Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087P652 + (ML20087P652)
- ML20087P665 + (ML20087P665)
- ML20087P668 + (ML20087P668)
- ML20087P669 + (ML20087P669)
- RBG-17-452, Interim Deficiency Rept DR-138 Re ITE-Gould Motor Overload Relays & Trip Ranges.Investigation Incomplete.Next Rept Will Be Submitted by 840524 + (ML20087P674)
- RBG-17-451, Interim Deficiency Rept DR-139 Re Model PSA-1 & PSA-3 Mechanical Shock Arrestors Supplied by Pacific Scientific. Investigation Incomplete.Next Rept Will Be Provided by 840517 + (ML20087P686)
- IR 05000266/1984001 + (ML20087P687)
- AECM-84-0195, Final Part 21 Rept PRD-84/01 Re Incorrect Installation by Brown Boveri of 30-volt Dc 22 Microfarad Capacitor in Solid State Trip Unit.Initially Reported on 840105.Defective Trip Unit Replaced + (ML20087P688)
- TXX-4139, Interim Deficiency Rept SDAR-131 Re Defective Lug Crimps on Field Routed Cable.Equipment Supplied by Reliance Will Be Inspected for Proper Terminal & Connector Pin Crimping. Equipment Rework Will Be Completed by 840531 + (ML20087P689)
- ML20087P690 + (ML20087P690)
- ML20087P693 + (ML20087P693)
- RBG-17-454, Interim Deficiency Rept DR-142 Re Bellows Assembly of Relief Valve Supplied by Crosby Valve Co.Investigation Incomplete. Next Rept Will Be Submitted by 840504 + (ML20087P699)
- RBG-17-453, Interim Deficiency Rept DR-108 Re Bergen Paterson Supplied Pipe Support Components.Investigation Incomplete.Next Rept Will Be Submitted by 840501 + (ML20087P704)
- ML20087P707 + (ML20087P707)
- ML20087P709 + (ML20087P709)
- B11096, Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria + (ML20087P710)
- ML20087P712 + (ML20087P712)
- ML20087P713 + (ML20087P713)
- ML20087P714 + (ML20087P714)
- ML20087P718 + (ML20087P718)
- ML20087P726 + (ML20087P726)
- ML20087P728 + (ML20087P728)
- ML20087P730 + (ML20087P730)
- ML20087P733 + (ML20087P733)
- ML20087P734 + (ML20087P734)
- ML20087P737 + (ML20087P737)
- PLA-2120, Interim Part 21/deficiency Rept Re Base Metal Cracking in Fittings Used on Class IE Electrical Raceways & HVAC Supports.Initially Reported on 840206.Final Rept Expected Prior to Initial Criticality + (ML20087P738)
- 05000395/LER-1984-013, :on 840309,new Software Mod Deleted Monitoring of Smoke Detectors in Zones Fff & Mmm in Intermediate Bldg, Disabling Main Control Room Operators.Discrepancy Corrected & Detectors Tested & Verified + (ML20087P739)
- ML20087P741 + (ML20087P741)
- ML20087P744 + (ML20087P744)
- ML20087P748 + (ML20087P748)
- ML20087P749 + (ML20087P749)
- ML20087P752 + (ML20087P752)
- ML20087P755 + (ML20087P755)
- ML20087P757 + (ML20087P757)
- ML20087P758 + (ML20087P758)
- ML20087P760 + (ML20087P760)
- ML20087P763 + (ML20087P763)
- ML20087P768 + (ML20087P768)
- ML20087P774 + (ML20087P774)
- ML20087P775 + (ML20087P775)
- ML20087P782 + (ML20087P782)
- NLS8400108, Forwards Second 10-yr Inservice Insp Plan + (ML20087P789)
- ML20087P791 + (ML20087P791)
- ML20087P795 + (ML20087P795)
- ML20087P801 + (ML20087P801)
- ML20087P803 + (ML20087P803)
- ML20087P806 + (ML20087P806)
- LD-84-142, Responds to NRC 840217 Lr Re Violations Noted in IE Insp Rept 50-528/83-41.Addl Time to Further Evaluate Position Re Calculation Method for Radiation Monitoring Sys Requested. Response Will Be Provided by 840430 + (ML20087P808)
- ML20087P815 + (ML20087P815)
- ML20087P817 + (ML20087P817)