Comments on Revised NRC SALP Program
ML20091R563
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 08/31/1995
From: Denton R
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
FRN-60FR39193, RULE-PR-50 60FR39193-00018, 60FR39193-18, NUDOCS 9509070071
Download: ML20091R563 (5)


Text

a e '

L O . . .

t*O '*

hb b Itsog rll/%

Rostar E. Dr.NTON - ?' -

. *' t' 4 - Baltimore Gas and Electric Company [

Vice President Calvert Cliffs Nuclear Power Plant /

1650 Calvert Cliffs Parkway Nuclear Energy - < . ,

n

!' -6 Ki 2: 05 Lusby, Maryland 20657 410 586-2200 Ext.4455 local NULL 1.; 7 c ., _ , , , ,

410 260-4455 Baltimore USMC

' August 31,1995 Division of Freedom ofInformation and Publication Services -

Office of Administration

-_US Nuclear Regulatory Commission, L Washington, DC 20555 ATTENTION: Chief, Rules Review and Directives Branch l

SUBJECT:

Comments on Revised NRC Systematic Assessment of Licensee Performance Program (60 FR 39139) l 1

l The Baltimore Gas and Electric Company appreciates the opportunity to provide comments on the changes i made to the Systematic Assessmera of Licensee Performance (SALP) program on May 19,1993. Our

! - responses to the questions listed in the Federal Register are in the Attachment. In general, we believe the l >

NRC can conclude that the revisions to the SALP program have had either positive, or at a minimum, no l detrimental impact. For example, the revisions have generally been effective in more correctly focusing the SALP reports on significant performance issues. However, since our SALP reports have generally attracted little public attention, we cannot conclude that the revisions have given the public a better understanding ofour SALP results.

Should you have questions regtrding this matter, we will be pleased to discuss them with you.

t Very tmly yours, h \ w

f aw RED /JM0/dtm l At+=chment
As Stated

- cc: D. A. Brune, Esquire J. E. Silberg, Esquire L. B. Marsh, NRC D. G. Mcdonald, Jr., NRC T. T. Martin, NRC l

P. R. Wilson, NRC R. I. McLean, DNR l  !

J. H. Walter, PSC -

Q

-9509070071 950831 '

PDR- ADOCK 05000317

.G '-

PDR ,

L___________ -- ,

1 ATTACHMENT BALTIMORE GAS AND ELECTRIC COMPANY'S  !

SPECIFIC COMMENTS ON THE REVISED NRC SYSTFMATIC ASSESSMENT OF LICENSEE PERFORMANCE PROGRAM A. FUNCTIONAL AREAS

1. Are the current four functional areas (operations, maintenance, engineering, and plant support) an improvement compared to the previous seven functional areas?

Response: The new areas are more representative of equal levels ofimportance and thus impreve the validity of the overall numerical average as an indicator of plant performance.

2. Are the plant support functional area messages clear in characterizing indisidual elements (radiological controls, emergency preparedness, security, fire protection, chemistry, and housekeeping)?

Response: These messages are adequately clear. We do not know whether internal policies exist to ensure that a heavily documented adverse record in one element of Plant Support would not unduly influene the overall grade, but we have no experience showing that to be a problem. It would be u mful to know how the various elements included under the plant support functional area are weighted. ,

3. Are additional improvements needed for the designation of functional areas? What types ofimprovements?

Response: None suggested.

B. MANAGEMENT INVOLVEMENT

1. Did increased NRC management involvement in the Systematic Assessment of Licensee Performance (SALP) program result in program improvements and improved communication with licensee management?

Response: No. There was already a high degree of management involvement regarding evaluation of our facility. The addition of senior SALP Board members and their sisits to the site did rat appreciably improve the quality of information integration. We do see potential for the combination of the new, shorter SALP report and the increased NRC management involvement to focus the SALP program on the " bigger picture" issues.

While we believe it is productive to have senior NRC management onsite for the SALP meeting, the revised process did not notably affect the communication between our staff and the Regional directorates. Those that had strong communications before remained strong. Those with weaker ties may have been aided marginally, but they still need strengthening.

1

w: -..a m ATTACHMENT BALTIMORE GAS AND ELECTRIC COMPANY'S SPECIFIC COMMENTS ON THE REVISED NRC SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE PROGRAM

2. Did the SALP program changes result in better licensee and public understanding of the SALP results?

I Response: No. As a licensee, we were already able to understand the NRC's conclusions.

There has been little public attention. It is not clear to us that the process change would significantly affect their understanding even if they became more active in monitoring the communications.

3. Did increased involvement of the regional administrator or deputy at the SALP meeting i result in improved communication with licensee management?

Response We saw no effect. He Regional Administrator or his deputy had already been active in our SALP communications.

4. Was the change in SALP presentation meeting format - from a presentation te more of a discussion -effective in improving communication with licensee management?

i Response: Our SALP presentations already offered substantial opportunity for discussion, so the changes were not significant.

5. Are additional improvements needed in the areas of communications with licensee management and licensee and public understanding of SALP results? What types of improvements?

Response: We have no suggestions at this time.

C. ASSESSMENT PERIOD

1. What bases should be considered when determining SALP period length and how should they be applied?

Response: This should be left to the subjective discretion of the Regional administration without attaching too much significance to the interval. If either the plant's performance or the quality of the communications interface with Region lead to a desire to shorten or extend the nominal interval, then that should be the Regional admmi ation's prerogative.

Interval determination need not be overly codified.

2. SALP assessments currently range from 12 to 24 months (nominally 18-month average)

Is this variation in practice appropriate?

Response: Yes 2

s i ATTACHMENT BALTIMORE GAS AND ELECHUC COMPANY'S .

SPECIFIC COMMENTS ON THE REVISED NRC SYSTEMATIC ASSESSMENT OF LICENSEE l PERFORMANCE PROcRAM >

3. How long should the SALP assessment period be for good, average, and poor performing 1 plants? ,

Respmse: Current intervals are adequate. SALP periods for plants on the Watch List  ;

should be coordinated with the Senior Management Meetmgs (even if SALP remams at a '

12-month interval) so that the agency can avoid inconsistent messages.

t D. SALP REPORT

1. Are the new, shorter SALP reports more effective in communicating the results of the NRC's assessment of safety performance than the previous, more lengthy reports? 3 Respmse: 'Ihe shorter, more concise SALP reports enhance communication flow.
2. . Are SALP reports appropriately focused on safety issues and do they deliver a clear message?  !

(

Respmse: Yes. However, we suggest that trends should be clearly discussed in the functional area write-ups regardless of how significant the trends are. As currently written, NRC Handbook 8.6 states that it is appropriate to discuss trends in the functional area write-up only when they are significant. We believe it is always appropriate and i helpful to the licensee and the public to discuss trends.

3. Do SALP reports provide a balanced assessment oflicensee safety performance (and are positive aspects oflicensee safety performance appropriately considered)?

Respmse: Yes. It is clear that there is an effort to include positive aspects of licensee performance, but it is a fact oflife that regulators always spend the bulk of their time in l problem areas. The proportion ofpositive to negative comments reflects that.

4. Do SALP reports consistently focus on the last six months of performance? Is this

! practice appropriate?

Respmse: In general, this emphasis has been evident. We would charteterize this as the i most positive and meaningful difference between the old and new processes. In our last SALP report, the NRC took exception to this practice in the ALARA area.

5. Is the level of detail in the SALP report appropriate?

i Respmse: Yes.

4 1

3

ATTACHMENT BALTIMORE GAS AND ELECTRIC COMPANY'S SPECIFIC COMMENTS ON THE REVISED NRC SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE PROGRAM

6. Are SALP report conclusions well-supported by documented facts?

Response: Generally, yes. One exception is currently under discussion in our pending report.

7. Are SALP report cover letter messages consistent with the associated SALP report messages?

Response: Yes

8. Are licensee self-assessment efforts adequately recognized in the SALP report and cover letter?

Response: Yes

9. Are additional improvements needed in the 9 ALP reports? What types ofimprovements?

Response: We believe that the Senior Resident Inspector should be a member of th:

SALP Board. The Senior Resident's interpretation of the context of the dxumentel 4

esidence being reviewed by the Board is a key factor in its conclusions. It is appropriate to recognize that importance and to make the Senior Resident Inspector accountable for that input by formal membership on the Board.

E. ADDITIONAL COMMENTS In addition to the above issues, commenters are invited to provide any other views on the NRC SALP program that could assist the NRC in improving its effectiveness.

Response We believe that there are some issues where public attendance may have a chilling affect on the openness of discussion. We agree that NRC Handbook 8.6 should contain language that allows portions of the SALP meeting to be closed when proprietary, safeguards, personnel or other sensitive information will be discussed.

4 I