Submits Revised PBAPS Physical Security Plan & Personnel Training & Qualification Plan,Per 10CFR50.4(b)(4)(iii).Encl Withheld
ML20092L066
Person / Time
Site: Peach Bottom  
Issue date: 09/20/1995
From: Rainey G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9509260265
Download: ML20092L066 (2)


Text

.

G: rail R. Riin:v

'/,re Pres'oent i eacn tnnom Atomic Power Station IECO ENERGY T=f-uta o nwnn

'17 4% 7 ipa 10CFR 50.54(p)

September 20, 1995 Docker Nos.:

50-277 50-278 U. S. Nuclear Regulatory Commission ATTENTION: Document Control Desk Mail Station PI 137 Washington, DC 20555

Subject:

Peach Bottom Atomic Power Station Unit 2 and Unit 3 Revisions to the Physical Security Plan t.nd Personnel Training and Qualification Plan Dear NRC Officials.

This letter submits, in accordance with 10CFR 50.4(b)(4)(iii), four (4) controlled copies of the revised Peach Bottom Atomic Power Station (PBAPS) Physical Security Plan and Personnel Training and Qualification Plan. The revisions are detailed for each Plan in their respective Summary of Plan Revisions.

These revisions are being submitted in accordance with 10CFR 50.54(p)(2), and have been determined not to decrease the effectiveness of the PBAPS Physical Security Plan and/or the Personnel Training and Qualification Plan, j

In accordance with 10CFR 73.21, we request that the enclosed revisions to the PBAPS Physical Security Plan and Personnel Training and Qualification Plan which contain Safeguards Information, be withheld from public disclosure and protected, as described in 10CFR 73.21.

Sincerely,

'3 O p c<e Gerald R. Rainey Vice President, Peach Bottom Atomic Power Station GRR/DRM/ GAB:sab Enclosures (4) cc:

T. T. Martin, Administrator, Region 1, USNRC (Enclosures - 2)

W. L Schmidt, Senior Resident inspector, USNRC (Enclosures - 1)

)

R.1. Mclean, Department of Natural Resources (w/o Enclosures)

R. R. Janati, Director, Bureau of Radiation Protection (w/o Enclosures)

A. F. Kirby,111, General Manager, Demarva Power & Light Co. (w/o Enclosures)

,)

R. A. Burricelli, Public Service Electric & Gas (w/o Enclosures)

)

11. C. Schwemm. Atlantic Electric (w/o Enclosures)

ENCLOSURES CONTAIN SAFEGUARDS INFORMATION, UPON SEPARATION, Tills LETTER IS DECONTROLLED f)fh3 f rfkjhyl 3g CCN: 95-14084 4,

9509260265 950920 PDR ADOCK 05000g7

/ 7I,k.8//A M

Subject:

Peach Bottom Atomic Power Station Unit 2 and Unit 3 7

Revisions 13 the Physical Security Plan and Personnel

' Training and Qualification Plan September 1995 1

- Page 2 of 2 bec:

G. A. Bird Enclosures (2)

SCl-1 PBAPS J. B. Cotton w/o Enclosures 51 A-1

' Chesterbrook G. L. Edwards w/o Enclosures A4Is PBAPS J. W, Durham w/o Enclosures S23-1_

Philadelphia A. A. Fulvio w/o Enclosures SMB4-5 PBAPS G. A. Hunger, Jr.

w/o Encloscres 62A-1 Chesterbrook R. A. Kankus w/o Enclosures 61C-1 Chesterbrook M. A. Karney Enclosures (2)

TSCl-2 Limerick M. C. Kray.

w/o Enclosures 62A-1 Chesterbrook C. A. McNeill, Jr.

- w/o Enclosures S23-1 Philadelphia D. R. Meyers w/o Enclosures SMB4-8 PBAPS G. R. Rainey w/o Enclosures SMD4 9 PBAPS D. M. Smith w/o Enclosures 63C-3 Chesterbrook A. J. Wasong w/o Enclosures A4-5S PBAPS DAC w/o Enclosures 6 t B-3 Chesterbrook Correspondence Control Desk (w/o Enclosures) 61B-5 Chesterbrook 6