Deficiency Rept DER 83-69 Re Seismic Supports on Posi-Seal Valves Not Installed Per Specs.Initially Reported on 831011. Submittal Date of Final Rept Delayed Until 840803
ML20093A094
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 06/27/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29840-TDS, DER-83-69, NUDOCS 8407100101
Download: ML20093A094 (2)


Text

a 2

6ECEIVED NRC Arizona Public Service Company 2 JA -3 #1 8. h2 June 27,198(OtOil V FE ANPP-29840-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 83-69 A 50.55(e) Potentially Reportable Deficiency Relating To Unit 1 Seismic Supports on Posi-Seal Valves Not Installed Per Specification.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and R. Tucker on October 11, 1983 (B) ANPP-28202, dated November 8, 1983 (Interim Report)

(C) ANPP-28587, dated January 10, 1984 (Time Extension)

(D) ANPP-28920, dated February 22, 1984 (Time Extension)

(E) ANPP-29455, dated May 8,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C), (D) and (E). At that time, it was estimated that a Final Report would be available by June 29, 1984.

A Final Report is currently being reviewed by APS.

It is expected to be transmitted to the NRC by August 3,1984.

There is no new information or change to the Interim Report at this time.

Very truly yours,

{

8407100101 840627 PD9 ADOCK 05000528 E. E. Van Brunt, Jr.

S PDR APS Vice President Nuclear Production ANPP Project Director EEVB/TRB:db cc: See Page Two NN f0

I"l s.

Mr. T. W. Bishop DER 83-69 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement

.U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher

~H. D. Foster D. R. Hawkinson L. E. Vorderbrueggen R. P. Zimmerman S. R. Frost J. Self D. Canady T. D. Bloom Records Center Institute of-Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339