Monthly Operating Rept for Jan 1995 for Monticello Nuclear Generating Station
ML20078Q823
Person / Time
Site: Monticello 
Issue date: 01/31/1995
From: Richard Anderson, Paustian H
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9502220092
Download: ML20078Q823 (5)


Text

'

e Northem States Power Company Monticello Nuclear Generating Plant 2807 West Hwy 75 Monticello, Minnesota 55362-9637 February 13,1995 Monticello Technical Specification 6.7.A.3 US Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of Monticello Monthiv Operatina Report for January.1995 In accordance with Monticello Technical Specification 6.7.A.3, the report of operating statistics for the Monticello Nuclear Generating Plant for the Month of January is provided as Attachment A.

Please contact Mary Engen, Sr Licensing Engineer, at (612) 295-1291 if you require further information.

hr RoA W

g Roger O Anderson Director Licensing and Management issues c:

Regional Administrator-Ill, NP.C NRR Project Manager, NRC Sr Resident inspector, NRC State of Minnesota Attn: Kris Sanda J Silberg Attachments: A - December Operating Data 5:3GGb.

/f g222OO92950132

\\

R ADOCK 05000263 PDR

OPERATING DATA REPORT r

DOCKET NO.

50-263 DATE 2-1-95 l

COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 e

OPERATING STATUS

] Notes j

Monticello

)

]

1. Unit Name 2.

Reporting period:

January

)

)

3. Licensed Thermal Power (MWt).

1670

)

)

4. Nameplate Rating (Gross MWe):

569

)

]

5. Design Electrical Rating (Net MWe):

545.4

)

]

6. Maximum Dependable Capacity (Gross MWe): --564

)

)

7. Maximum Dependable Capacity (Net MWe) 536

)

)

8.

If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A i

THIS MONTH YR.-TO-DATE CUMULATIVE 1

11. Hours In Reporting Period 744 744 206785 l
12. Number Of Hours Reactor Was Critical 744.0 744.0 167743.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generator On-Line 744.0 744.0 164854.9
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated ()MWH) 1238011 1238011 254724463
17. Gross Electrical Energy Generated (MWH) 424242 424242 86107720
18. Net Electrical Energy Generated (MNH) 409499 409499 82384609
19. Unit Service Factor 100.0%

100.0%

79.7%

20. Unit Availability Factor 100.0%

100.0%

7 9. '/ %

21. Unit Capacity Factor (Using MDC Net) 102.7%

102.7%

74.3%

22. Unit Capacity Factor (Using DER Net) 100.9%

100.9%

73.0%

23. Unit Forced Outage Rate 0.0%

0.0%

3.6%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each) i

_None

)

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved

}

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

.J

i AVERAGE DAILY UNIT POWER LEVEL l

DOCKET NO.

50-263 UNIT Monticello DATE 2-1-95

~~

COMPLETED BY H. H.

Paustian TELEPHONE 612/295-5151 MONTH OF January l

DAY.

AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 554.

17 553.

2 554.

18 551.

3

553, 19 552.

4 554.

20 552.

5 553.

21 554.

6 553.

22 549.

7 552.

23 553.

8 554.

24 553.

i 9

554.

25 550.

10 552.

26 550.

11 553.

27 551.

12 552.

28 553.

13

554, 29
550, 14 553.

30 534.

15 535.

31 524.

i 16 553.

t INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each i

day in the reporting month.

Compute to the nearest whole megawatt.

t T

4--

~,.

l WARRATIVE SUMt'ARY OF OPERATING EXPERIENCE l

+

l

)

DOCKET NO.

50-263 DATE 2-1-95 COMPLETED BY H. H.

Paustian i

TELEPHONE 612/295-5151 l

MONTH JAN 1-01-95 i

to Power operation.

]

1-30-95 1-30-95 Power reduction to 65% to backwash Condensate Demineralizer.

I to i

i 1-31-95 1-31-95 Power operation.

j i

i I

i Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

l u

r i

t i

i a

UNIT SHUrD0VNS AND POVER REDUCTIONS DOCKET NO.

50-263 UNIT NAME Monticello DATE 12-01-95 COMPLETED BY H. H. Paustian REPORT MONni _ January ___

TELEPHONE 312/295-5151 -

No.

Date Ty(pe (hours)

(2) of No.

Code Code Action to Duration Reason Method LER System Comp.

Cause & Corrective J)

Shutdown (4)

(5)

Prevent Recurrence (3) 1 01-30-95 F

0.0 H

4 N/A SF FDM Power reduction to 65% re Condensate Demineralizer. quired to backvash 1

2 3

4 F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)