b T H E C L E V E L n K D E L E C T P I C i L L u id i H T T I N G C 0 iu P A N Y P.o. Box 5000 - CLEVELAND. OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG.
- 55 PUBLICSoUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Potential Defect with Engine Mounted Fuel Oil Line/Transamerica Delaval, Inc. [RDC 84(83)]
Dear Mr. Keppler:
Our final report to you dated January 30, 1984, stated that installation of additional tubing supports for engine mounted fuel oil lines was expected to be complete by April 1,1984, for Unit 1 and June 1,1984, for Unit 2.
We now expect rework on the fuel oil lines to be complete by July 1,1984, for both Units subsequent to Transamerica Delaval, Inc. review of discrepancies between design drawings and as-built conditions and proposed rework.
Sincerely, hk Murray R. Edelman Vice President Nuclear Group MRE:pab cc:
Mr. M. L. Gildner liRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.