Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-95-0070, Forwards Public & Proprietary Versions of Revised Epips, Including Page 2 to EPIP Index,Rev 12 to EPIP-RR-13,rev 11 to EPIP-RR-17A,page 1 to FC-EPF Index (Issued on 950302 & 08),rev 4 to FC-EPF-9 & Rev 6 to FC-EPF-23 + (ML20081J721)
- ML20081J727 + (ML20081J727)
- ML20081J729 + (ML20081J729)
- ML20081J735 + (ML20081J735)
- ML20081J739 + (ML20081J739)
- ML20081J741 + (ML20081J741)
- ML20081J742 + (ML20081J742)
- ML20081J747 + (ML20081J747)
- ML20081J757 + (ML20081J757)
- ML20081J763 + (ML20081J763)
- ML20081J765 + (ML20081J765)
- ML20081J766 + (ML20081J766)
- ML20081J767 + (ML20081J767)
- BECO-95-036, Submits ISI Plan for 1995 Refueling Outage 10 as Required by 10CFR50.55a + (ML20081J772)
- ML20081J779 + (ML20081J779)
- ML20081J783 + (ML20081J783)
- ML20081J788 + (ML20081J788)
- ML20081J790 + (ML20081J790)
- ML20081J795 + (ML20081J795)
- ML20081J808 + (ML20081J808)
- ML20081J815 + (ML20081J815)
- 05000334/LER-1995-003, :on 950219,mode Selector Switch Accidently Placed in Operate Position Instead of Inhibit Position in Preparation of Containment Isolation Trip Test.Caused by Personnel Error.Safety Injection Signal Reset + (ML20081J818)
- 1CAN039501, Forwards Rev 0 to 94R-1009-03, ANO 1 Cycle 13 Colr + (ML20081J824)
- ML20081J825 + (ML20081J825)
- ML20081J829 + (ML20081J829)
- ML20081J832 + (ML20081J832)
- ML20081J841 + (ML20081J841)
- ML20081J850 + (ML20081J850)
- ML20081J852 + (ML20081J852)
- ML20081J856 + (ML20081J856)
- ML20081J857 + (ML20081J857)
- ML20081J862 + (ML20081J862)
- ML20081J864 + (ML20081J864)
- ML20081J866 + (ML20081J866)
- 05000336/LER-1995-007, :on 950219,fire Watch Found Sleeping in Auxiliary Bldg.Caused by Personnel Error.New Fire Watch Assigned to Affected Areas & Tours of Continuous Posts by Fire Watch Supervisors Increased + (ML20081J876)
- ML20081J886 + (ML20081J886)
- ML20081J887 + (ML20081J887)
- 05000456/LER-1995-002-07, :on 950222,insp Revealed That Line Ended W/Open Elbow Directed Into Floor Drain in Unit 1 AF Tunnel.Caused by pre-service Deficiency.Required Check Valves Installed in Unit 1 Drain Line from Unit 1 AF Tunnel + (ML20081J895)
- 05000353/LER-1995-005, :on 950220,partial Group Vic Primary Containment & Rv Isolation Control Sys Actuation Occured Due to Potentially Malfunctioning +20 Vdc Power Supply.Replaced +20 Vdc Power Supply & Removed Electrical Jumper + (ML20081J899)
- ML20081J900 + (ML20081J900)
- 05000369/LER-1995-002-01, :on 950221,Train a of Control Room Ventilation Sys Judged Technically Past Inoperable Occurred.Caused by Inadequate Review of Cumulative Effects of Field Changes. Throttling Procedure Put in Place + (ML20081J905)
- ML20081J910 + (ML20081J910)
- ML20081J913 + (ML20081J913)
- ML20081J919 + (ML20081J919)
- ML20081J928 + (ML20081J928)
- ML20081J932 + (ML20081J932)
- ML20081J936 + (ML20081J936)
- 05000414/LER-1995-001, :on 950221,automatic Reactor/Turbine Trip Occurred.Caused by Degraded Optical Isolator within Control for Msiv.Testing & Replacing Degraded Isolators in Control Cicuitry for MSIV + (ML20081J937)
- ML20081J938 + (ML20081J938)
- ML20081J939 + (ML20081J939)
- ML20081J946 + (ML20081J946)