Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080A800 + (ML20080A800)
- ML20080A806 + (ML20080A806)
- ML20080A807 + (ML20080A807)
- ML20080A809 + (ML20080A809)
- 2CAN119403, Monthly Operating Rept for Oct 1994 for ANO-Unit 2 + (ML20080A815)
- 1CAN119403, Monthly Operating Rept for Oct 1994 for ANO Unit 1 + (ML20080A817)
- ML20080A820 + (ML20080A820)
- 05000269/LER-1983-013-01, /01T-0:on 830623,during Video Insp of Fuel Assemblies,Three or Four Broken hold-down Springs Found. Caused by Component Failure Due to Fatigue Induced Cracking at Existing Flaw.Springs Will Be Replaced + (ML20080A824)
- ML20080A828 + (ML20080A828)
- ML20080A829 + (ML20080A829)
- ML20080A830 + (ML20080A830)
- ML20080A831 + (ML20080A831)
- ML20080A832 + (ML20080A832)
- ML20080A833 + (ML20080A833)
- ML20080A834 + (ML20080A834)
- 05000362/LER-1984-001, :on 840101,precautionary Penetration & Radwaste Bldgs Evacuation Initiated When Units 2 & 3 Area Radiation Monitors & Plant Vent Stack Monitors Alarmed.Caused by Routine Draining of Waste Gas Header Line + (ML20080A836)
- ML20080A840 + (ML20080A840)
- ML20080A843 + (ML20080A843)
- ML20080A845 + (ML20080A845)
- ML20080A849 + (ML20080A849)
- ML20080A851 + (ML20080A851)
- ML20080A854 + (ML20080A854)
- ML20080A855 + (ML20080A855)
- ML20080A857 + (ML20080A857)
- ML20080A858 + (ML20080A858)
- ML20080A861 + (ML20080A861)
- ML20080A864 + (ML20080A864)
- NRC-94-4343, Provides Info to Closeout Status of Evaluation of Deviation or Failure to Comply Pursuant to Requirements of 10CFR21 + (ML20080A865)
- ML20080A867 + (ML20080A867)
- ML20080A868 + (ML20080A868)
- ML20080A871 + (ML20080A871)
- 3F0184-21, Forwards Planned Changes to Modified Amended Security Plan, Rev 2.Changes Withheld (Ref 10CFR73.21) + (ML20080A873)
- 2CAN119404, ANO Unit 2 10CFR50.59 Rept for Period 930122-940423.W/ + (ML20080A874)
- ML20080A876 + (ML20080A876)
- RBG-41059, Monthly Operating Rept for Oct 1994 for River Bend Station Unit 1 + (ML20080A878)
- ML20080A879 + (ML20080A879)
- NRC-84-0018, Forwards Rev 13 to Fsar.Rev Contains Info Necessary to Resolve Licensing Confirmatory Issues 12 & B.13 Identified in Callaway & Wolf Creek Sers,Respectively + (ML20080A880)
- ML20080A884 + (ML20080A884)
- ST-HL-AE-1049, First Interim Deficiency Rept Re Pipe Stress Analysis Design Process.Initially Reported on 831228.Evaluation of Concerns Listed in Engineering Assurance Program Design Assessment Review 83-3 Continuing.Next Rept by 840301 + (ML20080A886)
- ML20080A888 + (ML20080A888)
- ML20080A889 + (ML20080A889)
- ML20080A894 + (ML20080A894)
- ML20080A897 + (ML20080A897)
- ML20080A900 + (ML20080A900)
- B15031, Provides NRC Staff W/Info Requested in Assoc W/Aug 1994 Millstone Unit 2 Reactor Coolant Pump Motor Lubricating Oil Collection Sys Mod + (ML20080A901)
- ML20080A903 + (ML20080A903)
- ML20080A904 + (ML20080A904)
- ML20080A906 + (ML20080A906)
- ML20080A907 + (ML20080A907)
- ML20080A911 + (ML20080A911)
- ML20080A913 + (ML20080A913)