)
- 1CAN108401, Application for Amend to License DPR-51,allowing Gagging of 14 Steam Safety Valves & Resetting of Two Safety Valve Setpoints Below Required Test Pressure to Perform Hydrostatic Test.Fee Paid + (ML20093H087)
- ML20093H092 + (ML20093H092)
- ML20093H106 + (ML20093H106)
- 0CAN109510, Forwards NRC Providing on Page 2 Requested Signature Signifying Util Acceptance of Conditions Stated in NRC Re SCDAP/RELAP5 Cpmputer Code + (ML20093H115)
- ML20093H119 + (ML20093H119)
- ML20093H128 + (ML20093H128)
- 3F1084-07, Monthly Operating Rept for Sept 1984 + (ML20093H132)
- ML20093H138 + (ML20093H138)
- JAFP-95-0444, Monthly Operating Rept for Sept 1995 for Ja FitzPatrick Nuclear Power Plant + (ML20093H145)
- ML20093H146 + (ML20093H146)
- ML20093H148 + (ML20093H148)
- ML20093H152 + (ML20093H152)
- PY-CEI-NRR-1989, Monthly Operating Rept for Sept 1995 for Perry Nuclear Power Plant + (ML20093H156)
- ML20093H163 + (ML20093H163)
- ML20093H165 + (ML20093H165)
- ML20093H170 + (ML20093H170)
- ML20093H174 + (ML20093H174)
- 05000354/LER-1995-021, :on 950920,results of HPCI Sys Oil Reservoir Sample Indicated Moisture Content Above Specified Limit Established by Vendor.Caused by Steam Leakage Through Turbine Steam Admission Valve.Hpci Drained + (ML20093H177)
- ML20093H179 + (ML20093H179)
- ML20093H184 + (ML20093H184)
- ML20093H193 + (ML20093H193)
- ML20093H198 + (ML20093H198)
- ML20093H201 + (ML20093H201)
- ML20093H222 + (ML20093H222)
- ML20093H235 + (ML20093H235)
- ML20093H240 + (ML20093H240)
- ML20093H254 + (ML20093H254)
- ML20093H255 + (ML20093H255)
- ST-HL-AE-5215, Monthly Operating Repts for Sept 1995 for South Tx Project + (ML20093H279)