Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087P120 + (ML20087P120)
- ML20087P121 + (ML20087P121)
- ML20087P125 + (ML20087P125)
- ML20087P126 + (ML20087P126)
- ML20087P128 + (ML20087P128)
- ML20087P129 + (ML20087P129)
- ML20087P130 + (ML20087P130)
- ML20087P133 + (ML20087P133)
- ML20087P147 + (ML20087P147)
- ML20087P148 + (ML20087P148)
- ML20087P151 + (ML20087P151)
- ML20087P158 + (ML20087P158)
- ML20087P159 + (ML20087P159)
- ML20087P162 + (ML20087P162)
- B11073, Clarifies Info on TMI Action Item II.F.1.6 Re Hydrogen Monitor Measurement Capabilities.Ser & 830314 Confirmatory Order Should Be Revised to Reflect Status.Item Completed + (ML20087P163)
- 0CAN038407, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/84-01 & 50-368/84-01.Corrective Actions:Current Work Planning Staff Being Augmented to Strengthen Maint Planning Function + (ML20087P166)
- ML20087P172 + (ML20087P172)
- 05000370/LER-1984-007, :on 840119,leak Check of in-core Detectors Not Performed within 31 Days Prior to Installation.Caused by Personnel Error & Procedural Deficiency.Procedure Revised. Personnel Counseled + (ML20087P177)
- AECM-84-0177, Responds to IE Bulletin 83-08, Electrical Circuit Breakers...Reactor Trip Sys. GE Confirmation of Supplying Eight safety-related Breakers W/Undervoltage Trip Features Still Pending.Extension Until 840601 Requested + (ML20087P182)
- 0CAN038406, Responds to NRC Re Violation & Deviation Noted in IE Insp Repts 50-313/83-34 & 50-368/83-34.Corrective Actions:Instrument Removed from Controlled Access,Tagged Out of Svc & Recalibr W/O Adjustment + (ML20087P184)
- ML20087P188 + (ML20087P188)
- B11089, Summarizes 840314 Meeting W/Nrc in Bethesda,Md Re 13 Draft SER Open Items (Encl).Addl Info Re Confirmatory Items Will Be Submitted as Available + (ML20087P192)
- ML20087P193 + (ML20087P193)
- ML20087P195 + (ML20087P195)
- ML20087P196 + (ML20087P196)
- ML20087P198 + (ML20087P198)
- L-17-103, Rev 0 to Statistical Evaluation of Postulated Flaws at Brunswick Steam Electric Plant,Unit 1 + (ML20087P199)
- ML20087P202 + (ML20087P202)
- ML20087P205 + (ML20087P205)
- ML20087P206 + (ML20087P206)
- SNRC-1033, Forwards Response to Questions Raised at NRC 840328 Meeting in Bethesda,Md Re Supplemental Motion for Low Power Ol.Addl Responses Concerning Containment Isolation,Containment Heatup & Loca,App K Analysis Will Be Forwarded + (ML20087P210)
- ML20087P216 + (ML20087P216)
- ML20087P218 + (ML20087P218)
- ML20087P219 + (ML20087P219)
- TXX-4142, Forwards Updated Schedule for Responses to SER Outstanding Issues,Confirmatory Issues & Licensing Conditions.Issues Include TMI Items III.A.1.2 Re Emergency Support Facilities, III.A.2 Re Emergency Preparedness & I.D.1 + (ML20087P227)
- ML20087P229 + (ML20087P229)
- ML20087P230 + (ML20087P230)
- ML20087P233 + (ML20087P233)
- ML20087P234 + (ML20087P234)
- ML20087P237 + (ML20087P237)
- ML20087P238 + (ML20087P238)
- ML20087P240 + (ML20087P240)
- TXX-4134, Comments on Containment Sump Isolation Valves & Recommendations Made in Cygna Independent Assessment Program Rept Re Cable Tray Supports & Anchor Bolt Embedment Lengths. Std Set of Instructions for Supports Expected by 840501 + (ML20087P243)
- ML20087P245 + (ML20087P245)
- ML20087P246 + (ML20087P246)
- ML20087P248 + (ML20087P248)
- 3F0384-10, Responds to IE Bulletin 83-08 Re Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in safety-related Applications Other than Reactor Trip Sys.Ge or Westinghouse Type Breakers Used Only as Reactor Trip Breakers + (ML20087P252)
- ML20087P256 + (ML20087P256)
- ML20087P258 + (ML20087P258)
- ML20087P259 + (ML20087P259)
- CNL-20-003, Application for Technical Specifications Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (BFN-TS-516) + (ML20087P262)