Text
..
l am% -
"" O M Log # TXX-95038 4
File # 10010.2 I
I
-Z 3
Ref. # 10CFR50.36 1UELECTRIC February 15, 1995
{
c, % 7, Groep M President.Narleer U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 205$5
SUBJECT:
COMANCHE K g. STEAM ELECTRIC STATION (CPSES) - UNITS 1 AND 2 DOCKET N05. 50 445 AND 50 446 MONTHLY OPERATING REPORT FOR JANUARY 1995 Gentlemen:
Attached is the Monthly Operatint Repo.*t for January 1995, prepared and submitted pursuant to Technical Ep?r$.ication 6.9.1.5 contained in Appendix A to the Comanche Peak Steam Electric Station Units 1 and 2.
Operating License Nos. NPF 87 and NPF 89, respectively.
Sincerely.
C. L. Terry By:
D. R. Woodlan Docket Licensing Manager JHK/jmk Attachment c - Mr. L. J. Callan Region IV Mr. D. D. Chamberlain. Region IV Resident Inspector. CPSES (1) l Mr. T. J. Polich. NRR 9502220157 950131 i
PDR ADOCK 05000445 R
PDR 3
cnergy riara teoi sryan seree Daties. Tex.: 75201 3411
l l
Attachtnent to TXX 95038 I
Page 1 of 8 f
COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 1 3
l NRC MONTHLY OPERATING REPORT DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817-897-5664 l
OPERATING STATUS 1.
REPORTING PERIOD: JANUARY 1995 GROSS HOURS !N REPORTING PERIOD: 744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
- i DESIGN ELECTRICAL RATING (MWe-Net): 1150 3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE j
4.
REASON FOR RESTRICTION (IF ANY):
f THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 31,957 I
6.
REACTOR RESERVE SHUTDOWN HOURS O
O 2,440 f
7.
HOURS GENERATOR ON LINE 744 744 31,489 8.
UNIT RESERVE SHUTDOWN HOURS O
O O
9.
GROSS THERMAL ENERGY GENERATED (MWH) 2,531,633 2,531,633 101,466,739
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 850,444 850,444 33,747,071 l
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 817,252 817,252 32,180,699 f
i
- 12. REACTOR SERVICE FACTOR 100.0 100.0 81.6
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 87.8
- 14. UNIT SERVICE FACTOR 100.0 100.0 80.4
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 80.4
- 16. UNIT CAPACITY FACTOR (USING MDC) 95.5 95.5 71.4 j
l
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWel 95.5 95.5 71.4
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 4.7
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
I Refueling outage scheduled to begin March 2,1995 with an estimated 2
duration of 63 days.
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
l
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED COMMERCIAL OPERATION 900813 ESTIMATED 1
..-.-.m-,
-.----,,,yr n_
Attachment to TXX-95038 Page 2 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817-897-5664 1
MONTH : JANUARY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1103 17 1103 2
1102 18 1102 3
1102 19 1103 4
1101 20 1098 5
1102 21 1012 6
1103 22 1097 7
1102 23 1101 8
1103 24 1101 9
1103 25 1098 10 1103 26 1097 11 1103 27 1094 i
12 1103 28 1103 13 1103 29 1102 14 1100 30 1101 15 1103 31 1102 16 1102
Attachment to TXX 93038 Page 3 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO :
50-445 UNIT:
CPSES 1 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817-897-5664 MONTH : JANUARY 1995 i
DAY TIME REMARK / MODE 01/01 0000 Unit started month an MODE 1.
01/31 2400 Unit ended month in MODE 1.
I
(
t h
1 Attachment to TXX-95038 Page 4 of 8 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-445 UNIT:
CPSES 1 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817-897-5664 REPORT MONTH : JANUARY 1995 METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR I
NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE l
1 i
i e
i
- 1) REASON
- 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM i
i D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
. ~. _ - _. - _.. _ _.. _ -,. _. - - -... _,, - ~, - - - -. _.. _ _ - _ - -, -. - -. _ _ -... - -, _. - ~ - -,, _. _. - -.... - -. _..
. 4
Attach [nent to TXX-95038 i
Page 5 of 8 COMANCHE PEAK STEAM ELECTRIC STATION, UNIT 2 NRC MONTHLY OPERATING REPORT l
DOCKET NO.:
50-446 UNIT:
CPSES 2 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817 897 5664 i
i OPERATING STATUS 1.
REPORTING PERIOD: JANUARY 1995 GROSS HOURS IN REPORTING PERIOD: 744 2.
CURRENTLY AUTHORIZED POWER LEVEL (MWth 3411 MAX. DEPEND. CAPACITY (MWe-Net): 1150
- DESIGN ELECTRICAL RATING (MWe-Net): 1150 f
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
NONE 4.
REASON FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL 744 744 9,862 6.
REACTOR RESERVE SHUTDOWN HOURS 0
0 2,154 h
7.
HOURS GENERATOR ON LINE 744 744 9,685 I
8.
UNIT RESERVE SHUTDOWN HOURS O
O O
t 9.
GROSS THERMAL ENERGY GENERATED (MWH) 2,527,414 2,527,414 29,827,339
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 864,314 864,314 10,020,369
- 11. NET ELECTRICAL ENERGY GENERATED (MWH) 832,504 832,504 9,527,460
- 12. REACTOR SERVICE FACTOR 100.0 100.0 75.2
- 13. REACTOR AVAILABILITY FACTOR 100.0 100.0 91.6 t
- 14. UNIT SERVICE FACTOR 100.0 100.0 73.8
- 15. UNIT AVAILABILITY FACTOR 100.0 100.0 73.8 i
- 16. UNIT CA9ACITY FACTOR (USING MDC) 97.3 97.3 63.1 i
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 97.3 97.3 63.1
- 18. UNIT FORCED OUTAGE RATE 0.0 0.0 11.3
[
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
i
- 20. IF SHUTDOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
l
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
ACHIEVED i
COMMERCIAL OPERATION 930803 ESTIMATED i
)
i i
I l
f
Attachrnent to TXX-95038 Page 6 of 8 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
50-446 UNIT:
CPSES 2 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817-897-5664 MONTH : JANUARY 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1122 17 1122 2
1121 18 1121 3
1121 19 1120 4
1120 20 1120 5
1120 21 1122 6
1114 22 1122 7
1048 23 1121 8
1120 24 1121 9
1120 25 1122 10 1121 26 1123 11 1122 27 1123 12 1122 28 1123 13 1122 29 1123 14 1122 30 1122 15 1122 31 1123 16 1122 4
l
4 Attach' ment to TXX-95038
'Page 7 of 8
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.:
50-446 UNIT:
CPSES 2 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois TELEPHONE:
817-897-5664 MONTH : JANUARY 1995 DAY TIME REMARK / MODE 01/01 0000 Unit started month in MODE 1.
01/31 2400 Unit ended month in MODE 1.
\\
)
1
Attzchment to TXX-95038 Page 8 of 8
{
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.:
50-446 UNIT:
CPSES 2 DATE:
02/13/1995 COMPLETED BY:
Ed Sirois t
TELEPHONE:
817-897-5664 REPORT MONTH : JANUARY 1995 METHOD OF TYPE SHUTTING DOWN F; FORCED DURATION THE REACTOR OR NO DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS NONE i
I t
1
- 1) REASON
- 2) METHOD A: EQUIPMENT FAILURE (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION 1: MANUAL B: MAINT OR TEST F: ADMINISTRATIVE 2: MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (EXPLAIN) 3: AUTOMATIC SCRAM t
D: REGULATORY RESTRICTION H: OTHER (EXPLAIN) 4: OTHER (EXPLAIN)
~.
.-