ML20092K950

From kanterella
Jump to navigation Jump to search
Informs That Existing Liquid Radwaste Effluent Line Discharge Radiation Monitor Sys Sample Chamber Has Been Cleaned & Decontaminated & Electronics Have Been Refurbished & Calibr,In Response to 920129 Telcon
ML20092K950
Person / Time
Site: Oyster Creek
Issue date: 02/18/1992
From: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
C321-92-2058, NUDOCS 9202260079
Download: ML20092K950 (1)


Text

t e

GPU Nuclear Corporation p

-(UClear

L;'t; **

J Uy 4

Forked River New Jersey 08731-0388 609 971-4000 Wnter's Direct D:al Nurnber:

C321-92-2058 J

February 18, 1992 l

l V. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Liquid Radwaste Discharge Radiation Monitor e

In our letter (C321-SI-2363) dated January 8,1992, GPU Nuclear committed to restore capability to monitor the liquid radwaste effluent line.

In our telephone conversation with Region I staff on January 29, 1992, the staff requested us to document the status of our efforts in this regard by February 15, 1992. This letter is provided in response to that request.

The existing liquid radwaste effluent line discharge radiation monitor system sample chamber has been cleaned and decontaminated and the electronics have been i

refurbished and calibrated. At present, fittings and connections are undergoing inspection and operating procedures and operator training needs are being reviewed. We anticipate that these efforts will be completed with the monitor functional by August 1, 1992.

We have no plans at present for any future releases via this pathway.

Based on the above, we do not now intend to include our schedule for implementation of monitor improvements in the next semi-annual Integrated Schedule update as was indicated in our January 8,1992 letter.

nyer ly, f

$m mmo J. J r on 58' Vi resident and Director 0

Creek Nuclear Generating St& tion 00 O~s

-@8 JJB/PFC/amk shf y

oo cc:

Administrator, Region I 0D$

h1N(yh l

@g OC NRC Resident Inspector g.,

MNP g

OC NRC Project Manager i

240154 ceu Nuciear co<noraiton,e e suus,eiety or cenerai euei1c uimi,es corpo<ahon I0

-