..y

~

Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 02 6 2000 February 20, 1992 LIC-92-073R U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station Pl-137 Washington, DC 20555

Reference:

Docket No, 50-285 Gentlemen:

SUBJECT:

Annual 10 CFR 50.59 Submittal Date Change As previously discussed with Mr. S. D. Bloom of the NRC, the next annual 10 CFR 50.59 report for fort Calhoun Station Unit No. I was to be submitted to the NRC by March 1, 1992. The annual 10 CFR 50.59 Report and the annual Updated Safety Analysis Report (USAR) update derive their information from common sources. To improve the consistency of this information, Omaha Public Power District will henceforth combine the annual 10 CFR 50.59 Report with the annual USAR update.

This is consistent with current industry practice.

The riext annual USAR update is currently scheduled to be submitted July 22, 1992, and will include the 10 CFR 50.59 Report for 1991.

g If you should have any questions, please contact me.

Sincerely M

Mi W. G. Gates Division Manager Nuclear Operations WGG/sel c:

LeBoeuf, Lamb, Leiby & MacRae D. L. Wigginton, NRC Senior Project Manager S. D. Bloom, NRC Project Engineer R. D. Martin, NRC Regional Administrator, Region IV R. P. Mullikin, NRC Senior Resident Inspector 9202260133 92022,0 p