ML20078Q603
| ML20078Q603 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 11/30/1994 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20078Q597 | List: |
| References | |
| NUDOCS 9412220266 | |
| Download: ML20078Q603 (10) | |
Text
.
OPERATING DATA REPORT DOCKET NO 50-4))
DATE Decest'er [h_1H)4_
OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Nase: Catawba 1
- 2. Reporting Period: November 1, 1994-Novesber 30,1994
- 3. Licensed Thersal Power (MWt):
3411
- 4. Naseplate Rating (Gross MWe):
1305a Notes skaseplate Rating
- 5. Design Electrical Rating (Net MWe b 1145 (Gross N 1. c hted as
- 6. Maxisus Dependable Capacity (6 toss MWel:
1192 IV,.0% V/A.,
o er
- 7. Maxieus frependable Capacity (Net MWe):
1129 fe,..
per h p i 1
- 9. If Changes Occur in Capacity Ratings (!tess Husber 3 Through 7) Since Last NUREG-0'_.
Repert Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reason for Restricticos, If any:
This Month Yr.-to Date Cumulative
!! Hours In Reporting Feriod 720.0 0016.0 82609.0
- 12. Nusber Of Hours Reactor Was Critical 720.0 79 9.6 63767.6
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
- 14. Hours Generator On-Line 720.0 7978.1 62631.5
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. 6 toss Thersal Energy Generated (MWH) 2423554 26403261 203645797
- 17. Gross Electrical Energy Generated (MWH) 869929 9416870 71783005
- 10. Net Electrical Energy Generated (MWHI B25466 8923436 67468065
- 19. Unit Service factor 100.0 99.5 75.0
- 20. Unit Availability Factor 100.0 99.5 75.0
- 21. Unit Capacity Fatter (Using NDC Net) 101.6 98.6 72.1
- 22. Unit Capacity Factor (Using DER Neti 100.1 97.2 71.3 E3. Unit Forced Outage Rate 0.0 0.5 9.2
- 24. Shutdoun Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh Refueling - February 11, 1995 - 53 days
- 25. If Shut Down At End Of Report Period. Estisated Date of Startup 5
- 26. Units in Test Status (Prior to Cossercial Operatien):
Forecast Achieved INITIAL CRiflfAlliV INITIAL ELECTRICITV CGMMERCIAL OFERAi!Dh 9412220266 941215,
DR ADOCK05004p l
4 -
t v
OPERAi!NSDATAFEPORT DDCKET ND 50-413 llNii Catawba i DATE pgenber 15,1994 C0MPLETED BY R.A.Wjjllael TELEPHONE 704-392-5346 t
i MONTH N0Vf0Def. 1994 Qal AVERAGE DAILY POWER LEVEL
[A1 AVERAGE DAILY POWER LEVEL (MWe-Net)
(NWe-Net)
I 1126 17
!!40 2
1137 18
!!45 3
1142 19 1150 4
!!A3 20
!!53 5
1121 21 1146 6
1139 22 1151 7
1145 23 1156 B
1147 24
!!57
]
9 1140 25 1156 10 1139 26 1154 1139 27 1154 12 1150 20 1152 i
13 1150 P9 1155 14 1148 30
!!56 15 1147 l
16 1146 i
4 l
-_--.___.-...__..,_x.
,__---m-
i
]
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.-
50-413 UNIT NAME urawan 1 DATE 14/13/y,___
REPORT MONTH November 1994 COMPLETED BY x.
a.
w1111ame TELEPHONE tiusJ-Jue-sJee (1)
{2)
(4)
(5) 3 E
HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S
- (1)
(2)
(3)
(4)
F Forced Reason:
Method:
Exhibit G - Instructions -
A-Equipment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of Data 2-Manual Scram EntU Sneets For Licensee.
C-Refueling 3-Automatic Scram
-Event Re rt (LER)
D-Regulatory Restrictiory 4-Other (Explain)
File (
-0161)
E-Operator Trqlining & License Examination F-Aministrative (5)
G-Operator Error (Explain)
Exhibit I - Same Source H-Other (Explain) l
DOCKET: 50-413 UNIT:
Catawba 1 Date 12/15/94 NARRATIVE
SUMMARY
MONTH: November 1994 Catawba Unit 1 began the month of November operating at 100% full power. The unit operated at or near 100% full power for the entire month.
Prepared by: R. A. Williams Telephone: (704)-382-5346
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: Catawba.
Unit 1 2.
Scheduled next refueling shutdown: February 1995 3.
Scheduled restart following refueling: ADril 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 111 (b) in the spent fuel pool: 111 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: Seotember 2009 DUKE POWER COMPANY DATE:
December 15, 1994 Name of
Contact:
R.
A.
Williams Phone:
l,-
l OPERATING DATA REFORT l
l DOCKET N3 50-414 l
DATE December 15. 1994 GPERAT[M6 STATUS COMPLETED BY R.A. Williaes i
TELEPHONE 704-382-5346
- 1. Unit Name: Catawba 2
- 2. Reporting Period November 1, 1994-November 30,1994
- 3. Licensed Thersal Power (MWt):
3411
- 4. Nameplate Rating (6ross MWe):
1305e Notes eNaeeplate Rating
- 5. Design Electrical Rating (Net MWe):
1145 (Gross NWel calcolated as i
- 6. Maxinus Dependable Capacity (Gross MWe):
1192 1450.000 MVA :.90 power
- 7. Marisue Dependable Capacity (Net MWe):
!!29 factor per Page lit,
- 8. If Changes Occur in Capacity Ratings (Itres Nueber 3 Through 7) Since last NUREG-0020.
Report. Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net NWel
- 10. Reason For Restrictions, if anyt l
This Month Yr.-to-Date Cumulative
!!. Hours in Reporting Perled 720.0 8016.0 72625.0
- 12. Number Of Hours Reactor Was Critical 720.0 6324.4 56265.3
- 13. Reatter Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Generator On-Line 720.0 6237.9 55317.4 l
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
16, 6 toss thersal Energy Benerated (MWH) 2437596 20282416 177171455
- 17. Gross Electrical Energy Benerated (MWH) 6704B1 7220369 62797628 l
- 18. Net Electrical Energy Benerated (MWH)
B27167 6818512 59108569 l
- 19. Unit Service Factor 100.0 77.8 76.2 l
- 20. Unit Availability Factor 100.0 77.6 76.2
- 21. Unit Capacity Fa: tor (Using MDC Net) 101.8 75.3 71.9
- 22. Unit Capacity Factor (Using DER Net) 100.3 74.3 71.1
- 23. Unit forced Outage Rate 0.0 3.1 9.0
- 24. Shutdown Scheduled Over Nert 6 Months (Type, Date, and Duration of Eachl:
None
- 25. If Shut Down At End of Report Feriod. Estiaated Date of Startup:
- 26. Units In Test Status (Prior to Cessercial Operatien):
Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL GPEFATION
\\
OPERATING DATA REPORT DOCKET NO 50-414 UNIT Cataube e i
DATE December 15. 1994 COMPLETED BY R.A. Williens TELEPHONE 704,282-5346 i
RONTH November,1994
.i i
RQ-AVERAGE dally POWER LEVEL p_Q AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1
!!49 17 1152 2
1156 18 1130 3
1154 19 1151 4
!!$3 20 1154 i
5
!!47
- 21 1146 f
6 1146 22 1152 l
7
!!42 23
!!56 i
B 1122 24
!!57 9
1122 25 1155 10 1121 26 1155 t
1158 27
!!55
[
12 1150 28 1151 13 1158 29
!!54 it
!!56 30 1154 15 1152 16 1152 i
)
P k
+
I:
,_~
t
,~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME uunwon 4 i
DATE tei13fy,__.
REPORT MONTH November 1994 COMPLETED BY m.
a.
wit a xe-TELEPHONE tivej-J5d-3 Jet l
(1)
{2) f3 _
(4)
(5)
E HOD T
A OF LICENSE N
Y-S SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDONNS OR REDUCTION S I
t' 4
l i
Forced eason:
ethod:
ibit G - Instructions l
S Scheduled A-Eqvipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual' Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Re rt D-Regulatory Restriction 4-Other (Explain)
File (
-0161) ) -
(LER E-Oparator Trgining & License Examination F-Aaministrative (5)
G-Operator Err 9r (Explain)
Exhibit I - Same Source-4 H-Other (Explain) 1
~.
DOCKET: 50-414' UNIT: Catawba 2 Date:
12/15/94 NARRATIVE
SUMMARY
MONTH: November 1994 Catawba Unit 2 began the month of November operating at 100% full power. The unit operated at or near 100% full power for the entire month.
l l
1 l
Prepared by: R. A. Williams Telephone: (704)-382-5346 i
1 MONTHLY REFUELING INFORMATION REOUEST i
1.
Facility name: Catawba.
Unit 2 i
2.
Scheduled next refueling shutdown: September 1995 l
3.
Scheduled restart following refueling: November 1995 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S.
CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4
THROUGH 6 WILL NO LONGER DE MAINTAINED IN THIS REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other licence amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 111 (b) in the spent fuel pool: All 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase:
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 1
DUKE POWER COMPANY DATE:
December 15, 1994 i
Name of
Contact:
R.
A. Williams Phone:
(704)-382-5346