Interim Deficiency Rept 84-06 Re Problem W/Liquid Penetrant Exam of Welds Performed by Itt Grinnell.Reexam Revealed Linear Indications.Final Rept Will Be Submitted by 841017
ML20087P158
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/08/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
8136, 84-06, 84-6, NUDOCS 8404060109
Download: ML20087P158 (2)


Text

-

. . ~ -

Y NIAGARA NUMOHAWK N4AGARA MOHAWK POWER CORPORATION /330 ERIE BOULEVARD WEST, SYRACUSE. N.Y.13202/ TELEPHONE (315) 474-1511 March 8, 1984 (8136)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Comission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an interim report in accordance with 10CFR50.55(e) for the problem concerning liquid penetrant examination of welds performed by ITT Grinnell (55(e) 06). This problem was reported via telecon to S. Collins of your staff on February 10, 1984.

Very truly yours,

(@Wl/

C. V.- Mangan M

.Vice President.

Nuclear Engineering & Licensing i

CVM/TL:ja Enclosure xc: Director of-Inspection.and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 t

8404060109 840308 q PDR ADOCK 05000410 S PDR hgi

& lit c

_- - p NIAGARA M0 HAWK POWER CORPORATION NINE MILE P0 INT UNIT 2 DOCKET N0. 50-410 Interim Report for a Problem-Concerning Liquid Penetrant Examination (55(e) 06)

Description of-the-Problem The problem pertains to liauid penetrant examination of certain welds performed by ITT Grinnell. During the Nuclear Regulatory Comission Construction Appraisal Team Audit audit, it was observed that some welds in the main steam safety valves, vents and drains system piping had inadeauate surface preparation for the liauid penetrant examination performed. ITT Grinnell is now in the process of reexamining other accessible welds in the main steam safety valves vents and drains system piping. Reexamination has revealed some rejectable linear indications.

The matter is still under investigation, and a final report will be submitted by October 17, 1984.