ML20078Q811

From kanterella
Jump to navigation Jump to search
Amend 78 to License DPR-20 Amending Security,Safeguards & Guard Training & Qualification Plans
ML20078Q811
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/07/1983
From: Crutchfield D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20078Q815 List:
References
NUDOCS 8311140147
Download: ML20078Q811 (2)


Text

.

f UNITED STATES

' I % "v. (//

,n NUCLEAR REGULATORY COMMISSION

. 7, k

.# 3,

WASHINGTON,0. C. 20555 Ss, *v,~a i

CONSUMERS POWER COMPANY DOCKET NO. 50-255 PALISADES PLANT AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No. 78 License No. DPR-20 1.

The Nuclear Regulatory Commission (the Comission) has found that:

A.

The filing by Consumers Power Company (the licensee) dated

. June 20, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the filing, the provisions of the Act, and the rules and regulations.of the Comission; C.

There is rea:onable assurance (i) that the activities autho-rized by this amendment can be conducted without endangering the health and safety of the public; and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and l

E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, Provisional Operating License No. DPR-20 is hereby amended i

by combining the existing Paragraphs 3.F (Physical Security Plan *), 3.G (Safeguards Contingency Plan **) and 3.I (Guard Training and Qualification Plan ***) into Paragraph 3.F to read as follows:

l l

l

  • 0riginally approved by License Amendment No. 47, April 10,1979
    • 0riginally approved by License Amendment No. 61, October 1, 1980 l
      • 0riginally approved by License Amendment No. 65, February 25, 1981 1

83111401478h55 DR ADOCK 03

(

p j

PM

s -J F.

The licensee shall fully implement and maintain in effect all provisions of the Commission-apprcved Physical Security, Safeguards Contingency, and Guard Training and Qualification Plans, inclLding amendments made pursuant to the provisions of 10 CFR 50.54(p).

The approved plans, which contain Safe-guards Information described in 10 CFR 73.21, are collectively entitled, " Palisades Nuclear Power Plant Security Plan", dated February 20, 1979 with Revision 1 dated March 27,1979(trans-mitted March 30,1979), Revision 2 dated June 13, 1980 (trans-mitted June 8, 1980), Revision 3 dated November 10,1980(trans-mitted December 10,1980), Revision 4 dated March 18, 1981 transmitted March 27,1981), Revision 5 dated October 1, 1981 transmitted November 6, 1981), Revision 6 dated October 1, 1982 transmitted November 5,1982; " Palisades Nuclear Plant Safe-guards Contingency Plan", dated July 11, 1980 (transmitted July 24, 1980); and " Palisades Nuclear Plant Suitability, Train-ing and Qualification Plan", dated June 26,1980(transmitted July 17, 1980), Revision 1 dated October 1, 1982 (transmitted November 5,1982) and supplemental Revision 1 page changes dated October 1, 1982 (transmitted June 20,1983).

3.

In addition, Paragraph 3.H of Provisional Operating License No. DPR-20 is hereby deleted.

4.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION 5

7 I

Dennis M. Crute fie Chief Operating Reactors ranch #5 l

Division of Licensing Date of Issuance:

November 7, 1983 1

l l

1 y-g---

~

9

,w---

,--w-g w-*

w

- w w

e y

w-,-,

w