Submits Third Quarterly Status Rept Re Const Activities. Limited Engineering Effort Continuing.Related Correspondence
ML20092P790
Person / Time
Site: Washington Public Power Supply System
Issue date: 07/02/1984
From: Reynolds N
BISHOP, COOK, PURCELL & REYNOLDS, WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Bright G, Grossman H, Harbour J
Atomic Safety and Licensing Board Panel
References
OL, NUDOCS 8407090377
Download: ML20092P790 (1)


Text

\\

i l

RELATED CORRES.:0NDENCE law Orrices Or 7._.

BISHOP, LIBERMAN, COOK, PURCELL & REYNOLDS...

1200 S EVE NTC ENTN STR CET, N. W.

IN NEW YORK WASNtNGTON. D. C. 2 00 36 elSMOP, LieCRMAN & COOM (202) as7-esOO

.L as emoaowAY NEW YORM N EW YORK 00004 TcLcx 440574 INTLAW Ut (ala) ase-e900

,r TELcx aaa7e7 J

Drr.i t ;..i s EU ; i.

ERANCH July 2, 1984 Herbert Grossman, Esq.

Dr. Jerry Harbour Chairman, Atomic Safety Atomic Safety and Licensing and Licensing Board Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory commission Commission Washington, D.C.

20555 Washington, D.C.

20555,'

Mr. Glen O.

Bright Atomic Safety and Licensing Board U.S. Nuclear Regulatory Commission Washington, D.C.

20555 Subj:

Washington Public Power Supply System (WPPS3 Nuclear Project No. 1),

Docket No. 50-460-OL Gentlemen:

In accordance with the October 14, 1983, Memorandum and Order in the captioned proceeding, the Washington Public Power Supply System hereby submits its third quarterly status report regarding construction activities at WNP-1.

During the second quarter of 1984, no construction activities were performed at WNP-1, although a limited engineering effort was continuing.

We do not anticipate any change in this level of activity during the next several months.