ML20078Q899
| ML20078Q899 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 12/14/1994 |
| From: | Rehn D DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9412230118 | |
| Download: ML20078Q899 (2) | |
Text
g
'.7 DukeMer Company L D. L Ron Catawba Nuclear Generanon skpartment '
Ma ks&nt 4800 ConcontRoad.
W )83 IONS M "
york,,ycgg45 (803)8313426 Fat DUKEPOWER December 14,1994 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 l
i
Subject:
Catawba Nuclear Station, Units 1 and 2 Docket Nos. 50-413 and 50-414 Deferral of Submittal of Second Ten-Year Interval Inservice Testing (IST)
Program i
Gentlemen:
The purpose of this letter is to document Catawba's intention to extend its IST program second ten-year interval submittal date.
10CFR50.55a establishes the requirements for inservice testing at pressurized water-cooled nuclear facilities. Each facility must comply with the~se requirements in order to test certain ASME Code Class 1,2, and 3 pumps and valves.
Catawba Units I and 2 IST programs will be upgraded in compliance with the 1989 ASME Code and submitted together prior to December 29,1995. This extends the submittal date for the second ten-year interval by one year. This allowable extension is discussed in Article IWA-2430, Paragraph (d) of the 1989 ASME Section XI Code.
If there are any questions, please call L.J. Rudy at (8h') 831-3084.
Very truly yours, 3.4.ALfazMez f~
D.L. Rehn LJR/s 9412230118 941214
,r' O
PDR ADOCK 0500o413 P
PDR M~'
amm y. ww w.
i Document Control Desk Page 2 December 14,1994 bxc:
S.D. Ebneter, Regional Administrator Region 11 R.J. Freudenberger, Senior Resident Inspector R.E. Madin, Senior Project Manager ONRR
-.