Final Deficiency Rept U-70 Re Emergency Diesel Generator B Keepwarm Lube Oil Pump PKJ03B Mfg by Colt.Caused by Misalignment of Rotors.Replacement Parts Obtained & Proper Alignment Will Be Checked.Also Reported Per Part 21
ML20087P760
Person / Time
Site: Callaway Ameren icon.png
Issue date: 03/28/1984
From: Schnell D
UNION ELECTRIC CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
REF-PT21-84 U-70, ULNRC-780, NUDOCS 8404090348
Download: ML20087P760 (1)


Text

_

b UNION ELECTRIC COM PANY 1901 GRATIOT STREET ST. Louis, MISSOURI March 28,1984 u.iuna moo p,o,moxg4s E...

DONALD P. SCHNELL -

voce pas.soeNT ST. LOUIS. MIS 50URt 63 3 66 Mr. James G. Keppler

-Regional Administrator-

= USNBC Region III 799 Roosevelt Road ULNBC- 780 Glen Ellyn, IL -60137

Dear Mr. Keupler:

FINAL 10CFR50.55(el/PART 21 REPORP U-70 DIESEL GENERA'IOR KEEPWABM LUBE OIL PUMP

-- CALLAMAY PLANT

. On February 29, 1984 Union Electric infoned the NBC Region III of a significant deficiency reportable under 10CFR50.55(e) regarding the "B" emergency diesel generator keepwarm lube oil purp (PKJ03BJ.

The emergency diesel generators are equipped with a secondary lube oil system which heats and recirculates engine lube oil. This systs keeps the oil warm.to aid starting and'to prelube the bearings until the primary pump proviles sufficient oil flow. The failure of this punp could cmprmise the starting capability and thereby the operation of the emergency diesel generator.

~ The punp is designed with drive gear and idler gear rotors as the pumping .

mechanism. Several teeth on the drive gear failed on one pump each at Callaway and at Wolf Creek. - Frm inspection of the failed parts, the vendor, Crane Deming, has determined that the failures were caused by a misalignment of the rotors due to inproper mounting on the engine skid. The punp is a cmponent of the engine. skid which was ' manufactured by- Colt.

Replacment parts are being obtained and the proper alignment will be checked during installation. In addition, the alignment of the "A" diesel generator keepwarm lube oil punp will be inspected to assure continued operability.

c The replacement part installation and the inspection will be completed prior to fuel load.

We believe the actions taken'and planned have adequately addressed this deficiency and will assure the operability of the diesel generators. This is our final report regarding this matter.

very t

. f0l-@3 L Fruly Donald F. Sc L

LJJS/JJM/siz "oc: B. L. Forney, NBC Region III

' Richard DeYoung,; Director, .I & E >

NBC Resident' Inspectors, Callaway Plant (2).

2 Missouri Public Service Cmmission 8404090348 840328 " N \