Deficiency Rept Re Lubricating Oil Sys Defect in Standby Diesel Generators.Transamerica Delaval,Inc Corrective Action Recommendation Will Be Complete by 840416 Vice 840415.Next Rept within 2 Wks of Corrective Action Receipt
ML20087P690
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/30/1984
From: Edelman M
CLEVELAND ELECTRIC ILLUMINATING CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
RDC-24(81), NUDOCS 8404090281
Download: ML20087P690 (1)


Text

-

~p/

ThE CLEVEL AND ELECTR!C ILLUMiM ATiilG COMPANY P.O. Box 5000 - CLEVELAND, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDO. ~ $5 PUBLICSQUARE Serving The Best location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE: Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Lubricating 011 System Defect in Standby Diesel Generators

[RDC 24(81)]

Dear Mr. Keppler:

Our letter to you dated March 6, 1984, stated that we anticipated filing our next report on modification of the turbocharger lubricating oil sytem by April 15, 1984, subsequent to our evaluation of Transamerica Delaval's new recommended corrective action.

However, new information submitted March 22, 1984, to the Director, Of fice of Inspection and Enf orcement, U.S. NRC, by Transamerica Delaval, Inc. , indicates that their recommendation of corrective action will now be complete by April 16, 1984. We anticipate filing of our next report on this subject two weeks subsequent to our receipt of Transamerica Delaval's recommended corrective action.

Sincerely,

& A Murray R. Edelman Vice President Nuclear Group MRE:pab cc: Mr. M. L. Gildner NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 8404090281 840330 FDR S

ADOCK 05000440 U.S. Nuclear Regulatory Commission PDR c/o Document Management Branch Washington, D.C. 20555 Records Center, SEE-IN Institute of Nuclear Power Operations

[ i 1100 Circle 75 Parkway, Suite 1500 1 )

Atlanta, Georgia 30339 4PR 2y