Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085G663 + (ML20085G663)
- ML20085G668 + (ML20085G668)
- PY-CEI-NRR-1964, Monthly Operating Rept for May 1995 for Perry Nuclear Power Plant Unit 1 + (ML20085G675)
- ML20085G679 + (ML20085G679)
- W3F1-2020-0018, Registration of Cask Use + (ML20085G680)
- ML20085G683 + (ML20085G683)
- NG-91-3169, Forwards Listing of Proposed Operator Licensing Exam Schedule for FY92-95,in Response to Generic Ltr 91-12 + (ML20085G687)
- ML20085G699 + (ML20085G699)
- ML20085G701 + (ML20085G701)
- ML20085G702 + (ML20085G702)
- 05000277/LER-1991-032, :on 910917,18 & 24,control Room Ventilation Sys Transferred to Emergency Ventilation Mode Due to Instrument Spikes in Main Control Room Radiation Monitor B.Caused by Wire Connector Short.Procedure Revised + (ML20085G704)
- ML20085G708 + (ML20085G708)
- ML20085G713 + (ML20085G713)
- ML20085G717 + (ML20085G717)
- ML20085G718 + (ML20085G718)
- ML20085G719 + (ML20085G719)
- ML20085G720 + (ML20085G720)
- ML20085G725 + (ML20085G725)
- ML20085G727 + (ML20085G727)
- NG-95-1893, Reactor Scram Due to FW Pump Trip Caused by Lube Oil Pump Coupling Failure.Maint Procedure, Vendor Manual & Plant Drawings for FW Pumps Being Revised to Ensure Proper Lubrication of Subj Coupling + (ML20085G729)
- ML20085G730 + (ML20085G730)
- ML20085G731 + (ML20085G731)
- ML20085G738 + (ML20085G738)
- 05000331/LER-1995-005, :on 950514,reactor Scram Occurred Due to FW Pump Trip.Caused by Lube Oil Pump Coupling Failure.Failed Coupling & Plugged Orifice Replaced & Coupling & Orifice for FW Pump a Inspected + (ML20085G740)
- ML20085G742 + (ML20085G742)
- ML20085G745 + (ML20085G745)
- ML20085G746 + (ML20085G746)
- ML20085G748 + (ML20085G748)
- 05000313/LER-1995-008, :on 950514,cooling Fan Associated W/Green Train of RB Emergency Cooling Sys Tripped Due to Failure of Drive End Thrust Bearing of Fan Motor.New Motor Ordered for Subj Fan & Will Be Installed Upon Receipt + (ML20085G752)
- ML20085G753 + (ML20085G753)
- ML20085G757 + (ML20085G757)
- 05000461/LER-1995-005, :on 950515,RRPs Tripped from Fast to Slow Speed Due to Fault in Reactor Recirculation Control Panel +/- 15 Volt Dc Field Bus Bars.Nest Assembly Which Contained Faulty Field Bus Bars Replaced W/Spare Nest Assembly + (ML20085G760)
- ML20085G762 + (ML20085G762)
- ML20085G768 + (ML20085G768)
- ML20085G776 + (ML20085G776)
- ML20085G784 + (ML20085G784)
- ML20085G788 + (ML20085G788)
- ML20085G789 + (ML20085G789)
- ML20085G790 + (ML20085G790)
- ML20085G796 + (ML20085G796)
- NRC-95-0058, Responds to NRC ,Confirmimg That W/Listed Differences,Mods Described in Util Re Removal, Replacement & Reclassification of Thermo-Lag 300-1 Fire Barriers at Facility Implemented,Per GL 92-08 + (ML20085G800)
- ML20085G804 + (ML20085G804)
- ML20085G808 + (ML20085G808)
- ML20085G811 + (ML20085G811)
- ML20085G819 + (ML20085G819)
- ML20085G823 + (ML20085G823)
- ML20085G828 + (ML20085G828)
- ML20085G835 + (ML20085G835)
- ML20085G836 + (ML20085G836)
- ML20085G839 + (ML20085G839)
- NUREG-1322, Acceptance Criteria for the Evaluation of Category I Fuel Cycle Facility Physical Security Plans + (ML20085G840)