Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NG-95-2677, Requests That Seven Listed Individuals Take BWR Generic Fundamental Exam Section of Written Operator Licensing Exam to Be Administered on 951003 + (ML20091R327)
- B11219, Forwards Amend 8 to Fsar,Consisting of Responses to Selected NRC Requests for Addl Info.Transmittal Ltr & Ltr Acknowledging Receipt Also Encl + (ML20091R334)
- ML20091R344 + (ML20091R344)
- HL-1492, Ro:On 910214,potential Malfunction of SRVs Suspected. Caused by Turbine Trip & Reactor Scram Valve Testing. Investigation of Malfunction Planned + (ML20091R345)
- ML20091R349 + (ML20091R349)
- HL-1488, Ro:On 910212,potential Malfunction of SRVs Suspected.Caused by Turbine Trip & Re Actor Scram.Investigation of Malfunction Planned + (ML20091R357)
- ML20091R358 + (ML20091R358)
- 05000302/LER-1984-011, :on 840509,discharge Check Valve RWV-38 on Svcs Seawater Pump RWP-2A Found Stuck Open Due to Corrosion.Loss of Independence Not Recognized by Personnel Until 840517. Review of Other Safety Sys Underway + (ML20091R362)
- ML20091R376 + (ML20091R376)
- ML20091R388 + (ML20091R388)
- ML20091R403 + (ML20091R403)
- HL-5022, Forwards Comments on Review of Revised NRC Systematic Assessment of Licensee Performance Program + (ML20091R407)
- ML20091R408 + (ML20091R408)
- ST-HL-AE-5141, Application for Amends to Licenses NPF-76 & NPF-80, Requesting Addition of TS 3.10.8 Which Would Allow Extension of Sdg AOT for Cumulative 21 Days on Each Sdg Once Per Fuel Cycle + (ML20091R411)
- ML20091R415 + (ML20091R415)
- ML20091R432 + (ML20091R432)
- ML20091R439 + (ML20091R439)
- ML20091R445 + (ML20091R445)
- ML20091R448 + (ML20091R448)
- ML20091R453 + (ML20091R453)
- ML20091R460 + (ML20091R460)
- DCL-84-224, Forwards Addl Info Re Pipe Support Design Guides Per NRC Request as Result of Recent Audits Connected W/License Condition 2.C.(11) + (ML20091R480)
- ML20091R498 + (ML20091R498)
- ML20091R518 + (ML20091R518)
- ML20091R529 + (ML20091R529)
- ML20091R539 + (ML20091R539)
- ML20091R548 + (ML20091R548)
- ML20091R559 + (ML20091R559)
- ML20091R561 + (ML20091R561)
- ML20091R563 + (ML20091R563)
- ML20091R565 + (ML20091R565)
- ML20091R567 + (ML20091R567)
- ML20091R569 + (ML20091R569)
- ML20091R572 + (ML20091R572)
- ML20091R575 + (ML20091R575)
- ML20091R589 + (ML20091R589)
- NRC-95-4543, Forwards Disk Containing Wordperfect Files for Rev 4 of AP600 SSAR & Listing of Files Included on Disk,In Response to NRC Request to Assist in Ongoing Review of AP600.W/o Disk + (ML20091R590)
- ML20091R600 + (ML20091R600)
- ML20091R609 + (ML20091R609)
- ML20091R611 + (ML20091R611)
- ML20091R619 + (ML20091R619)
- ML20091R622 + (ML20091R622)
- ML20091R628 + (ML20091R628)
- ML20091R632 + (ML20091R632)
- ML20091R640 + (ML20091R640)
- ML20091R643 + (ML20091R643)
- ML20091R650 + (ML20091R650)
- 2CAN089507, Forwards ANO Unit 2 SG Tube Circumferential Cracking Repair Limit Evaluation + (ML20091R651)
- ML20091R657 + (ML20091R657)
- ML20091R661 + (ML20091R661)
- ML20091R673 + (ML20091R673)