ML20080H892

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Jan 1984
ML20080H892
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 01/31/1984
From: Dietz C, Harrison F
CAROLINA POWER & LIGHT CO.
To: Deyoung R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
BSEP-84-0025, BSEP-84-25, NUDOCS 8402140364
Download: ML20080H892 (13)


Text

e ,

APPENDIX B' AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0325 UNIT ~ BRUNSWICK UNIT 1 DATE 02/07/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 JANUARY 1984-DAY ' AVG. DAILY POWER LEVEL. DAY AVG. DAILY POWER LEVEL (MWE-NET) (MWE-NET) 1 ,

798. 17. 799

'2 ' ?4 18 798

. .3 1799 19 796

<4 800 20- 799 5' '- 799- . :21 673-6 785- -22 767

.7 774 23- 753 8 796' 24 -

790-9 798' 25 795

~.10 798 26 793 11 L798 27 792

-12 799 'M3 785 13- 800 29 786 14 787 30 702 15 794 31 -4 16 799 1

1'16 - 8

[6

$$0'i$$$I*o!$$$$$4 i

R PDR { [l L -.

M r -

U ,, .

OPERATING DATA REPORT DOCKET NO. 050-0325

- DATE 02/07/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521

' OPERATING STATUS:

it'. UNIT NAME: BRUNSWICK UNIT 1 1 NOTES I

2. REPORTING PERIOD: JANUARY 84 I i
3. LICENSED THERMAL POWER (MWT): 2436 l l 4.. NAMEPLATE' RATING (GROSS MWE): 867:0 I i

-5.: DESIGN ELECTRICAL RATING (NET MWE): 821.O' I I

6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I i

-7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT,

.GIVE REASONS:

9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MUE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 744.00 60265.00
12. NUMBER OF HOURS REACTOR CRITICAL 721.73 721.73 37119.71
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 721.73 721.73 34810.26 '

'15. UNIT RESERVE SHUTDOWN HOURS .00 .00 . 00 l 16. GROSS THERMAL. ENERGY GEN. (MWH) 1725331.10 1725331.10 70152625.67

17. GROSS-ELEC. ENERGY; GEN. (MWH) 579976.00 579976.00 23127027.00 7

18.-NET ELEC. ENERGY GENERATED (MWH) 565046.00' 565046.00 22178886.00

'19. UNIT SERVICE' FACTOR. 97.01 97.01 57.76

20. UNIT AVAILABILITY FACTOR 97.01 97.01 57.76
21. UNIT CAP. FACTOR (USING MDC NET) 96.14 96.14 46.59

-22. UNIT CAP. FACTOR (USING DER NET) 92.51 92.51 44.83 23.'1 UNIT FORCED OUTAGE RATE 2.99 2.99 22.78

24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

225.~IF SHUTDOWN'AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:

26.2 UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED L - INITIAL CRITICALITY. -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

[

r o

1.16 - 9

APPENDIX

-DOCKET NO.: 050-325 UNIT: Brunswick No. 1 DATE: January 1984 COMPLETED BY: Frances Harrison :

OPERATIONS

SUMMARY

' BRUNSWICK UNIT NO. 1 Brunswick Unit No. 1. operated at a 97.0% availability factor for the month of January with a 96.1% capacity factor. There was one off-line outage and three power reductions. Details are in Appendix D, The Unit Shutdowns and Power Reduction Log.

There are 656 BWR and 160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswick 1 DATE Feh rt in mr - 1984 January 1984 COMPLETED BY Frances' Harrison REFORT MONTH TELEPHONE (919) 457-9521 n.

, .]? 3j .Yh Licensee g r, e. Cause & Currective No. Date g 3g 2s5 Event p g"g Action it H

fE 5 y e gj =! Report # mU o u

Prevent Recurrence 6

I 84-002 840106 S .00 B 5 NA ZZ XXXXXX Reduce power 80% to perform I&C Response Time Testing on MSIV's, TCV, TSV TCV weekly, turbine bypass and CIV's.

I 2- 3 4 F: Forced Reason: Method:- Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 .-lutomatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 0161)

E-Operator Training & License Examination le-Continuat. tons F-Administrative 5-Load Reductions 5 G-Operational Error (Explain) 6-Other Exhibit I Same Source (9/77) 110ther (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT NAME Brunswick 1 DATE February. 1984 January 1984 COMPLETED BY Frances Harrison REPORT MONTH 'ELEPHONE (919) 457-9521 3 -

g"

= . .3m -

.E _r: E EN LIC'"58' "'u c. Cause & Corrective No. Date g 3_g g 2g5

,3 Event u? 8'E Action to H

$5 5 j di g Report # E0 ' Prevent Recurrence d

84-003 840121 F .00 A 5 NA CB PUMPXX 1B Rx Recirc pump tripped.

i i

a

! 1 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A Equiprnent Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

E-Operator Training & Ucense Examination l-Continuat.

i Ions F Administrative 5-Load Reductions 3 G-Operational Error (Explain) 6-Other Exhibit I - Same Source P8/77) Il-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0325 UNIT N AME Brunswick 1 DATE February, 1984 REPORT MONT11 January 1984 COMPLETED BY Frances Harrison TELEPHONE M 9I 45Y-9521

. . ":= -

c

-, jE 3 .* E5 Licensee h y*, Cause & Corrective No. Date i 3g 4 1s5 Event g- pU Action to t-y5 5 j gjj g Fepor x mO g Prevent Recurrence di 84-004 840124 S .00 B 5 NA --

Reduced power for rod shuffle.

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 0161)

E-Operator Training & License Examination I-Continuat.

t ions F-Administrative 5-Load Reductions 5 G-Operational Error (Explain) 6-Other Exhibit 1 - Same Source (9/77) Il-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-037s UNITNAME Brunswick 1 DATE February 1984 nances starr.tson COMPLETED BY REPORT MONTH January 1984 TELEPHONE W W 43/-DZ1 e.

- E E

- 5 'E Licensee En E% Cause & Corrective No. Date H

h j! k ) (E U$ Report a Event (i

mV hU Action to jE E j ;ji g g Prevent Recurrence d

4 84-006 840131 F In A 1 NA XX VESSEL Unit separated from grid for drywell

Progress floor drain leakage repair.

4 1

1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 0161)

E-Operator Training & License Examination 4-Continuations F-Administrative 5-Load Reductions 5 G-Operational Error (Explain) 6-0ther Exhibit I - Same Source 01/77) II-Other (Explain)

4 V

{-

s +

APPENDIX B

' AVERAGE DAILY POWER LEVEL DOCKET NO. 050-0324 UNIT BRUNSWICK UNIT 2 DATE 02/07/84 COMPLETED BY FRANCES HARRISON

, f- . TELEPHONE (919)457-9521 fJANUARY , 1984 '

' DAY' AVG. DAILY POWER, LEVEL DAY AVG. DAILY POWER LEVEL

- (MWE-NET) -

e (MWE-NET) 1- -10 .- j7 720

'~

'2'

-10 18 655

~~

3 -10 -

ff ;19- 764 ,

s, s , .-

755

. _4 _ _ _

l'-11 3

/ +

'_ ./ .

5  : .' 135 l,

,s','2i,, / .._.

.706

~

. , y '

c6  : J416 .

~ 22 -

716

.1 : 5 4

' :7; 408 _23 , 712~

, v

-, / '

. ' , p:' ':l.

8

~

'A06 ~. ..

24' '. 724 1/ > _, .

/

9 ' 437, 25 724

, -/ ,

+

10 -

  • 5732, 26 727

, . '11 - e, # 27 722 653

- ,3,e- ,

[,e

12 ' 703 28.. 719

- e" - c L13 e ' -

639* '29 ' # 720 E

54h

^s

  • 509- SO 724 15 711 /-a '

,-31 724

'[ , .

-vi ,/ , ,

21 6 706- '

r __ _

.c .,

r i

n .-

-0 l ' ':.

4 . .

  • - *~ ' A 4 .a e- , _ . . ,
  • o , / ,,' - A

'\ j s y me ., ., 1 .

~

4; y ',

1 L'

} 1/16 - 8 f- , ,s a e. ,

  1. ? *- * '

p* '

i( ^

I

%s MF $

,y / , f - , , , , . , y~ _ . _ ,. .,.-.y. ..

.c__ ,-,m,.n-,- - , - . , .y . , . , , , -,.,,.,, .- -,-- ~,. _. -

OPERATING DATA REPORT DOCKET NO. 050-0324 DATE 02/07/84 COMPLETED BY FRANCES HARRISON TELEPHONE (919)457-9521 OPERATING STATUS

1. UNIT NAME: BRUNSWICK UNIT 2 i NOTES I
2. REPORTING PERIOD: JANUARY 84 I I
3. LICENSED THERMAL F0WER (MWT): 2436 I i
4. NAMEPLATE RATING (GROSS MWE): 867.0 l I
5. DESIGN ELECTRICAL RATING (NET MWE): 821.0 l  ;
6. MAX DEPENDABLE CAPACITY (GROSS MWE): 815.0 I

, 7. MAX DEPENDABLE CAPACITY (NET MWE): 790.0 -------------------------------

8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE):
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 744.00 72289.00
12. NUMBER OF HOURS REACTOR CRITICAL 666.80 666.80 45394.22

- 13 . REACTOR RESERVE SHUTDOWN HRS .00 .00 .00

14. HOURS GENERATOR ON LINE 638.93 638.93 42424.40
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 1275456.47 1275456.47 79852177.49
17. GROSS ELEC. ENERGY GEN. (MWH) 423307.00 423307.00 26533005.00
18. NET ELEC. ENERGY GENERATED (MWH) 409420.00 409420.00 25437238.00
19. UNIT SERVICE FACTOR 85.88 85.88 58.69
20. UNIT AVAILABILITY FACTOR 85.88 85.88 58.69
21. UNIT CAP. FACTOR (USING MDC NET) 69.66 69.66 44.54
22. UNIT CAP. FACTOR (USING DER NET) 67.03 67.03 42.86
23. UNIT FORCED OUTAGE RATE .26 .26 15.77
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

OFF-GAS / CONDENSER RETUBING 3 10-15-84 5500 hrs.

25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORCAST ACHEIVED INITIAL CRITICALITY - - - - - - - - --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- - - - - - - - -

1.16 - 9

y -

s s s .

- x-

~*c" . ) , --- ~

^ '

.e ,,

.' ~

% . APPENDIX

,, s

s.  %.

[._ ,

.c w ,

DOCKET NO.: 050-325

, c. UNIT: Bruntwick No. 2 m

. . DATE: January 1984

,s COMPLETED BY: Frances Harrison

~

~

n .

c.

s s.

% v w

- ., w

-s . ,

w

s. s -

OPERATIONS

SUMMARY

..o'i .% ./ ERUNSWICK UNIT NO. 2 s,

% 6 '%e

    • J .

Brunswick Unit.N d '2 operated at an 85.9% availability factor for the month of

^ January with g69.7% capacity factor. There was one off-line outage and one y power reduction. ,; Details are in Appendix D, The Unit Shutdowns and Power Roduction Log. xThe unit is operating at rodcced power (94%) due to ist stage drEin tank' East MSR manway gasket leak. '

s

e. ,

There are'656 BWR and-160 PWR spent fuel bundles in the Brunswick No. 1 fuel pool. .

.g.-- %;,

. =, * -

4 , .- .

'. . i s _%  % ,

O 4 e J

.s

.p, -

o% 9

% g u

~

m k 4 D

Y Q- .

-s r n

,m M'#

9 N

g N

-y f"

~ ,

I.

j .'s' *. . -

.C-

't g

_s w g- -

y . - - - -. - . , ,,, , -- e . . , - - . . , , . , - , . - , y w,,,-yp,. , , , . .m-,>e.,- --m., y< ,--.

UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 050-0324 UNIT NAME Brunswick 2 DATE Febr uar v 14R4 COMPLETED Sy Frs.nces Harrison REPORT MONTtt January 1984 TELEPHONE (919) 457-9521

- E E

, 5E 3 j E5 Licensee j-r, ge, Cause & Corrective

%. Date g 3g R 2g5 Event gy g3 Action to

$: 5 j@g Report a mU g' Prevent Recurrence 6

84-004 840114 F 1.65 A 1 NA XX HTEXCH Removed U-2 generator from grid to repair EHC oil leak on CIV-4.

Replaced 0-ring with new Viton 0-ring which is the type material required in an EHC Oil System.

i l 2 3 4 F: Forced Reason: Method: Exhibit G. Instructions

. S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

- E-Operator Training & Ucense Examination J-Continuat.ons i

F-Administrative 5-Load Reductions 5

. Goperational Error (Explain) 6-Other Exhibit I - Same Source

. (9/77) li-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 090-ov4 UNIT NAME Brunswick 2 DATE February 1984 REPORT MONTH January 1984 COMPLETEU BY Frances Harrison TELEPHONE (919) 457-9521 No. Date g

!?

3 gj 3j E

,;g g 5 Licensee Event 5 r, u '2 he.

c.

Cause & Corrective Action to

$5 $ j dj g Report # E0 f'3 Prevent Recurrence d

84-007 840118 S .00 B 5 NA --

Reduced power for rod improvement.

5 i

1 2 3 4 i F: Forced Reason: Method: Exhibit G-Instruction.s

, S: Scheduled A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3. Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 0161)

, E-Operator Training & License Examination l-Continuat. sons i

. T. Administrative 5-Load Reductions 5 G-Operational Error (Explain) (,-Other Exhibit I SameSource P)/77) II-Other (Explain)

em La_u.... m .

Carolina Power & Light CoTipany tat::L-.x-wa Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461-0429 February 6, 1984 FILE: B09-13510C SERIAL: BSEP/84-0025 Mr. R. C. DeYoung, Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 LICENSE NOS. DPR-71 AND DPR-62 DOCKET NOS. 50-325 AND 50-324 MONTHLY OPERATING REPORT

Dear Mr. DeYoung:

In accordance with Technical Spu ification 6.9.1.6 for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2, Carolina Power & Light Company herewith submits the report of operating statistics and shutdown experience for the month of January 1984.

Very truly yours, C. R. Dietz, General Manager Brunswick Steam Electric Plant FH/jsa/LETJA Enclosures cc: Ms. J. C. Baker Mr. S. W. McDowell Mr. J. P. O'Reilly Mr. S. L. Rosen