Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers + (ML20078Q719)
- ML20078Q721 + (ML20078Q721)
- ML20078Q729 + (ML20078Q729)
- NRC-94-4357, Forwards Info to Support Independent Soil Structure Interaction Analysis for AP600 Considered to Be Confidential Per 10CFR9.17(a)(4).Encl Withheld. Proprietary Portion of Document Sent to Westinghouse + (ML20078Q735)
- 05000219/LER-1994-021, :on 941119,inadvertent Introduction of Low Speed Demand Succeeded by High Speed Demand from DCS Led to Total Recirculation Flow Exceeding High Flow Scram Setpoint While Performing Troubleshooting + (ML20078Q744)
- ML20078Q754 + (ML20078Q754)
- ML20078Q772 + (ML20078Q772)
- 05000362/LER-1983-088-03, /03L-0:on 831005,RCS Hot Leg Sample Valve 3HV0508 Showed Intermediate Indication & Could Not Be Closed from Control Room.Caused by Electrical Malfunction.Electrical Leads to Valve Removed & Valve Locked Closed + (ML20078Q773)
- RBG-41094, Provides Rept on Plant Training Simulator Testing Program. Testing Program for 1991-94 Completed on Schedule.No Uncorrected Performance Test Failures.Schedule for 1995-98 Simulator Performance Testing Encl + (ML20078Q776)
- ML20078Q780 + (ML20078Q780)
- ML20078Q785 + (ML20078Q785)
- ML20078Q799 + (ML20078Q799)
- ML20078Q805 + (ML20078Q805)
- ML20078Q811 + (ML20078Q811)
- ML20078Q820 + (ML20078Q820)
- ML20078Q821 + (ML20078Q821)
- ML20078Q823 + (ML20078Q823)
- ML20078Q833 + (ML20078Q833)
- ML20078Q836 + (ML20078Q836)
- ST-HL-AE-1013, Forwards Amend 34 to Fsar,Updating Section 3.7 Re Seismic Design + (ML20078Q839)
- 05000362/LER-1983-085-03, /03L-0:on 831007,low Pressure Turbine 1,intercept Valve 3UV2200L,failed Trip Solenoid a & B Tests During Monthly Surveillance Test S023-3-3.34.Caused by Failed Logic Card in Control Circuit.Logic Card Replaced + (ML20078Q844)
- GO2-83-100, Final Deficiency Rept,Condition 291 Re Containment Atmospheric Control Valves Not Powered from Class IE Source. Initially Reported on 830929.Caused by Failure to Recognize Valves Have Two Safety functions.PED-218-E-C105 Issued + (ML20078Q855)
- 05000362/LER-1983-082-03, /03L-0:on 831005,qualified Safety Parameter Display Sys Train B Taken Out of Svc Due to Smoky Odor Eminating from Cabinet.Caused by Failed Circuit Board. Circuit Board Replaced + (ML20078Q857)
- ML20078Q867 + (ML20078Q867)
- 05000361/LER-1983-130-01, /01T-0:on 831021,train B Emergency Chiller E-335 Tripped Following Power Supply Realignment.Caused by Spurious Trip from Control Circuit.No Further Corrective Actions Required + (ML20078Q870)
- ML20078Q877 + (ML20078Q877)
- ML20078Q879 + (ML20078Q879)
- 2CAN029506, Monthly Operating Rept for Jan 1995 for ANO Unit 2 + (ML20078Q892)
- ML20078Q893 + (ML20078Q893)
- ML20078Q899 + (ML20078Q899)
- ML20078Q904 + (ML20078Q904)
- ML20078Q905 + (ML20078Q905)
- ML20078Q907 + (ML20078Q907)
- ML20078Q913 + (ML20078Q913)
- RBG-16114, Forwards Responses to Questions Raised During 830621 Meeting W/Geosciences Branch Re FSAR Revs Concerning Seismic Indications,Current Well Status & Seismic Profiles & Lineament Analysis.Responses to Be Included in Future Amend + (ML20078Q914)
- ML20078Q915 + (ML20078Q915)
- ML20078Q920 + (ML20078Q920)
- ML20078Q924 + (ML20078Q924)
- PY-CEI-NRR-1886, Forwards Response to follow-up to RAI Re GL 92-08,Thermo-Lag 330-1 Fire Barriers + (ML20078Q933)
- ML20078Q937 + (ML20078Q937)
- RBG-41189, Monthly Operating Rept for Jan 1995 for River Bend Station + (ML20078Q939)
- 1CAN029505, Monthly Operating Rept for Jan 1995 for ANO-1 + (ML20078Q964)
- TXX-4075, Informs That Response to Generic Ltr 83-28 Will Be Provided at Earliest Date Available Prior to 831121.Prior Response to Generic Ltr Mailed 831104 + (ML20078Q965)
- ML20078Q966 + (ML20078Q966)
- ML20078Q967 + (ML20078Q967)
- ML20078Q970 + (ML20078Q970)
- NG-94-4401, Responds to GL 94-03, Intergranular Stress Corrosion Cracking of Core Shroud Bwrs. Insp Plan & Plans of Evaluation Encl + (ML20078Q975)
- ML20078Q983 + (ML20078Q983)
- 05000499/LER-1993-011, :on 930401,pressure Safety Valve (Psv) & MSSV Setpoints Found Outside Required Tolerance Due to Industry Known Problem Re Setpoint Drift.Test Procedure to Test Psv Lift Setpoint on Saturated Steam Modified + (ML20078Q987)
- ML20078Q991 + (ML20078Q991)
- ML20078Q993 + (ML20078Q993)