Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078Q534 + (ML20078Q534)
- ML20078Q539 + (ML20078Q539)
- ML20078Q552 + (ML20078Q552)
- ML20078Q554 + (ML20078Q554)
- ML20078Q556 + (ML20078Q556)
- ML20078Q558 + (ML20078Q558)
- 3F1294-01, Forwards Rev 21 to Final Safety Analysis Rept for Crystal River Unit 3 + (ML20078Q559)
- ML20078Q565 + (ML20078Q565)
- ML20078Q567 + (ML20078Q567)
- NRC-95-4406, Forwards Proprietary Responses to NRR Questions on Wcobra/ Trac Computer Code in Support of 950215-16 Meeting W/Acrs Thermal Hydraulic Phenomena Subcommittee.Encl Withheld (Ref 10CFR2.790) + (ML20078Q574)
- ML20078Q576 + (ML20078Q576)
- NG-94-4529, Monthly Operating Rept for Nov 1994 for Duane Arnold Energy Ctr + (ML20078Q578)
- ML20078Q582 + (ML20078Q582)
- ML20078Q584 + (ML20078Q584)
- ML20078Q588 + (ML20078Q588)
- ML20078Q594 + (ML20078Q594)
- ML20078Q600 + (ML20078Q600)
- ML20078Q601 + (ML20078Q601)
- ML20078Q603 + (ML20078Q603)
- NRC-95-4400, Forwards Description of Forcing Functions Generated from Postulation of Mainsteam Line Break & MSIV Closure Transient & Ps+Caepipe Time History Structural Analysis Results.Encls Withheld.Proprietary Portion of Doc Sent to Westinghouse + (ML20078Q605)
- ML20078Q606 + (ML20078Q606)
- ML20078Q609 + (ML20078Q609)
- ML20078Q611 + (ML20078Q611)
- ML20078Q619 + (ML20078Q619)
- ML20078Q627 + (ML20078Q627)
- ML20078Q636 + (ML20078Q636)
- HL-4753, Responds to NRC Re Violations Noted in Insp Repts 50-321/94-26 & 50-366/94-26.Corrective Actions:Ltr Issued to All Plant Personnel Reiterating Procedural Requirements Re Proper Wearing of Dosimetry & Meeting Will Be Conducted + (ML20078Q643)
- ML20078Q648 + (ML20078Q648)
- LIC-94-0253, Forwards Rev 1 to EPIP FC-EPF-21, Fort Calhoun Station Sector Map & Revised Index.Procedure Revised to Add Locations for Power Outlets,Security Stations,Fire Protection Equipment & Hazardous Matl Storage + (ML20078Q670)
- NG-94-4452, Responds to RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, by Providing Util Plans for Resolution in Encl + (ML20078Q683)
- ML20078Q706 + (ML20078Q706)
- NG-94-4399, Responds to GL 94-04 Dtd 940902,which Requested That All Addressees Provide Voluntary Rept Containing Certain Occupational Radiation Exposure Data + (ML20078Q715)
- LD-94-069, Forwards marked-up CESSAR-DC Figure 5.1.2-2 Re Proposed Design Change to Remove RCP Seal Coolers + (ML20078Q719)
- ML20078Q721 + (ML20078Q721)
- ML20078Q729 + (ML20078Q729)
- NRC-94-4357, Forwards Info to Support Independent Soil Structure Interaction Analysis for AP600 Considered to Be Confidential Per 10CFR9.17(a)(4).Encl Withheld. Proprietary Portion of Document Sent to Westinghouse + (ML20078Q735)
- 05000219/LER-1994-021, :on 941119,inadvertent Introduction of Low Speed Demand Succeeded by High Speed Demand from DCS Led to Total Recirculation Flow Exceeding High Flow Scram Setpoint While Performing Troubleshooting + (ML20078Q744)
- ML20078Q754 + (ML20078Q754)
- ML20078Q772 + (ML20078Q772)
- 05000362/LER-1983-088-03, /03L-0:on 831005,RCS Hot Leg Sample Valve 3HV0508 Showed Intermediate Indication & Could Not Be Closed from Control Room.Caused by Electrical Malfunction.Electrical Leads to Valve Removed & Valve Locked Closed + (ML20078Q773)
- RBG-41094, Provides Rept on Plant Training Simulator Testing Program. Testing Program for 1991-94 Completed on Schedule.No Uncorrected Performance Test Failures.Schedule for 1995-98 Simulator Performance Testing Encl + (ML20078Q776)
- ML20078Q780 + (ML20078Q780)
- ML20078Q785 + (ML20078Q785)
- ML20078Q799 + (ML20078Q799)
- ML20078Q805 + (ML20078Q805)
- ML20078Q811 + (ML20078Q811)
- ML20078Q820 + (ML20078Q820)
- ML20078Q821 + (ML20078Q821)
- ML20078Q823 + (ML20078Q823)
- ML20078Q833 + (ML20078Q833)
- ML20078Q836 + (ML20078Q836)