Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092P781 + (ML20092P781)
- ML20092P782 + (ML20092P782)
- ML20092P785 + (ML20092P785)
- ML20092P786 + (ML20092P786)
- ML20092P787 + (ML20092P787)
- ML20092P789 + (ML20092P789)
- ML20092P790 + (ML20092P790)
- ML20092P791 + (ML20092P791)
- ML20092P792 + (ML20092P792)
- ML20092P794 + (ML20092P794)
- ML20092P795 + (ML20092P795)
- ML20092P796 + (ML20092P796)
- ML20093A001 + (ML20093A001)
- 05000331/LER-1984-021, :on 840617,during Surveillance Test for Standby Diesel Generator B Operability,Diesel Tripped on High Crankcase Pressure While Loaded to Approx 2,400 Kw.Caused by Scavenging Air Blower Failure.Blower Repaired + (ML20093A004)
- ML20093A006 + (ML20093A006)
- ML20093A024 + (ML20093A024)
- ML20093A079 + (ML20093A079)
- ML20093A094 + (ML20093A094)
- ML20093A101 + (ML20093A101)
- 1CAN068402, Forwards Util Position Paper on Section 6 of NUREG-0737, Suppl 1 Re Reg Guide 1.97, Instrumentation for Light-Water- Cooled Nuclear Power Plants to Assess Plant Environs Conditions During & Following Accident + (ML20093A107)
- W3P84-1815, Forwards Final Prospectus for Pollution Control Bonds & Preliminary Prospectus for 2 Million Shares of Louisiana Power & Light Preferred Stock,Updating Util + (ML20093A110)
- 05000395/LER-1984-024-01, Revised LER 84-024-01:on 840422 & 29,reactor Tripped Due to Low Main Turbine Shaft Oil Pump Discharge Pressure.Caused by Conservative Switch Settings & Loss of Suction on Motor Suction Pump.Switch Setpoint Will Be Changed + (ML20093A117)
- ML20093A123 + (ML20093A123)
- ML20093A126 + (ML20093A126)
- ML20093A127 + (ML20093A127)
- ML20093A133 + (ML20093A133)
- ML20093A156 + (ML20093A156)
- 2CAN078401, Forwards Revised Schedule for Installation of Inadequate Core Cooling (ICC) Monitoring Sys,Test Program Status & Plans for ICC Instrument Installation During Next Refueling Outage.Review Process Will Be Discussed at 840712 Meeting + (ML20093A168)
- ML20093A193 + (ML20093A193)
- ML20093A209 + (ML20093A209)
- TXX-4209, Forwards Equipment Environ Qualification Analysis Justifications for Interim Operation Required by 10CFR50.49. Facilities Can Be Safely Operated Until Qualification Program Completed + (ML20093A210)
- 05000313/LER-1982-028-03, /03X-1:on 840909,diesel Driven Fire Pump P-6B Failed to Start When Using Battery Bank B.Caused by Normal end-of-svc Life.Battery Bank B Replaced on 820911 & Periodic Electrical Test Procedure Revised + (ML20093A216)
- ML20093A218 + (ML20093A218)
- ML20093A223 + (ML20093A223)
- TXX-4211, Discusses First Cycle Emergency Procedures Re Reactor Vessel Level Instrumentation.Procedures Under Rev to Eliminate Ref to Instrumentation & Will Be Revised After First Refueling When Measurement Sys Becomes Operational + (ML20093A229)
- TXX-4208, Forwards Justification for Interim Operation Re Seismic & Dynamic Qualification Program for Equipment.Encl Analysis Shows Plant Can Be Operated Safely Until Equipment Qualification Programs Completed + (ML20093A230)
- ML20093A235 + (ML20093A235)
- ML20093A236 + (ML20093A236)
- ML20093A241 + (ML20093A241)
- ML20093A242 + (ML20093A242)
- ML20093A247 + (ML20093A247)
- ML20093A248 + (ML20093A248)
- 05000362/LER-1984-021-01, :on 840602,safety Relief Valve 3PSV-0245 on Nuclear Sample Sys Actuated.Caused by Setpoint on Valve Set Unnecessarily Low.Setpoint Raised & Valve Returned to Svc on 840606 + (ML20093A250)
- ML20093A251 + (ML20093A251)
- ML20093A252 + (ML20093A252)
- ML20093A253 + (ML20093A253)
- ML20093A257 + (ML20093A257)
- TXX-4205, Forwards Revised Schedules for Installation of Accident Monitoring Instrumentation for Reactor Vessel Water Level. Installation Scheduled Prior to End of First Refueling Outage.Amend 50 to FSAR Will Reflect Changes + (ML20093A261)
- AECM-84-0345, Forwards Phase 1B Program,Div I Diesel Generator Disassembly,Reinsp & Verification of Div II Diesel Generator As-Mfg Similarity, Per 840522 Order.Preoperational Testing Will Be Completed by 840707 + (ML20093A266)
- ML20093A268 + (ML20093A268)
- ML20093A269 + (ML20093A269)