Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 3F0295-06, Submits Plans for Performing Integrated Leak Rate Testing. Current Isi/Ist Interval for Unit 3 Started in Mar 1987 & Ends in Mar 1997 + (ML20080H699)
- ML20080H711 + (ML20080H711)
- ML20080H724 + (ML20080H724)
- ML20080H729 + (ML20080H729)
- 05000338/LER-1984-001, :on 840109,plant Shut Down Due to High RCS Unidentified Leakage.Caused by Defective Tubes & Leaking Tube Plugs.Tubes Plugged & Leaking Plugs Repaired + (ML20080H730)
- ML20080H733 + (ML20080H733)
- BSEP-83-4063, Responds to NRC Ltr Re Significant Finding C Noted in IE Insp Repts 50-324/80-43 & 50-325/80-45.Corrective Actions: Improved Sys for Condensor Pit Releases Will Be Completed by 840630 + (ML20080H738)
- RBG-16-929, Interim Deficiency Rept DR-158 Re ITE-32D Relays Supplied by Brown Boveri.Investigation Incomplete.Next Rept Will Be Provided by 840418 + (ML20080H748)
- ML20080H766 + (ML20080H766)
- ML20080H776 + (ML20080H776)
- ML20080H778 + (ML20080H778)
- 05000278/LER-1983-022-03, /03L-0:on 831207,4 Kv Emergency Bus Undervoltage Relay IVA-127 Failed to Operate.Caused by Binding of Relay Rotating Disk Due to Dust Buildup.Relays Cleaned,Tested & Returned to Svc + (ML20080H785)
- ML20080H787 + (ML20080H787)
- 05000289/LER-1983-046, Revised LER 83-046/01T-1:on 831214,nuclear safety-related Circuit for make-up Pump Lube Oil Pressure Trip Found Incorrectly Routed.Caused by Design Oversight.Circuits for make-up Pumps Rerouted in Raceways + (ML20080H789)
- ML20080H792 + (ML20080H792)
- ML20080H798 + (ML20080H798)
- 05000327/LER-1984-002-02, :on 840112,actuation of High Radiation Alarm Caused Auxiliary Bldg Ventilation Isolation.Caused by Voltage Spike Generating Electromagnetic Interference W/ High Radiation Causing Trip + (ML20080H805)
- TXX-4101, Interim Deficiency Rept Re Defective Delaval Piston Skirt Castings for Diesel Generators.Piston Skirt Castings Will Be Replaced W/Casting Provided by Supplier by May 1984 + (ML20080H812)
- ML20080H814 + (ML20080H814)
- ML20080H822 + (ML20080H822)
- ML20080H826 + (ML20080H826)
- ML20080H832 + (ML20080H832)
- ML20080H835 + (ML20080H835)
- ML20080H841 + (ML20080H841)
- ML20080H847 + (ML20080H847)
- ML20080H850 + (ML20080H850)
- LIC-95-0047, Monthly Operating Rept for Jan 1995 for Fort Calhoun Station Unit 1 + (ML20080H862)
- ML20080H865 + (ML20080H865)
- ML20080H866 + (ML20080H866)
- ML20080H875 + (ML20080H875)
- ML20080H876 + (ML20080H876)
- HL-4781, Submits Addl Info Requested by NRC Re Recent Core Shroud Mod on Plant Unit 1 + (ML20080H884)
- ML20080H889 + (ML20080H889)
- ML20080H892 + (ML20080H892)
- ML20080H893 + (ML20080H893)
- RBG-16-926, Interim Deficiency Rept DR-103 Re Lifting Lugs on Containment Dome.Investigation Ongoing.Interim or Final Status Rept Will Be Submitted by 840316 + (ML20080H906)
- ML20080H923 + (ML20080H923)
- ML20080H927 + (ML20080H927)
- ML20080H935 + (ML20080H935)
- 05000263/LER-1984-004, :on 840110,emergency Filtration Train Transferred to Emergency Mode in Control Room Hvac.Caused by Chlorine Monitor Tape Cassette Running Out,Resulting in Tape Break & Spurious Monitor Trip + (ML20080H938)
- ML20080H940 + (ML20080H940)
- BECO-LTR-95-019, Comments on Proposed Policy Statement on PRA Methods in Nuclear Regulatory Activities + (ML20080H941)
- 05000328/LER-1984-001-02, :on 840105,containment Ventilation Isolation Occurred When High Radiation Alarm Actuated.Caused by Voltage Spike.Isolation Reset & Flow Switches Mounted on Shock Absorbing Rubber Mounts + (ML20080H947)
- ML20080H950 + (ML20080H950)
- ML20080H951 + (ML20080H951)
- ML20080H958 + (ML20080H958)
- ML20080H960 + (ML20080H960)
- 05000280/LER-1984-001-01, :on 840106,overtemp delta-T Signal Tripped Reactor.Caused by Power Surge During Gaitronics Sys Maint. Gaitronics Sys Test Will Be Written & Performed & Results Will Be Used to Develop Procedure + (ML20080H966)
- RBG-41197, Special Rept:On 950119,Div II EDG Experienced Invalid Failure When Diesel Room Standby Ventilation Fan Breaker Failed During Monthly Div II EDG Operability Test.Ge Type AKR-30 Breaker Returned to Vendor for Detailed Evaluation + (ML20080H968)
- ML20080H974 + (ML20080H974)
- ML20080H979 + (ML20080H979)