Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083M878 + (ML20083M878)
- ML20083M882 + (ML20083M882)
- 05000335/LER-1982-069-03, /03L-0:on 821227,control Element Assembly (CEA) 43 Slipped 45 Inches During Periodic CEA Exercise.Cause Not Determined.Cea 43 Restored to Normal Position + (ML20083M885)
- ML20083M888 + (ML20083M888)
- 0CAN118221, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/82-14 & 50-368/82-11.Corrective Actions: Procedure 1603.003, Radioactive Matl Shipments, Revised to Ensure Certification Attached to Shipping Papers + (ML20083M890)
- 2CAN128208, Responds to NRC Re Violations Noted in IE Insp Rept 50-368/82-32.Corrective Actions:Procedural Changes Will Be Made to Require Preplanning Re Design Change Package Installation + (ML20083M892)
- 3F0484-14, Forwards Third Quarterly Progress Rept,Crystal River Studies, Detailing Activities Completed Through Feb 1984. Util to EPA Encl + (ML20083M899)
- ML20083M903 + (ML20083M903)
- NRC-95-0056, Comment Supporting Proposed Rule 10CFR50 Re Primary Reactor Containment Leakage Testing + (ML20083M907)
- AECM-83-033, Interim Deficiency Rept Re Nelson Stud Failures on Embedded Plates.Initially Reported on 821221.Lab Testing of Plates in Progress.Deficiency Reported Per 10CFR21 for Unit 1 & 10CFR50.55(e) for Unit 2.Final Rept Expected by 830315 + (ML20083M910)
- 05000397/LER-1984-024, :on 840317,during Instrument Calibr,Control Room Emergency Filtration Units Initiated Due to Inadvertent Deenergization & Reenergization of Test Equipment.Personnel Cautioned.No Other Corrective Action Necessary + (ML20083M911)
- ML20083M914 + (ML20083M914)
- ML20083M919 + (ML20083M919)
- 0CAN018302, Responds to NRC Re Deviations Noted in IE Insp Repts 50-313/82-14 & 50-368/82-11.Corrective Actions:Mods During Current Refueling Outage to Be Completed as Scheduled & Review of LOCA Procedures Completed + (ML20083M920)
- W3P84-1005, Advises That Detailed Control Room Design Review Program Plan Scheduled for Submittal on 850131.Majority of Work Performed Prior to Issuance of Suppl 1 to NUREG-0737.Extra Time Needed to Reevaluate Position on Function Requirements + (ML20083M924)
- ML20083M925 + (ML20083M925)
- AECM-84-0215, Monthly Operating Rept for Mar 1984 + (ML20083M926)
- 0CAN098219, Informs of Investigation Initiated to Determine Validity of Deviation Noted in IE Insp Repts 50-313/82-14 & 50-368/82-11 Re NUREG-0578,Item 2.1.6.b, Design of Plant Shielding + (ML20083M927)
- ML20083M932 + (ML20083M932)
- ML20083M935 + (ML20083M935)
- ML20083M936 + (ML20083M936)
- ML20083M939 + (ML20083M939)
- ML20083M941 + (ML20083M941)
- ML20083M948 + (ML20083M948)
- ML20083M952 + (ML20083M952)
- ML20083M957 + (ML20083M957)
- ST-HL-AE-5087, Monthly Operating Repts for Apr 1995 for South Texas Project Electric Generating Station + (ML20083M958)
- ML20083M960 + (ML20083M960)
- RBG-41500, Monthly Operating Rept for Apr 1995 for River Bend Station + (ML20083M964)
- ML20083M965 + (ML20083M965)
- ML20083M966 + (ML20083M966)
- ML20083M973 + (ML20083M973)
- 05000364/LER-1981-010, Notifies of Typographical Error in Forwarding LER 81-010/03X-1.Ltr Mistakenly Referred to LER 82-043/01X-1 + (ML20083M976)
- ML20083M985 + (ML20083M985)
- ML20083M986 + (ML20083M986)
- ML20083M992 + (ML20083M992)
- ML20083M994 + (ML20083M994)
- ML20083M998 + (ML20083M998)
- ML20083N006 + (ML20083N006)
- ML20083N008 + (ML20083N008)
- ML20083N012 + (ML20083N012)
- LIC-95-0105, Monthly Operating Rept for Apr 1995 for FCS Unit 1 + (ML20083N014)
- ML20083N016 + (ML20083N016)
- B11114, Forwards Revised Responses to Power Sys Branch Mechanical Series Questions + (ML20083N021)
- ML20083N022 + (ML20083N022)
- ML20083N027 + (ML20083N027)
- 05000271/LER-1995-007, :on 950414,primary Containment Isolation Sys Invalid Actuation Occurred Due to Personnel Error When Operator Inadvertently Opened Breaker in Instrument Ac Power Supply.Isolation Signals Reset & SBGTS Secured + (ML20083N031)
- ML20083N032 + (ML20083N032)
- NRC-95-0048, Requests That Proposed TS Change Submitted by Re Calibr Interval Extension Be Designated as Cost Beneficial Licensing Action + (ML20083N036)
- ML20083N037 + (ML20083N037)
- 05000254/LER-1982-039, Forwards LER 82-039/03L-0 + (ML20083N039)