Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20087M990 + (ML20087M990)
- ML20087M993 + (ML20087M993)
- ML20087M994 + (ML20087M994)
- ML20087M997 + (ML20087M997)
- ML20087N001 + (ML20087N001)
- RBG-17-450, Clarifies 840301 Submittal of Calculational Methodology for Equipment Qualification Radiation Environs,Per 840327 Conference Call.Addl Explanation of Source Terms Found in FSAR Section 11.1 + (ML20087N058)
- ML20087N068 + (ML20087N068)
- ML20087N072 + (ML20087N072)
- ML20087N087 + (ML20087N087)
- ML20087N088 + (ML20087N088)
- ML20087N091 + (ML20087N091)
- ML20087N093 + (ML20087N093)
- ML20087N094 + (ML20087N094)
- ML20087N095 + (ML20087N095)
- ML20087N096 + (ML20087N096)
- ML20087N099 + (ML20087N099)
- ML20087N100 + (ML20087N100)
- ML20087N103 + (ML20087N103)
- 05000362/LER-1984-011-01, :on 840227,during Investigation of Reactor Trip Breaker Pushbutton Event,One Set of Leads in Each of Four Plant Protection Sys Bays Found Disconnected.Caused by Leads Disconnected During Earlier Surveillance + (ML20087N105)
- 1CAN038405, Forwards Response to 831223 Request Re Status of Activity Re Interim Reliability Evaluation Program Analysis (NUREG/CR-2787).No Addl Mods to Design Action Re Main Contributors to Core Melt Frequencies Necessary + (ML20087N106)
- 05000331/LER-1984-012, :on 840229,during HPCI Surveillance Testing, HPCI Turbine Stop Valve Failed to Open After Auxiliary Oil Pump Started.Hpci Declared Inoperable.Caused by Faulty Automatic Depressurization Sys Reset Switch + (ML20087N107)
- ML20087N108 + (ML20087N108)
- ML20087N109 + (ML20087N109)
- ML20087N111 + (ML20087N111)
- ML20087N117 + (ML20087N117)
- ML20087N118 + (ML20087N118)
- ML20087N126 + (ML20087N126)
- ML20087N127 + (ML20087N127)
- ML20087N130 + (ML20087N130)
- ML20087N133 + (ML20087N133)
- ML20087N140 + (ML20087N140)
- ML20087N143 + (ML20087N143)
- ML20087N147 + (ML20087N147)
- ML20087N148 + (ML20087N148)
- ML20087N149 + (ML20087N149)
- ML20087N155 + (ML20087N155)
- ML20087N159 + (ML20087N159)
- ML20087N164 + (ML20087N164)
- ML20087N166 + (ML20087N166)
- PLA-2137, Revised Final Deficiency Rept Re Fraying of Hydrogen Recombiner Cables.Initially Reported on 830728.Fraying Caused by Handling Process for Shipment,Installation & Testing.Cables Repaired + (ML20087N171)
- ML20087N173 + (ML20087N173)
- ML20087N177 + (ML20087N177)
- 05000302/LER-1984-003, :on 840228,ground Fault Occurred in 230 Kv Electrical Sys External to Facility.Caused by Failure of Lightning Arrestor on Unit 1 step-up Transformers. Electrical line-up to Be Reexamined + (ML20087N181)
- ML20087N183 + (ML20087N183)
- ML20087N186 + (ML20087N186)
- RBG-17-417, Interim Deficiency Rept DR-169 Re Wiring in Switchgear Supplied by Brown-Boveri.Investigation Incomplete.Next Rept Will Be Submitted by 840522 + (ML20087N189)
- ML20087N191 + (ML20087N191)
- 05000348/LER-1984-008, :on 840302,determined That Control Room Fire Barrier Penetration for NRC Red Phone Cable Not Properly Sealed.Caused by Personnel Error.Penetration Sealed. Personnel Reinstructed on Proper Installation + (ML20087N192)
- ML20087N195 + (ML20087N195)
- ML20087N198 + (ML20087N198)
- DCL-84-088, Responds to NRC Re Violations Noted in IE Insp Rept 50-275/83-40.Corrective actions:831227 Interofc Memo Issued to All Engineering Disciplines Covering Procedures to Revise Existing Files & Prepare New Files + (ML20087N201)