Forwards 45th Rept for Period Covering Apr-June 1984,per 730326 Memorandum & Order ALAB-106 & Amend 1 to CPPR-81 & CPPR-82.Info Withheld
ML20083M882
Person / Time
Site: Midland
Issue date: 03/30/1984
From: Jackie Cook
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19268E811 List:
References
28074, ALAB-106, NUDOCS 8404180378
Download: ML20083M882 (5)


Text

_ - _ _ _ _ - _ _ _ _

s,.

r-ConSumBIS l

power Company na ~ sis

- ~i<<ts. e zi ri s a J Co structio.

i General offices: 1945 West ParnaH Road, Jackson, MI 49201 e (517) 788-0453 March 30, 1984

/^

Director of Office of Inspection and Enforcement Att Mr Richard C DeYoung US Nuclear Regulatory Commission Washington, DC 20555 MIDLAND PROJECT - ALAB-106 QUARTERLY REPORT DOCKETS NOS 50-329 AND 50-330 FILE:

0.4.6 SERIAL

28074 Pursuant to the second and third conditions of the Memorandum and Order ALAB-106 dated March 26, 1973, and Amendment No 1 to the Midland Plant Construction Permits, we are submitting ten copies of our forty-fifth (45th) report covering the period April 1, 1984 through June 30,1984.

JWC/WRB/1r CC:

RJCook, USNRC Resident Inspector Midland Nuclear Plant JGKeppler, NRC Region III s

b 9

I, 8404180378 840330 PDR ADOCK 05000329 Qh CM*

43

  1. M g enf**pf gM OC0384-0048A-MP01 N

J v

Enclosure to Serial 28074

/

CONSUMERS POWER COMPANY j

REPORT # 45, MARCH 31,1984 Pursuant to Conditions 2FB and 2FC of Construction Pet.' tits CPPR-81 and CPPR-82, the following report covers the period April 1, 1984 through June 31, 1984.

A) Construction work to be performed during this period.

See Attachment A.

B) Personnel with quality related duties who were assigned to the Midland Project during the period January 1,1984 through March 31, 1984, and who are expected to be on site through June 30, 1984, and who will be trained as necessary to perform the functions required to them, are as follows:

1) Midland Project Quality Assurance / Quality Control Anderson, B P Mech CPCo Arndt, R A Mech PDS Ashworth, A C Civil SAI Astle, A T Mech BPC0 Bakhtiari, S Civil AE CPCo Barkley, J W Spec Proj G/C Binderman, P R Mech CPCo Braund, D L Civil BPC0 i

Brown L E Spec Proj G/C Brown R G Spec Proj G/C Carlson, R A HVAC EC&G derv

[

Collins, W S Hech Bestco j

Cowgill R A Mech PDS Deschambeau, J F Civil PBC0 l

Dyer C V Mech Butler i

Evans, F G MPQAD Brown & Root Elec l

Fulcher, B D Design Qual CPCo Gaskill, R A Elec CFCo Gross R L Mech PDS l

Cumbel, D D Mech BPCO Hill, S M Mech BPCO Hoff, J E Civil CPCo Hollar, E E Spec Proj G/C Houle, G J Mech CPCo Keathley, M D Civil CPCo Kexel, J R Elec CPCo LaFever, D Mech CPCo Lambert, J K Mech PDS

(

.Lawhorn, D B Mech BPC0 j

Lindblom, W M Mech BPCO OC0384-0048A-MP01 u

e

]

Enclo ure to S2 rial 28074

(

Lopez, J B Soils B'PC0 Lynch, K B Mech CPCo Mcdonald, G QAE Butler Nicholas, J A Site Audit G/C Nummerdor, W E QC Elec CPCo Pendergast, RD Elec CPCo Pulliam, K H Civil CPCo Quinn, H L Elec BPC0 Read, W B Mech BPC0 Reardon, L J Spec Proj G/C Schifferer, H Grp 1 Sys BPC0 Smith, C H W/NDE CPCo Spinks, C L Promt AE Grp SAI Switanek, A P Mech BPC0 Turkowski, E Mech BPC0 Vigus, D H Mech CPCo Wagonseller, R L Plan & Sched G/C Wolfe, C S DQAE/ Ann Arbor BPC0 Zimmerman, J L HVACA CPCo C) Quality Assurance qualifications of supervisors and engineers listed in B above are attached to this report.

D) The following personnel no longer are performing quality-related tasks at the Site:

Bacon, G M QC Elec Butler Barnhart, R S QC Mech Butler Bible H S QC Elec Butler Bigham R D Elec Rcwy/Suppt Volt Blamer E J QC Mech UST Bogaerts, E PQAE BPC0 Boknecht, J M QC Training Butler Boylan, M D QC Elec BPCO Brandt, EJ QC Elec BPC0 Brock, A W QC Elec Lincoln Browne C D QC Elec BPCO Buchanan, H K T/0 AS PAC Calaway, M G QC Civil BPC0 Cochran, G P QC Mech BPCO Cole, G E Grp 1 Sys Team BPCO Cushman D P Mech PAC Danbury, R A Grp 2 Sys Team BPC0 Davies, D L QC Civil UST Edmondson, F J QC Mech BPCO Fisher, J A Mech PAC Fitzgerald, G J Civil Insp Eval Lincoln Friedrich, W J MAC OC0384-0048A-MP01

r Enclosure to Ssriel 28074

/

f

~

Gardner, D S QC Mech Butler Gaston, G P QC Elec PDS Cebhart, R P QC Mech Butler Gorban K P QC Elec Butler Gouveia, L A PAC Hahn, T M QC Elec G/C i

Hilton, R L GYGNA Hyde, J A QC Elec UST Ingram, T R QC Training G/C Johnson, M D QC Elec Butler Jones, E L QC Elec PAC Keeney, M E QC Civil BACO Kelly, W H QC Mech TAD Lambert, H J QC Mech EG&G Lee, J W QC Mech UST Lockler, M E Mech Hanger PDS Lokshin, S QC Elec BPCO Mackall, A B QC Mech Butler Maloon, R F-QC Mech BPCO' Martin, D Weld & NDE Grp EG&G Mcdonald, G QC Elec Butler McGill, H T QC Elec UST-McGovern, G Princ Qual Adv PAC McMunn, R T I&C G/C Miller, M A Hangers BPCO Mohney, J J QC Reeving /Insp BPCO Moseby, G A QC Mech Lincoln Mrazik, S V Elec Welding TAD Nelon, M S QC Civil BPC0 Neumann, T R QA Training UST Norberg, C D Grp 3 Sys Team BPC0 Passanante, S R QC Mech BPCO Pastor, J A I&C CPCo Pitcock, G S QC Hech BPCO Rebok,~M C QC Mech Lincoln Sabo, D K DQAE/ Ann Arbor BPCO Saucier, A E QC Hech Butler Schroder, B J Mech Butler Shaw, L R QC Mech Butler-l Sions, J L QC Elec Volt' i

Smedley, D L QC Training CYGNA Smith C E QC Mech PDS-Spitulnik, J QC Training CYGNA Sturgill Z G QC Mech Volt l

Sudduth, D V Doc Ver DMA l

t i

I l

L OC0384-0048A-MP01

F 1

Enclosura to Serial 28074 i

f Taylor, B M Bulk Hanger Grp iPC0 Taylor, D R Grp 3 Sys Team BPCO Trowbridge, S Plan & Sched PMA Vigus, D H QC Mech CPCo Walker, L M QC Elec SAI Wirfs, D M QC Elec BPCo Wolfe, C S DQAE/ Ann Arbor BPCo Woodley, T L Area Teams BPCO Zelinske, T J QC Elec SAI.

E) The following B&W Construction personnel are no longer performing quality-related tasks at the Site:

Hight, G W B&W OC0384-0048A-MP01