l OUISIANA P O W E F1 & L 1 G H T! P O Box coos. NEW OHLEANS. LOUIStANA 70174 242 oninoNot staEu

. (5041 366 2345 UrION s"<sYIU February 3, 1984 W3K84-0242 Q-3-A35.07 Mr. John T. Collins Regional Administrator, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012 REFERENCF: Telecon L. Hooper (LP&L) and J. Boardman (NRC Region IV) on December 22, 1983 Telecon C. Hooper (LP&L) and W. Crossman (NRC Region IV) on January 20, 1984 Telecon C. Hooper (LP&L) and J. Tapia (NRC Region IV) on January 30, 1984

Dear Mr. Collins:

SUBJECT:

Waterford SES Unit No. 3 Docket No. 50-382 Potentially Reportable Deficiency No. 141

" Deficient 4160V (GE) Switchgear Terminations" Final Report On December 22, 1983, a problem with deficient (GE) switchgear terminations was reported as Potentially Reportable Deficiency No. 141. Further evaluation of the previously described condition indicates this condition is not considered reportable pursuant to the requirements of 10CFR50.55(e).

EVALUATION Control wiring in the GE switchgear does generally employ pre-insulated ring tongue connectors. However, because of the terminals on the Knox fuse block, CE modified the pre-insulated lugs to accommodate the terminals and also used spade type lugs.

General Electric stated that various combinations of lugs used on the Knox fuse blocks were used in the prototype test program for seismic qualification.

Hence, the seismic qualification is valid.

Based on the above evaluation, this PRD is considered not reportable.

Very truly yours, M

T. F. Cerrets Corporate Quality Assurance Manager TFG:CNH:5STG 8402140319y40Og

~

gDRADOCK PDR I.E-2 7 g

i

4 v

Mr. John T. Collins February 3, 1984 W3K84-0242 Page 2 cc: Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D.C.

20555 (15 copies)

Director Office of Management Information and Prcgram Control U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Mr. E. L. Blake Shaw, Pittman, Potts, & Trowbridge 1800 M Street, N.W.

Washington, D.C.

20036 Mr. W. M. Stevenson Monroe & Lemann 1424 Whitney Building New Orleans, Louisiana 70130

.