Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- DCL-95-204, Forwards Proposed Changes to Physical Security Plan.Encl Withheld + (ML20092K816)
- ML20092K819 + (ML20092K819)
- ML20092K824 + (ML20092K824)
- ML20092K827 + (ML20092K827)
- ML20092K828 + (ML20092K828)
- ML20092K833 + (ML20092K833)
- 05000333/LER-1992-006, :on 920122,inadequate Fire Watch Noted in Areas W/Deficiencies in Fire Penetration Seal & Ventilation Ductwork Damper.Caused by Personnel Error.Fire Watch Personnel Replaced & Disciplined + (ML20092K834)
- AECM-84-0342, Requests License Condition 2.C (32), Interplant Communication Sys, Be Revised to Delete Fixed Date Requirement for Submittal of Communications Test Results,Due to Prolonged Delay in Power Ascension Program + (ML20092K842)
- ML20092K849 + (ML20092K849)
- LD-92-017, Forwards Response to NRC Re Addl Info for NRC Staff Review of CESSAR Design Certification + (ML20092K859)
- ML20092K870 + (ML20092K870)
- ML20092K871 + (ML20092K871)
- ML20092K887 + (ML20092K887)
- ML20092K902 + (ML20092K902)
- ML20092K904 + (ML20092K904)
- ML20092K908 + (ML20092K908)
- ML20092K911 + (ML20092K911)
- ML20092K923 + (ML20092K923)
- ML20092K934 + (ML20092K934)
- ML20092K935 + (ML20092K935)
- ML20092K946 + (ML20092K946)
- ML20092K950 + (ML20092K950)
- ML20092K951 + (ML20092K951)
- ML20092K957 + (ML20092K957)
- 05000325/LER-1992-003, :on 920117,reactor Scrammed Due to Primary Uninterruptible Power Supply (UPS) Internal Failure.Standby UPS Placed in Svc Prior to Reactor Startup & Addl Troubleshooting to Be Conducted on Primary UPS + (ML20092K961)
- ML20092K962 + (ML20092K962)
- ML20092K963 + (ML20092K963)
- LD-92-020, Responds to Request for Addl Info Re C-E Std SAR-Design Certification + (ML20092K964)
- ML20092K972 + (ML20092K972)
- ML20092K973 + (ML20092K973)
- ML20092K980 + (ML20092K980)
- ML20092K987 + (ML20092K987)
- ML20092K996 + (ML20092K996)
- ML20092K997 + (ML20092K997)
- ML20092L006 + (ML20092L006)
- ML20092L007 + (ML20092L007)
- RBG-18-089, Forwards Response to Request for Addl Info Re Combustible Gas Control Sys.Based on Evaluation,Util Will Select Suitable Equipment Protection Measures Appropriate for Equipment Location & Degraded Core Thermal Environ + (ML20092L014)
- ML20092L019 + (ML20092L019)
- RS-20-045, Response to Request for Additional Information Related to Relief Request 14R.05 for the Fourth Inservice Inspection Interval + (ML20092L027)
- ML20092L035 + (ML20092L035)
- ML20092L044 + (ML20092L044)
- ML20092L047 + (ML20092L047)
- ML20092L048 + (ML20092L048)
- ML20092L051 + (ML20092L051)
- ML20092L054 + (ML20092L054)
- ML20092L058 + (ML20092L058)
- LD-92-022, Forwards NRC Re Addl Info for NRC Staff Review of CESSAR-Design Certification + (ML20092L064)
- ML20092L065 + (ML20092L065)
- ML20092L066 + (ML20092L066)
- 05000327/LER-1984-039, :on 840527,control Room Ventilation Isolation Occurred Twice When High Radiation Alarm Actuated.Caused by Failed Vacuum Pump & Inadvertently Generated Spurious Spike. Alarm Cleared & Pump Bearings & Vanes Replaced + (ML20092L069)
- LD-92-024, Forwards Response to NRC Request for Addl Info on Electrical Distribution Sys Design,In Ref to NRC Review of CESSAR + (ML20092L071)