Text
--
Y
?
n
..s
/ ;
i
[
i v
~,
TENNESSEE VALLEY AUTHOAITY MTT.
f CHATTANOOGA, TENNESSEE i 'i i
j 3740'l U L
'H
(,k [b5
. 3t
(
September 24, 1973
_n ff M MT5M^%
PART NI_ FMiHIP
$(.WAh l
{
\\
t' b'O i cp VA%#4v i
Y
- ff fff Mr. John !. O' leary, Director Q'
q V
Directorate of Li 2nning 1,j Office of Regulation A"
'/
U.S. Atomic Energy Comnission
/'[7ty (
Washington, DC 205h5
Dear Mr. O' leary:
TE!CIESSEE VALLEY AUTHORITY - EROWIIS FERRY I;UCI2AR PIluT U?IIT 1 -
i DOCTET Iio. 50-259 - FACILITY OPSRATING LICEI!SE DPR AE iORMAL OCCURRE !CE RSPORT BFAO 'l313W The purpose of this report in to provide details concerning the i
i s
malfunction of a differential pressure switch in unit 1 RCIC isolation logic at Browns Ferry I;uclear Plant on September 14, 1973 This occurrence was reported by telegram on September 14, 1973, to u
the Region II Directorate of Regulatory Operations, Atlanta, Georgia.
e Dercription of the Incident During routine curveillance testing on September 14, 1973, PdIS-71-1A vas found to operate outside the technical specification setting of c
equal to or less than 450 inches of water as specified in table 3 2.B.
i The as-found setting vac 457 inches of water.
The cwitch han two contacts in parallel that fom a trip logic in i
the trip system. The trip logic ccts to trip the RCIC turbine and isolate the system upon stera line high flow.
Since only 1 of the 2 channels is required operable and tne other channel tested i
satisfactorily, the logic vould have perfomed its intended function L
if required. The reactor was in the COLD, SRUTDOWN condition; and RCIC was not required.
g This is a Earton differeatial indicatin6 switch, Model 288, with a
[
range of 0-to-500 inches of vater.
It was last runctionally tested i
on nagust 1*(,1973, and was found satisfactory. The switch was inspected for catisfcetory clearance and freedom of operation and e
was recalibrated allowing for instrument accuracy.
Several operations of the switch were perfomed to ensure operability.
/
.fr
\\
'.U c 8308290303 730924 h"i bc ) 3 '
5 PDR ADOCK 05000259 a
V i
S PDR
')
r,,y1 n n
/
w COPY SENT REGION N
- i.. W
('?
G
_..A._.
V V
2 Mr. John F. 0 % ary September 2!+,1973 TENNESSEE V/.LLEY AUTl!ORITY - EROWNS FERRY HUCLEAR PIET UNIT 1 -
DOCKET NO. 50-259 - FACILITY OPERATIIC LICENSE DPR ABNORMAL OCCURRENCE RSPORT EFAo-7313W Thic instrument will be scheduled for testing once every two weeks until three concecutive tests prove caticfactory performance. At that. time, the original test schedule of once a month will be recumed.
Very truly yours, TENNESSEE VALIEY AUTEORITY Y
LL~ L' x
E. F. Thcmas
' Director of Power Production CC: