ML20087N130
| ML20087N130 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 03/23/1984 |
| From: | Mooney J CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| CSC-7498, NUDOCS 8404030141 | |
| Download: ML20087N130 (2) | |
Text
_
Anit)
C011SumBIS Power Executive Manager Midland hoject Office General offices: 1945 West Parnell Road, Jackson, MI 49201 * (517) 788-0774
/ PRINCIPAL STAFF March 23, 1984 e/ RA <bg oppp D/RA DE A/RA DfNSP RC DRMA Mr John J Harrison, Chief (AO.
SCS/
0%40 Midland Project Section
.RA ML U S Nuclear Regulatory Commission 17
_-Filet.Qf._(
Region III 799 Roosevelt Road Gler. Ellyn, IL 60137 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION
~
File:
0485.16 UFI:
42*05*22*04 Serial: CSC-7498 12*32 In accordance with the Work Authorization Procedure, we request authorization to perform the following, activities:
155052060 - Finger Drift and Demo Mudmat on Col 9 to J, Excavate and Install Pier E5.
165052060 - Finger Drift and Demo Mudmat on Col 4 to J. Excavate and Install Pier W5.
155055020 - Excavate for and Install Support Columns Next to Contain-ment and Install and Load Grillage Structure at Pier E5.
(Including Instrumentation) 165055020 - Excavate for and Install Support Columns Next to Contain-ment and Install and Load Grillage Structure at Pier W5.
(Including Instrumentation).
165052080 - Drift to, Excavate, Install and Load Pier CT3.
155052080 - Drift to, Excavate, Install and Load Pier CT10.
-In addition, we request re-authorization for the following activities on which previous authorization has expired.
- 165052340 - Finger Drift to Excavate, Install and Load Pier Kc5.
- 155052340 - Finger Drift to Excavate, Install and Load Pier Kc8.
~
8404030141 840323 PM ADOCK 05000 2 MAR 2 81984 A
pD gp
~
,~
2
- 165052375 - Complete Drift Kc4 to CT1.
- 155052375 - Complete Drift Kc9 to CT12.
dC OL%
JdM/RHW/k1w
(