ML20087P193

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 83-07.No Components Mfg by Ray Miller,Inc Installed in safety-related Sys or in Stock at Facility.List of Component Suppliers Encl
ML20087P193
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/21/1984
From: Beckham J, Beckhan J, Beckman J
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-83-07, IEB-83-7, NED-84-149, NUDOCS 8404060145
Download: ML20087P193 (3)


Text

.

a Georg:a Power Company 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526 7020 Maihng Address:

Post Offee Box 4545 Atlanta. Georgia 30302 m Georgia Power N smwetre system J. T. Beckham. Jr.

Vice President and General Manager hh NED-84-149 Nuclear Generation March 21,1984 U. S. Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement I6E: RCD Region II - Suite 2900

  • 50-321/50-366 101 Marietta Street, NW I6E Bulletin Atlanta, Georgia 30303 83-07 ATTENTION: Mr. James P. O'Reilly GENTLEMEN:

Georgia Power Company (GPC) provides the following response to I6E Bulletin 83-07, concerning apparently fraudulent materials sold by Ray Miller, Inc.

Action items 1 through 3 of. the reference Bulletin applied to nuclear power facilities holding an Operating License. Our responses to these items are as follows:

Item 1.

(a) Attachment 1 to this letter lists companies identified in Attachments 1 and 2 of the reference Bulletin which were found to be GPC suppliers, and shows which of these companies supplied materials or services to Plant Hatch. Four companies on the list have not responded to our inquiries, and one company has supplied only a partial response. A supplement to this Bulletin response, addressing Items 1 through 3, will be issued if it is subsequently

.detennined that any of these non-responding companies supplied Ray Miller, Inc. materials to Plant Hatch.

(b) As identified on attachment 1, RECO Industries, Inc. provided apparently fraudulent Ray Miller Inc. materials to Plant Hatch.

(c) 'Ihe material- supplied by RECO Industries was used in the Decontamination Solution Concentrators (part of the radwaste system). This system is non-safety related and has never been used.

(d) Our- review identified three GPC Purchase Orders issued directly to Ray Miller, ~Inc. , dated November 1, 1971, Febniary 24, 1972, and November 20, 1973. These purchase orders were for commercial grade

. equipment with no quality assurance requirements, and as such could not ' have been used in any safety related system. A review by warehouse personnel indicated that these parts were no longer in stock.

8404060145 840321 PDR ADOCK 05000321 G PDR /}IAll g

t GeorgiaPowerkh U. S. Nuclear- Regulatory Comission Office of Inspection and Enforcement Region II March 21,1984 Itan 2 No action is required since no Ray Miller, Inc. components were installed in safety related systems.

Item 3 No action is required since no Ray Miller, Inc. components are in stock at Plant Hatch.

J. T. Beckham, Jr. states that he is Vice President of Georgia Power Company and is authorized to execute this oath on behalf of Georgia Power Company, and that to the best of his knowledge and belief the facts set forth in this letter are true.

GBDRGIA POWER COMPANY By: -

J. T. Beckham, Jr."

Sworn t and subscribed before me this 21st day of March,1984.

-- d. _

'/ / >/ Notary Public Notary Public. Georsta, $ tate at targe N! My Comminion Expires July 26,1985 Enclosure xc: H. C. Nix, Jr.

Senior Resident. Inspector, Plant Hatch Document Control Desk (NRC-Washington) 700775

.i ._

Attachment 1 GEORGIA IOER ONPANY SUPPLIERS CONTACIED CXMCERNING NRC 00NCERNING NRC I&E BLYLETIN NO. 83-07 SUPPLIER RESPONSE DA'IE Air'Preheater Ca pany, GE'

  • 1-27-84 Air Products and 'Neic31s
  • 2-9-84 4 Anerican Standard
  • 1-19-84 Apex Supply ** 1-6-84 Babcock & Wilcox Capany ** l-27-84 Bechtel Power Corporation
  • l-23-84 Bethlehe Steel Corporation ** l-18-84 Bristol Metals, Inc. ** 1-3-84 Buffalo Forge ** 1-4-84 Cardox Corporation ** l-12-84 Chantron Corporation ** l-4-84

' Consolidation Coal Capany

  • 1-9-84
Daniel Construction C apany
  • l-27-84 Dollinger Corporation
  • 2-3-84 Bnerson Electric Cm pany '
    • 2-6-84 Hajoca Corporation '(1) 1-4-84

~

Industrial Rubber Products Co.

ITT Grinnell Corporation (2)

  • 2-3-84 p- Jarett Industries, Inc.
  • 1-24-84 Joy Manufacturing ** 2-1-84 -

Kanawha Manufacturing Co. ** 1-4-84 [

R. G. Laurence Ca pany ** '

2-7-84 Leslie & Elliott Company ** l-9-84 . -

Mideo Pipe & 'Ibbe ** l-12-84

. Paul Meuller C a pany (1)

'Ihe Norton Cmpany ** 1-9-84 Pemutit Co., Inc. ** 2-7-84

-Pittsburgh-Des Moines Steel ** l-9-84

= Process Engineering, Inc.

  • l-6-84 l

l Process Supply, Inc.

  • l-10-84 RB00 Industries, Inc. *** l-6-84 Republic Metal Products, Inc.
  • l-16-84 Reynolds Manufacturing (1) f Ross Metals
  • 1-6-84 I Rust Engineering. Company. (1) i Southwest Stainless of Georgia
  • l-18-84' L Stevens Ca pany
  • 2-13-84 Taylor Industrial Supply
  • 2-3-84 l
  • - No equipnent was supplied to Plant Hatch.
    • Muipnent supplied did -not contain Ray Miller, Inc. apparently fraudulent materials.
      • Muipnent supplied did contain Ray Miller, Inc., apparently fraudulent materials-

- (1) Canpanies have been contacted, but have not provided a response (2) Only I'IT .Grinnel Industrial Piping, Inc. has responded. Awaiting Corporate Grinnel response.

_.