ML20087N100

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept Re Gh Bettis Actuators.Final Rept Will Be Submitted on 840629 Rather than 840316
ML20087N100
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 03/19/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NMP2L-008, NMP2L-8, NUDOCS 8404030101
Download: ML20087N100 (1)


Text

M V NIAGARA RUMOHAWK NBAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE. N Y.13202/ TELEPHONE (315) 474-1511 March 19, 1984 (NMP2L 008)

Mr. R. W. Starostecki, Director U.S. Nuclear Regulatory Commission Region I Division of Project and Resident Programs 631 Park Avenue King of Prussia, PA 19406 Re: Nine Mile Point Unit 2 Docket No.-50-410

Dear Mr. Starostecki:

The final report in accordance with 10CFR50.55(e) concerning actuators supplied by G. H. Bettis will be submitted to the Nuclear Regulatory Commission by June 29, 1984, rather than March 16, 1984, as previously committed. This extension was granted via telecon between Mr. T. Loomis (Nine Mile Point Unit 2 Licensing) and Mr. S. Collins of your staff on March 13, 1984.

Very truly yours, C. V. Mangan Vice President Nuclear Engineering & Licensing CVM/TL:ja xc: Director of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. R. Granyn,. Resident Inspector

/

h[

8404030101 840319 PDR ADOCK 05000 S

/ l$

l

.....