Rev 6 to OPGP03-ZX-0002, Condition Reporting Process
ML20078Q565
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/17/1994
From: Covell M
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML18065B259 List:
References
NUDOCS 9502210317
Download: ML20078Q565 (35)


Text

.

s' SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION D0527 _

L- h C~ - Rev.6 OPGP03-ZX-0002 General Pagei e

_ p

~ Condition Reporting Process' Quality Non Safety-Related Usage: iGlerenced' / Effective Date: 10/17/94 M. A. CovcH N/A f/A Nuclear Assurance PREPARER TECHNICAL sER COGNIZANT DEPT

/

Table of Contents -

Eage

1.0 Purpose and Scope

3 2.0 Definitions 3 3.0 Responsibilities 5 4.0 Procedure 6 4.1 Condition Identification 6 4.2 Condition Validation and Operability /Reportability Scieening 7 4.3 Operability and Reportability Determination 8 4.4 CAQ Significance Determination and Establishment of Ownership 10 4.5 CAQ-Department Level (CAQ-D)/ Condition Not Adverse to Quality (CNAQ)

Resolution 10 4.6 CAQ-Station Level (CAQ-S) Resolution 11 4.7 Significant CAQ Resolution 11 4.8 Corrective Action Implementation and Effectiveness Review (CAQ-S and SCAQ) 12 5.0 Condition Tracking and Trending 13 6.0 Interfacing Processes 14 7.0 References 15

/

9502210317 950216 PDR ADOCK 05000498  ? c,/.

P PDR 7

~

OPGP03-ZX-0002 Rev. 6 Page 2 of 30 l * *" " Condition Reporting Process l

Eagt Table of Contents (continued) 16 3.0 Support Documents 17 Addendum 1 - Process Flow Chart Addendum 2 - Condition Level Guidelines and Examples 18 22 Addendum 3 - Operability Determination Guidelines 25 Addendum 4 - Reportability Determination Guidelines Addendum 5 - Guidelines for SCAQ Investigation and Reporting 26 OPGP03-ZX-0002 Condition Report Form - Typical 29

OPGP03-ZX-0002 Rev.6 Page 3 of 30 Condition Reporting Process

1.0 Purpose and Scope

1.1 This procedure defines the process for identification, classification, trending, reporting, and timely correction of Conditions (hardware / programmatic) that could impact the safe and reliable operation of the plants. Conditions that involve Safeguards Information are excluded from this process.

1.2 Eds procedure defin6s a process to ensure that Conditions Adverse to Quality are identified, cause is determined, and corrected to prevent recurrence.

1.3 This procedure provides a method to ensure that all Conditions are identified and corrected at the lowest level of responsibility.

2.0 Definitir,ns 2.1 Actions 2.1.1 Compensatory Action - Action taken to temporarily address a deficient condition until permanent corrective actions can be implemented.

2.1.2 _Go_pscfive Action - Action taken to prevent recurrence of a condition or event or to eliminate or minimize the identified causal factors of the condition.

2.1.3 Remedial Action - Action taken after a condition is identified that restores it to an acceptable condition or capability, but may not be the only actions needed to prevent recurrence of the condition.

2.2 Adverse Trend - Continuance of an identified trend beyond established thresholds of acceptance. Adverse trends are Significant Conditions Adverse to Quality.

2.3 Cause 2.3.1 Annarent Cause - The readily understood, evident, or obvious cause of a Condition.

2.3.2 Root Cause - Identified fundamental cause(s), that, if corrected, will prevent

  • recurrence of a Condition.

2.4 Condition - The existence, occurrence, or observation of a situation that requires further review and/or evaluation for resolution.

2.4.1 Non-valid Condition - Determination made by a supervisor or the Condition Review Group regarding an observation or situation that is not based on logic, facts, or evidence.

~

l * * "'

~

OPGP03-ZX-0002 Rev.6 Page 4 of 30 l

l Conditiora Reporting Process l

2.4.2 Valid Condition - Determination made by a supervisor or the Condition Review Group regarding an observation or situation based on logic, facts, or evidence.

2.4.3 Condition Not Adverse to Ouality (CNAQ) - A valid Condition which requires attention but does not meet the definition of a Condition Adverse to Quality.

See Addendum 2 for examples.

2.4.4 Condition Adverse to Ouality (CAO) - Any failure, defect, deviation, malfunction, or deficiencf of plant equipment / materials, procedures or personnel which has or would have an effect on the safe and/or reliable operation of the Station and/or its personnel.

2.4.4.1 Condition Adverse to Ouality-Station Level (CAO-S)- Conditions meeting the guidelines for Station level of significance as described in Addendum 2, 2.4.4.2 Condition Adverse to Ouality-Department Level (CAO-D)-

Conditions meeting the guidelines for Department level of significance as described in Addendum 2.

2.4.5 Sienificant Condition Adverse to Ouality (SCAO) - Conditions that:

2.4.5.1 Are determined to be reportable (routine reports to the NRC or other agencies are excluded). Conditions that have a direct adverse effect on the safety and reliability of the Station per the Operating License and Technical Specifications are included. See Addendum 2 for examples.

2 A S.2 Involve administrative, procedural or operational errors that demonstrate misunderstanding of or noncompliance with operational, regulatory, or nuclear safety requirements. See Addendum 2 for examples.

2.4.5.3 Have been determined to be an Adverse Trend.

2.5 Condition Renon (CR)- A form used to identify Conditions.

2.6 Condition Review Group (CRG) - A management body, consisting of the Plant Managers and Managers or designees from the Licensing, Nuclear Assurance, Plant Operations, Maintenance, Technical Services, Design Engineering, and System Engineering Departments. The Group establishes procedures for and provides oversight of the Station Corrective Action Program.

2.7 Corrective Action Procram (CAP)- A program that establishes the parameters for identification, reporting, correcting and trerding of Conditions.

l

OPGP03-ZX-0002 Rev.6 Condition Reporting Process Page 5 of 30 l

l 2.8 Denartment CAP Process - A process maintained by a department for handling the identification and disposition of Conditions.

2.9 Generic Imolications - Commonalities between causal factors or conditions e.g., Common mode failures.

2.10 Investinator's Manual - A document that includes details on performing causal factor analyses, developing corrective actions, and formatting investigation reports.

2.11 Operability Review - The activity performed by the Shift Supervisor or designee to '

determine whether an identified Condition adversely affects the capability of a component required by Technical Specifications to perform its specified safety function.

2.12 Oricinator - Any person who identifies a condition.

2.13 Owner - The organization and individual responsible / accountable for resolution of Conditions including implementation and effectiveness monitoring of corrective actions.

2.14 Promntly - The need for action based on the safety significance. Typically, as soon as practical and within a given work shift.

2.15 Reportability Review - The process used to determine if a condition is reportable to an outside agency, usually documented by memorandum.

2.16 SCAO Investicator - Any person attaining Certification 0169 or equivalent as approved by the CAP Administrator or designee.

3.0 Responsibilities 3.1 ANY PERSON, the Originator, who identifies a Condition is responsible for resolving that Condition or promptly reporting the Condition to a supervisor. If a supervisor is not l

available and operability or reportability concerns exist, promptly report the Condition to a Control Room Shift Supervisor. The Originator may keep apprised of the Condition through to final resolution by communication with the Condition Owner or review of the CAP Database.

O 3.2 Supervisors are responsible for reviewing, validating, and screening identified Conditions and taking action to correct those Conditions.

3.3 Shift Supervisors or designees are responsible for performing Operability /Reportability i

determinations, evaluating the Condition as a Mode Restraint, if applicable; and ensuring  !

adequate compensatory / remedial actions are initiated to correct Conditions which affect  ;

operability.

l l

l

OPGP03-ZX-0002 Rev.6 Page 6 er so l

Condition Reporting Process l

3.4 Condition Review Groun is responsible for condition significance determination, establishment of an Owner, approving extensions for Station Level CAQ and SCAQ evaluations / investigations and corrective actions, reviewing investigations conducted by an Event Review Team, reviewing Nuclear Assurance audits and surveillances of the Corrective Action Program, approving investigations of adverse trends, and review of Owner assessments of corrective actions.

3.5 Owners are responsible for the resolution of Conditions including implementation, effectiveness monitoring of all corrective actions, and retention of objective evidence of completed actions.

3.6 The CAP Administrated is responsible for administration of the Station Corrective Action Program and the estabEshment and maintenance of an event and cause trending database.

4.0 Procedure NOTE This Corrective Action process emphasizes correcting Conditions at the lowest level of responsibility.

4.1 Condition Identification 4.1.1 Upon identification of a Condition, the Originator substantiates that the Condition requires further attention. This is determined by his/her judgement, consultation with others who may have more knowledge of the Condition and its potential effect, and/or examples provided in Addentm 2.

4.1.2 If the Condition is determined to require no further attention, no action is required.

4.1.3 For Conditions needing attention, but determined not to require documentation, the Originator takes the appropriate action to correct the Condition.

4.1.4 For Conditions needing attention and requiring documentation, the Originator completes the information requested in the " Originator" section of a Condition Report (CR) form and presents the completed form to a supervisor or manager.

See Addendum 6 for sample CR form.

4.1.5 For Conditions where security concerns are obvious or perceived, contact the Security Force Supervisor immediately and deliver the CR form to Security.

OPGP03-ZX-0002 Rev.6 Page 7 of 30 Condition Reporting Process 4.2 Condition Validation and Operability /Reportability Screening 4.2.1 The Supervisor promktly validates the Condition based on discussion with the Originator, his/her professional judgement, consultation with others who may have more knowledge of the Condition and its potential effect, and/or examples provided in Addendum 2. If applicable, check the appropriate sub-block (e.g.,

QA Finding, Regulatory Issue, Work Order, etc.) in the Supervisor block of the CR form.

4.2.2 The Supervisor, for CRs which he/she has determined to document a Non-Valid Condition, discusses his/her justification for the non-valid determination with the Originator.

4.2.2.1 If the Originator agrees with the Supervisor's Non-Valid Condition justification, no further action is required.

4.2.2.2 If the Originator disagrees with the Supervisor's Non-Valid Condition justification, then a written basis for the determination shall be attached to the CR form. The Supervisor shall have the CR form delivered to the Control Room. In addition, the Originator has the option to raise the issue with the next level of management or use any other concerns identification process.

4.2.3 The Supervisor promptly screens Validt Conditions for Operability and Reportability considerations based on'his/her professionaljudgement, consultation with others who may have more knowledge of the Condhion and its potential effect, and/or guidance provided in Addendum 3 and A6dendum 4. Identified Operability or Reportability requirements shall be recorded in the appropriate blocks of the " Supervisor" section of the CR form.

4.2.4 The Supervisor determines the Condition level using the examples in Addendum

, 2. Condition level is recorded in the " Supervisor" section of the CR form.

4.2.5 The Supervisor determines the preliminary Condition Event Code (s) using the STP Trend Codes Book for the Condition and records this code in the

" Supervisor" section of the CR form.

4.2.6 The Supervisor obtains a CR number and records it on the CR form. (CAP Database entries will be required to obtain a CR number.)

4.2.7 Process CRs categorized as a Condition Not Adverse to Quality (CNAQ) or CAQ-Department Level (CAQ-D) in accordance with Section 4.5.

. .. l l

OPGP03-ZX-0002 Rev. 6 Page 8 of 30 Condition Reporting Process 4.2.8 For CAQ-Station Level (CAQ-S) CRs that have no Operability or Reportability requirements, the Supervisor detertnines the appropriate Department Owner and, upon acceptance by the Owner, forwards the CR to the Owner for processing in accordance with Section 4.6. The Owner's Department and individual accepting ownership for the Department are recorded in the appropriate blocks of the

" Supervisor" section of the CR form.

4.2.9 The Supervisoi ensures that CAQ-S CRs that may have Operability or Reportability requirements and SCAQ CRs are promptly hand delivered to the appropriate Control Room Shift Supervisor for processing. Telephone notification to the appropriate Control Room Shift Supervisor is required when there may be delays encountered in delivery of the CR form to the Control Room.

4.3 Operability and Reportability Determination NOTE The Shift Supervisor may obtain assistance from other organizations to make Operability and Reportability determinations. The responsibility for these determinations shall remain with the Shift Supervisor.

4.3.1 For all Conditions delivered to the Control Room, the Shift Supervisor shall determine Operability and Reportability. (See Addenda 3 and 4.) Identified Operability or Reportability requirements shall be recorded in the appropriate blocks of the " Shift Supervisor" section of the CR form. The reporting criteria and date of the notification shall be annotated on the form.

4.3.1.1 The time between validity determination of the nonconformance and the initial Operability screening shall be commensurate with the safety significance of the nonconformance, but should normally not exceed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. Initial Operability screening for conditions with allowed outage time less than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, and which have a shutdown action statement, should normally be completed within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The allowed outage time for a condition found to be inoperable begins at the time that the Shift Supervisor determines the condition to be inoperable.

4.3.1.2 Reportability determinations shall normally be completed within 4 working days ofidentifying the Condition. The Shift Supervisor is responsible for making immediate notifications. Responsibility for other reports shall be established by the CRG.

OPGP03-ZX-0002 Rev.6 Page 9 of 30 Condition Reporting Process l

4.3.1.3 'Ihe results of Operability or Reportability reviews performed in support of the Shift Supervisor may be presented verbally to the Shift Supervisor or by a writteri memorandum. Written memoranda shall contain the following information and be hand delivered or sent electronically to the Shift Supervisor.

43.1.3.1 Description - A brief description of the Condition for which the review is being performed.

4.3.1.3.2 Criteria - The review should indicate the criteria considered in making the review.

4.3.1.3.3 Determination - The review should clearly state the recommendation and include a brief basis for the decision.

4.3.1.3.4 Other notes - Include the name of the person making the review. Include any other information relevant to the review.

+ Written Operability or Reportability reviews shall be attached to the original CR fonn.

4.3.2 The Shift Supervisor shall determine if the Condition described in the CR is a Mode Restraint, if applicable. Identified Mode Restraints shall be recorded in the appropriate blocks of the " Shift Supervisor" section of the CR form.

4.3.3 CRs for which Shift Supervisor requirements have been completed, shall be picked up from the Control Rooms by the CAP Administrative Group and fonvarded to the CRG.

4.3.3.1 For CRs awaiting Operability or Reportability determination, copies shall be made for evaluation by the CRG. The original CR shall remain in the Control Room until all Shift Supervisor activities are completed.

4.3.3.2 For CRs that were initially determined by the Supervisor to be Non-Valid Conditions, but with which the Originator has disagreed and forwarded directly to the appropriate Control Room Shift Supervisor, the CAP Administrative Group shall make CAP Database entries.

l

OPGP03-ZL0002 Rev.6 Page 10 of 30 Conditior Reporting Process 4.4 CAQ Significance Determination and Establishment of Ownership

~

4.4.1 The CRG shall review the Condition (SCAQ/CAQ-S) to validate and determine the Condition significance. The CRG records the Condition significance in the appropriate blocks in the "CRG" section of the CR form.

4.4.2 The CRG, for CRs which they determined to be Non-Valid Conditions, shall forward a copp of the CR to the Originator via an appropriate level of management. Written justification for this detennination shall be attached to the CR form. The CAP Administrative Group shall record the Non-Valid Condition justification and CR closure in the CAP Database, and submit the original CR form to RMS for retention.

4.4.3 Following validation and determination of the Condition significance, the CRG reviews any remedial and compensatory actions taken for adequacy and establishes the Condition Owner. The CRG records the Owner's Department, the individual accepting ownership for the Department, and the Condition evaluation / investigation completion due date in the appropriate blocks of the "CRG" section of the CR form.

4.4.4 The CAP Administrator enters the CAQ significance detennination, ownership, and due date into the CAP Database.

4.4.5 CRs categorized as CAQ-S are processed in accordance with Section 4.6.

4.4 6 CRs categorized as SCAQ are processed in accordance with Section 4.7.

4.5 CAQ-Department Level (CAQ-D)/ Condition Not Adverse to Quality (CNAQ) Resolution 4.5.1 After validating, the Supervisor establishes ownership based on the identified Condition. The Owner's Department and individual accepting ownership for the Department are recorded in the appropriate blocks of the " Supervisor" section on the CR form.

4.5.2 The Owner validates the Condition Event Codes. The individual responsible for this action should interface with the Originator of the Condition and others responsible for corrective actions. The Condition Event Code (s) are recorded in the appropriate block of the " Owner Closure" section of the CR form.

OPGP03-ZX-0002 Rev.6 Page 11 of 30 Condition Reporting Process l

l 4.5.3 The Owner ensures that information recorded in the " Originator", " Supervisor",

and " Owner Closure" sections of the CR form is entered into the CAP Database to allow Condition tracking and trending.

4.5.4 The Owner resolves the Condition.

4.6 CAQ-Station Level (CAQ-S) Resolution 4.6.1 The Owner shall review the Condition described in the CR and assign for evaluation. The evaluation shall be completed within 30 days of the date the Condition was identified.

4.6.2 Evaluation of the Condition shall include event description, APPARENT CAUSE determination, and appropriate corrective actions and action due dates. The individual assigned responsibility to conduct the evaluation shall interface with the Originator and responsible implementing group (s). This information is recorded on the back of the CR form in the CAQ Evaluation Section.

4.6.3 For evaluations that will not be completed on time, the Owner shall request an extension from the CRG. If an extension is granted, the Owner shall update the ,

CAP Database with the revised due date and explanation for the extension.  !

4.6.4 The Owner approves the completed evaluation and enters the Condition Event and Cause Codes and approval in the appropriate blocks in the " Owner Closure" section of the CR form.

4.6.5 The Owner of the CR obtains concurrence on ccrrective actions to be implemented by other organizations. This concurrence may be verbal or written, but the individual giving the concurrence must be documented.

4.6.6 The Owner ensures that information recorded in the " Originator", " Supervisor", i

" Owner Closure and "CAQ Evaluation" sections of the CR form is entered into  ;

the CAP Database to allow condition tracking the trending.

4.6.7 The Owner shall forward the original CR form and attachments to the CAP Administrator for distribution.

4.6.8 Corrective actions shall be implemented in accordance with Section 4.8.

4.7 Significant CAQ Resolution i 4.7.1 The Owner shall review the Condition described on the CR and assign an Investigator. If the Condition requires an Event Review Team for investigation, the investigation is conducted in accordance with OPGP03-ZX-0006, " Event Review Team".

OPGP03-ZX-0002 Rev.6 Page 12 of 30 l

Condition Reporting Process l

4.7.2 The SCAQ Investigator shall perform a ROOT CAUSE investigation of the Condition in accordance with the guidance contained in Addendum 5 and the Investigator's Manual.' The individual assigned responsibility to conduct the investigation shall interface with the originator and responsible implementing group (s).

4.7.3 For investigations that will not be completed on time, the Owner shall request an extension from the CRG. If an extension is granted, the Owner shall update the CAP Database with the revised due date and explanation for the extension.

4.7.4 The Owner shall approve the completed investigation and enter the Condition Event and Cause Codes and approval in the appropriate blocks in the " Owner Closure" section of the CR form.

4.7.5 The Owner of the CR obtains concurrence on corrective actions to be implemented by other organizations. This concurrence may be verbal or written, but the individual giving the concurrence must be documented. The Owner then ensures corrective actions, responsible department and due dates are entered into the CAP Database.

4.7.6 The Owner ensures that information recorded in the " Originator", " Supervisor",

and

  • Owner Closure" sections of the CR form is entered into the CAP Database to allow Condition tracking and trending.

4.7.7 The Owner of the CR shall forward the original CR form and completed investigation to the CAP Administrator for concurrence and distribution.

4.7.8 For those CRs that are Reportable Events or concem significant operating abnormalities or deviations from normal and expected performance of plant equipment or systems that affect nuclear safety, the CAP Administrator shall forward a copy of the completed investigation to the Plant Operations Review Committee.

4.7.9 Corrective actions shall be implemented in accordance with Section 4.8.

4.8 Corrective Action Implementation and Effectiveness Review (CAQ-S and SCAQ) 4.8.1 Each organization assigned a specific corrective action (s) shall initiate the appropriate activities to implement the corrective action. When the corrective action has been completed, the Owner shall be provided evidence ofits completion.

OPGP03-ZX-0002 Rev.6 Condition Reporting Process Page 13 of 30 l

l 4.8.2 The Owner shall review the status of the corrective actions to verify that the approved actions are implemented as planned. For corrective actions that will not be completed on time o' r are past due, the Owner shall address the reasons for the delay to the CRG to determine impact and course of action.

4.8.3 Upon verified completion of a corrective action, the Owner updates the CAP Database describing the action taken and referencing the action documentadon. If the corrective betion is a regulatory commitment, the Owner will retain objective evidence ofits completion ~until the Condition Report is closed. Then, all objective evidence shall be submitted to RMS for retention with the Condition Report.

4.8.4 For SCAQs, upon completion of all corrective actions, the CAP Administrator shall perform a quality assessment and close the SCAQ in the CAP Database.

4.8.5 Following complete implementation of the corrective actions, the Owner reviews all actions for adequacy and effectiveness.

4.8.5.1 If the Owner assesses that corrective actions have been effective, as determined by validation of non-recurrence within historical recurrence time frames or usage frequencies, the satisfactory assessment shall be submitted by memorandum to the CAP Administrator for inclusion in the .

record for that CR.

4.8.5.2 A CR shall be initiated for implemented corrective actions found to be ineffective or likely to compromise the Condition resolution.

4.8.5.3 Objective evidence retained to document regulatory compliance shall be submitted to RMS for retention as part of the CR record.

5.0 Condition Tracking and Trending 5.1 The CAP Administrator shall evaluate Condition Event and Cause Codes in the CAP Database to determine if an Adverse Trend is developing based on occurrence level thresholds established at Department and Station levels. The CAP Administrator shall validate Adverse Trends.

5.2 Department Managers shall ensure that Condition Event Codes for CAQ-Ds are evaluated to determine if an Adverse Trend is developing.

i l

I l

. l J

OPGP03-ZX-0002 Rev.6 Page 14 of 30 1 Condition Reporting Process I l

1 1

6.0 Interfacing Processes

~

6.1 One or more of the following processes may be entered from the initiation of a Condition Report.

)

6.1.1 OPAP01-ZA-0102 Plant Procedures 6.1.2 OPGP03-ZA-0090 Work Process Program 6.1.3 OPGP03-ZA-0107 Security of STP 6.1.4 OPGP03-ZE-0031 Design Change Implementation 6.1.5 OPGP03-ZF-0012 Fire Fighting 6.1.6 OPGP03-ZF-0014 Fire Prevention Surveys 6.1.7 OPGP03-ZF-0017 Fire Protection Unanticipated Impairment 6.1.8 OPGP03-ZI-0022 Industrial Safety & Health Inspections 6.1.9 OPGP03-ZO-0320 Equipment Labeling 6.1.10 OPGP03-ZT-0152 Security Training and Qualification Program -

6.1.11 OPGP04 ZA-0002 Condition Report Engineering Evaluation Program 6.1.12 OPGPO4-ZA-0309 Design Change Package 6.1.13 OPGP04-ZA-0603 Material Testing Program 6.1.14 OPGP04-ZA-0108 Control of Vendor Documents 6.1.15 OPGP04-ZE-0310 Plant Modifications 6.1.16 OPGP05-ZN-0004 Changes to Licensing Basis Documents and Amendments to the Operating License 6.1.17 OPGP09-ZA-0002 Fitness for Duty Program 6.1.18 OPOP01-ZQ-0032 Plant Operations Department Self-Assessment Program 6.1.19 OPRP01-ZR-0011 Radiological Occurrence Reporting

OPGP03-ZX-0002 Rev.6 rage is or30 l

l * *" **

l Condition Reporting Process l 6.1.20 OSDP02-SE-0002 Probability Testing 6.1.21 OSDP02-SE-0006 5ystems Trending Program 6.1.22 OSDP02-ZS-0024 Security Incidents 6.1.23 OSDP02-ZS-0034 Security Force Organization 7.0 References 7.1 NGP -131, Corrective Action Program 7.2 STP Business Plan 7.3 Investigator's Manual 7.4 Reporting Manual 7.5 OPGP05-ZN-0001 - Preparation of Requests for Enforcement Discretion 7.6 OPGP05-ZN-0005 - Justification for Continued Operation 7.7 NRC Generic Letter 91-18 7.8 Technical Specification 6.5.1.6 - Plant Operations Review Committee Responsibilities 7.9 OPGP03-ZX-0006 - Event Review Team 7.10 SPR 940338 (Operability and Reportability Reviews) 7.11 SOER 92 Reducing the Occurrence of Plant Events Through Improved Human

. Performance 7.12 SPR 920201 (Delayed Entry into Tech. Spec. 3.0.3) 7.13 LER 88-063 (Vortex Breakers)

OPGP03-ZX-0002 Rev.6 Page 16 of 30 l

Condition Reporting Process l

8.0 Support Documents 8.1 Addendum 1 - Process Flow C5an 8.2 Addendum 2 - Condition Level Guidelines and Examples 8.3 Addendum 3 - Operability Determination Guidelines 8.4 Addendum 4 - Reportability Deterniination Guidelines 8.5 Addendum 5 - Guidelines for SCAQ Investigation and Reporting 8.6 OPGP03-ZX-0002 Condition Report Form - Typical

l g

\

=,

    • ** Rev.6 OPGP03-ZX-0002 Page 17 Of 30 Condition Reporting Process .

1 Addendum 1 Process Flow Chart PageiOf1 4.1 r Originotor' '

W eerve f

Condtnen identamed Cond! tion /  :/ STOPl i Doesn't w Awkn Need e Attention?;

\ i wu \

sewiunes } 4,g 4,g Attentaen F Origineler' "Originoter' Condition _ duen y Correct f

Needs to be 4,

gdit 7 STOP1 Documented J, . .  ;\

Censuen Jnfilote CRt < ocess ; \

88P8't } 4.2 4.2 wueie.

trocess owner' " Supervisor' F Originator 7 /

Obtoln gor, UND - Condition DetNYg is Non-Valid Condition Q'd ;/ STOPL t

information gg e Volid?

ONth

<0riginatorf; M

g, { 4.2 4.2 F Supervisor' ' Supervtsor' heen for OperabRity, Y  :

% cAos-Department 4.2. 4.5 : Appropriate weg a

CAO-stouan Lw Reporteb4ity & tad ed Process ope / ygsgeg gag LSMifeconce; e OtAQ  ;

Man-ft sportatge Do h tad e/ h 4,3 W dew WW SPAM r 33 ,_ eNt - owww l - nc

~ me seen.s F*d " Appropriate eport it p ef,,

vtanes suc , Seterminetlog

~

U 46 D'

  • W

' @tc gerew,e ', 54 4 4.7 F

Owner CRG l F Owner 1 Review CAQ ond Assign

  • CA0 m Determine

-Significance /

D Review SCAO and Assign cAo for Establish  %.

to 0 sty for g3dg & Resolution ; e Owner ; e Resolution ; ,

Apparent d hennesst aset r ,

$ Come hosed sc.a.use Owner r ' ' '

.osd Owner Owner y; Determine D*w' Obtain Perform to k;n,i AP Apparent p""ecua Corrective " Root -  : dministrot

  • Action Casse y to Co""  ; *

@,'m '  ;

i concurrence 2 < Ancfysis  ;

iginetw g p ,'nd*d d j 4.8 f "d*

Accone r o,n , , rDepartment' "

Owner ' " #d*"

Determine , implement gga Determine Correctiw Corrective adw. Corrective Actions Actions Actions SCAO

" e,is ws ' "

CAQ-s r o,n., , CAO-D Coneetfe Acuans fieview CNAQ

-*Effectiwness -

" of Correcthe Owner ' Actions ;

Ineffectlw

/

l Initiate l l Effective _ /^88'8g"

Correcte.ve Actions

~

CR Corrective Actions &ninstrator TP 26 g  ; F-esetseg

1

- 1

.. j OPGP03-ZX-0002 Rev.6 Page 18 of 30 Condition Reporting Process Addendum 2 Condition Level Guidelines and Examples Page 1 of 4

)

Guidehnes 1

1. Condition Not Adverse to Ouality (CNAO)

Guidelines Condition does not affect plant safety, reliability or public safety.

Trending this condition adds no value to improving station performance.

Examnles Boards retumed to warehouse without packing material.

Trash drum without a cover.

East parking lot lights off; switch off.

Procedure feedbacks that are enhancements.

Contamination monitor out of service due to high background.

Survey instrument malfunction.

Minor leakage in secondary steam systems which require routine maintenance to correct.

Instrument recalibration and adjustment to correct instmment drift, so long as Technical Specifications or design basis limits are not exceeded.

The need to correct typographical or grammatical errors, or updating organizational assignments, in procedures.

The need to make minor drawing changes which do not impact the technical content of the drawing.

Errors in a proposed design or design change (on drawings, in the calculations, in specifications, etc.) which are discovered during the procedural design process by independent or supervisory review.

" Actuated- Closed" power operated (motor, air, etc.) valves that have been back seated, but which have a current engineering justification demonstrating that back-seating is acceptable.

Recommendations resulting from Audit Reports (AR) and Surveillance Reports (SR).

~.

OPGP03-ZX-0002 Rev.6 Page 19 of 30 Condition Reporting Process Addendum 2 Condition Level Guidelines and Examples Page 2 of 4

2. CAO-Department Level (CAO-D) -

Guidelines Condition affects departmental personnel or processes.

Condition requires documentation (e.g. design configuration control) for correction.

Condition should be tracked for repeat occurrences and trending.

Condition resolution can be effected by a single department even though assistance from other organizations may be required to facilitate resolution, (i.e., engineering support, evaluations, etc.).

Non-consecuential Conditions - Adverse Conditions that did not result in adverse consequences (near misses).

Examples Routine corrective maintenance activities.

Ccndensate system valve tags do not agree with P&ID labels.

Mechanic not qualified to work alone due to expiration of basic certification.

PCF issued instead of Temp Mod to document a temporary plant condition.

Badge for terminated employee was still active.

Component returned to service without cl:ecklist signed by Shift Supervisor.

Lost dosimeter.

Lube oil temperature setpoint calculated incorrectly.

P&lD incorrectly identified feedwater heater isolation valves.

Security Incident Repons (SIR).

Concerns resulting from Audit Repons (AR) and Surveillance Reports (SR).

. w" " " " ' " _

OPGP03-ZX-0002 Rev.6 Page 20 of 30 P Condition Reporting Process

=

Addendum 2 Condition Level Guidelines and Examples Page 3 oT 4

=rm-u

3. CAO-Station Level (CAO-S)

Guidelines

- Condition could affect plant safety, reliability, or public safety.

Station commitments, not reportable, were not adhered to.

Conection of the Condition may require management level interdepartmental coordination.

Apparent cause of the Condition needs to be determined.

Condition conective actions need to be evaluated for effectiveness.

Plant Procedure (s) not adhered to.

Examoles Increased rate of failure and conective maintenance activities indicate reduced reliability of a piece of equipment.

During power ascension, Main Steam to Deaerator valve drifted open unexpectedly resulting in an uncontrolled power increase of 2%.

The ECO procedure was not adhered to.

The wrong size fuse was installed in Class IE MCC E12C.

The setpoint for SDG 12 stator high temperature alarm is set incorrectly and cunent configuration may not be adequately controlled.

Individual entered High Radiation Area on wrong RWP.

Locked High Radiation Area door found open.

Multiple problems were encountered with Main Feed Pumps during plant startup.

A potential environmental release path for transformer oil has been identified from the Outage Transformer berm.

Constant process flow for the Unit Vent noble gas monitor was undetected for 3 days; a repeat event. _

During performance of OPSP03-MS-0003, low pressure turbine reheat stop valve and intercept valve failed to stroke.

During investigation of Auxiliary Steam leak, it was identified that the condensate header between Units 1 and 2 and the auxiliary boilers was pressurized.

Deficiencies resulting from Audit Reports (AR) and Surveillance Reports (SR).

.~

  • * " " * ==

OPGP03-ZX-0002 Rev.6 Page 21 orso Condition Reporting Process Addendum 2 Condition Level Guidelines and Examples Page 4 of 4

4. Sinnificant CAO (SCAO)

Guidelines Condition is reportable to outside authorities.

If left uncorrected, could affect plant safety, reliability, or public safety.

Condition is an adverse trend of previously documented Conditions.

Procedural barriers intended for plant safety were violated.

Examnles Individual worked more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> in a 168 hour0.00194 days <br />0.0467 hours <br />2.777778e-4 weeks <br />6.3924e-5 months <br /> week without prior approval.

EDG 12 received a start signal that was not initiated by personnel or planned activity.

While moving fuel assembly D44, a thimble plug was knocked over.

Adverse Trend involving inadequate operational procedure accuracy.

FOSAR found unexpected objects on lower core support plate.

ESF Actuation - inadvertent start of Train A CCW pump due to personnel error.

Component Failure Analysis Report showed a high rate of specific component failure at STP when compared to industry.

Control Room staff performed PMT on DRPI using procedure as a guide and failed to perform a step in the procedure.

Individual radiation exposure greater than administrative or regulatory limits.

Significant deficiency resulting from Audit Reports (AR) and Surveillance Reports (SR).

l OPGP03-ZX-0002 Rev.6 Page 22 of 30 Condition Reporting Proecss Addendum 3 Operability Determination Guidelines Page I of 3 The purpose is to determine if the Technical Specification related structure, system, or component (SSC) in question is capable of performing its specified function.

Verification of operability is supplemented by continuous and ongoing processes such as:

Day-to-day operation of the plant

  • Implementation of programs such as inservice testing and inspection Pirat walkdowns or tours Observations from the control room

- QA activities such as audits and reviews Engineering design reviews.

Without any information to the contrary, once a SSC is established as operable, it is reasonable to assume that the SSC should remain operable, and the previously stated verifications should provide that assurance. However, whenever the ability of a SSC to perform its specified function is called in question, operability must be determined from a detailed examination of the nonconformance.

He determination of operability for SSCs is to be made promptly, with a timeliness that is commensurate with the potential safety significance of the nonconformance. If the Shift Supervisor initially chooses not to declare the SSC inoperable, he/she must have reasonable expectation that the system is operable and that the prompt determination process will support that expectation. If the non-conforming condition requires an operability review that it not made by the Shift Supervisor, operability review shall be completed in accordance with Section 4.3 of the procedure.

He measure of " reasonable" should be a function of the safer, significance of the nonconformance and the magnitude of the uncertainty.

1. When reasonable technical judgement indicates that the nonconforming SSC is capable of

, performing its specified safety function if required, the equipment should remain operable.

a. If there is reasonable assurance that the SSC is capable of performing its specified safety function and the determination process will support this expectation, but there are some remaining concerns or uncertainties, the equipment can remain operable until further evaluation can resolve the concerns.

OPGP03-ZX-0002 Rev.6 Page 23 of 30 Condition Reporting Process Addendum 3 ' Operability Determination Guidelines Page 2 of 3

b. If the initial evaluation indictes a that the nonconformance is irrelevant to the safety function of the equipment, the equipment should remain operable.
c. If any immediate compensatory actions, such as temporary braces or other alternatives or " fixes," can be used quickly to provide reasonable assurance that the equipment will function until remedial action can be completed, the equipment should remain operable.
2. When reasonable technical judgement indicates that the nonconforming SSC is not capable of performing its specified safety function, the SSC should be declared inonerable. Then, perform one of the following:
a. Initiate compensatory actions that will result in the plant operating:

- in a safe condition, within the licensing basis, and withm the Technical Specifications.

b. Prepare a JCO (Reference 7.6) when the SSC Condition and the compensatory actions will result in the plant operating:

- .in a safe condition, outside the licensing or design basis, and within the Technical Specifications.

c. Request an enforcement discretica (Reference 7.5) when the SSC Condition and compensatory actions will resuP. in the plant operating: ,

in a safe condition, '

outside the licensing or design basis, and outside the Technical Specifications.

3. The Shift Supervisor or station management may request additional support from other Departments to determine reportability and/or operability. Generic Letter 91-18 and Part 9900

'of the NRC Inspection Manual provide additional detailed guiduce on operability.

J

)

4. Resolution of the nor'conformance shall follow the process shown in the flow chart in this  !

l Addendum.

l l

O OPGP03-ZX-0002 Rev.6 Page 24 of 30 Condition Reporting Process Addendum 3 Operability Determination Guidelines Page 3 of 3 001a0tf

  • 00Nnf30N EIDf1MED 1,

ESTRMSIM NG)OR sert EUPUtWSOR .

EVAWAE 1r APPR(MEAR W3 S

- < __ _fBAL. .

ACDON g By peQMEImms g I [y

/ \' -

D(M 9F r NO WS g D.(TD,t

,A - ACVON y _

Blu D

,y -

m W1 W gy$,

m

_ TutY NO l

( 0 M m 2w-axn

'a % 9 ar<m-zh-eaas >

NO 1r N TO F111Du 1t04 SFT4 PUT PLANT N SAFE C3fMMLAh0N STP F-0064&uo

.a >

0PGP03-ZX-0002 Rev.6 Pqe 25 of 30 Condition Reportlag Process Addendum 4 Reportability Determination Guidelines Pqe 1 of 1 The purpose is to determine if the Condition identified is reportable to Federal, State, or local agencies.

When a Condition is identified to a Supervisor, the Supervisor shall screen the Condition for reportability. The tools available for this screening are the Supervisor's knowledge, discussion with another individual that may be more knowledgeable of the Condition, and/or reference to the Reporting Manual.

1 Types of events that may be reportable include:

Technical Specification violations License / FSAR violations Offsite Dose Calculation Manual violations Radiological violations Environmental concerns Nuclear materials Quality assurance violations Design basis concerns Configuration deficiencies If the Condition falls into one of the above areas, refer to Section N of the Reporting Manual to determine if the Condition is immediately reportable. If the Condition is assessed to be immediately reportable, the Supervisor shall have the Condition Report hand delivered promptly or delivered electronically to the Control Room.

The Shift Supervisor should confirm the reportability assessment made by the Supervisor by identifying the specific regulatory requirement listed in the Reporting Manual.

O

~

OPGP03-ZX-0002 Rev.6 Page 26 of 30 Condition Reporting Proecss Addendum 5 Guidelines for SCAQ Investigation and Reporting Page I of 3 The following guidelines shall be used when conducting an investigation for Significant CAQs.

NOTE When investigations involve issues relating to personnel perfonnance, the name of the individual (s) '

involved shall not be disclosed within the report.

l i

One or more of the causal factor analysis methods described in the Investigator's Manual should be i used to prepare the investigation. For SCAQs, supporting documentation used to conduct the investigation is to be included in the investigation package.

Report Format The standard SCAQ investigation format includes the following sections:

1. Event Description II. Event Significance III. Event Analysis (NRC required reports only)

IV. Cause of Event V. Generic Implications VI. Conective Actions VII. Additional Information I. The " Event Description" should include the following:

+

, The plant operating conditions before the event if the information is significant to event l understanding.

+ Factors leading up to the event.

+

The dates and approximate time for all major occurrences.

+

The method of discovery of each failure or deficiency.

+

The status of any degraded o. inoperable component that affected the event outcome.

+

A list of components or systems that were affected by each component failure or fault.

Q

~

OPGP03-ZX-0002 Rev.6 Page 27 of 30 Condition Reporting Process Addendum 5 Guidelines for SCAQ Investigation and Reporting Page 2 of 3

+ All major personnel actions that affected the course or outcome of the event.

+ Any procedural deficiencies that contributed to event outcome.

+ All automatic or manually initiated Engineered Safety Feature (ESF) that occurred including those necessary to stabilize the plant.

IL The " Event Significance" section should include the following:

+ A clear understanding of possible personnel injury, radiation exposure, offsite .

radiological releases, damage to imponant safety equipment, and other tangible effects )

due to this event. i i

+ An evaluation of this event as a precursor to a more significant event. 1 l

+ The barriers or conditions that prevented this event from being worse.

+

The applicability of this event to other plant conditions and the significance.

+ The similarity of this event to any previous events at STPEGS.

IIL The " Event Analysis" section shall include the following:

+

The reason the event was considered reportable. The specific reporting requirement SHALL be listed.

+

The reason the component or system was considered inoperable. This should include an estimate of the length of time the component was inoperable prior to discovery.

+

A validation of previous reportability/ operability reviews issued in conjunction with the CR.

l IV. The *Cause of Event" section should include the following: l i

+

The causes or causal factors of the event. This includes contributing causal factors of the event or causal factors that did not prevent this event from occurring.

+

A plan of action for determining the causes or causal factors for any item that is unknown at report issuance.

+ ~

The failure mode, mechanism, and effect of each feJed component.

' "" OPGP03-ZX-0002 Rev.6 Page 28 of 30 Condition Reporting Proecss Guidelines for SCAQ Investigation and Reporting Page 3 of 3 Addendum 5 V. The " Generic Implications" section si ould include the following:

+ A list of broader ramifications of the causal factors of the event. This should inclu information from previous CRs or documents supporting the generic implication or a plan of action to determine the scope of the generic implication.

VL The " Corrective Actions" s tion should include the following:

+ Remedial actions taken by plant personnel to stabilize the plant and place the plant in a safe configuration.

+ Compensatory actions planned or taken to address the identified problem. Each action listed shall include the name of the person responsible for the action, a due date or expected completion date, and a complete description of the action.

+ Corrective actions required to prevent recurrence of the event, the causal factors, the generic implications of the event,and the causal factors of the generic implications.

Corrective actions shall be the outcome of an activity, not the activity itself. Each action listed shall include the name of the person responsible for the action, a due date or expected completion date, and a complete description of the action.

VIL The " Additional Infonnation" section should include the following:

+ A description of each failed component by manufacturer, model number, and other identifying characteristics.

+ A statement of the previous LERs and CRs/SPRs that are similar to the described event.

The review should be limited to the past three years.

+ A statement of any NPRDS and maintenance history database items associated with the corrective actions and whether the item was reported on NPRDS.

.I** OPGP03-ZX-0002 Rev.6 Page 29 of 30 Condition Reporting Process i

Condition Report Form - Typical Page 1 of 2 Form 1 CRs (DEPT f)

. TPNSs PROCEDURE 8 DOCUMENTS REVW REW fu ROOM 8 ELEV DISCOVERY DATE DISCOVERY TIME UNIT SYSTEM BLDG M, CONDmON DESCRIPTION (INCLUDE INFORMATION PERTINENT TO OPERABILITYI REPORTABILTTY DETERMINATION A COMPENSATORY ACTIONS TAKEN) h .

3 l 2

o CONTINUED DEPT EXT.

ORJGINATOR NAME (PRINT) StGNATURU DATU TIME REGULATORY ISSUE VCRK ORDER QA FINDING OrEEDaACk O DESIGN CHANGE CORRECTED VW OPERABILITY IMPACT ]YES ]NO ]lNDETERMINATE YES NO INDETERMINATE REPORTABLE PER.

REPORTAB!LITY IMPACT DEPT CNAO OWNER DEPT; CONDITION LEVEL ] STATION OMER NAME:

j S:GNinCANT CAo []YES NO C.

PRELIMINARY EVENT CODES (S)-

NON-VAtt0 CONomON (ATTACH DETERMINATION JUSTIFICATION)

EXT.

SUPERV'SOR (PRINT)

SIGNATURU DATU TIMU OPERADLE YES NO REPORTABLE YES NO MODE RESTRAINT ]YES l AGENCY, NO C OTLt.

O LCO EXP. NOTWICAT60N DATE/ TIME.

3 (DATUTIME)

REPORTABILITY CRITERA MODE.

LU h CouMENTS e

b l

CONTINUED E3 _

SHJT SUPERV!SOR (PRINT)

SIGNATURUDATUTIVE NON VAL 1O CONDITION (ATTACH DETERMINATION JUSTIFICATION) OWNER (DEPT /NAME)

SCAO 20 DAY 30 DAY OTHER CRG MEETING DATE:

U CAQ DUE DATE; CRG REVIEWER (PRINT)

CRG SIGNATURE.

]OTHER INVESTIGATOR (PRINT) (SIGN. OAT E)-

g m

D y APPROVAL (OWNER) (SIGNOATE) d CONDITION CAUSE CODES tr COND:13ON LVENT CODES E CAP ADMINISTRATOR (SCAQ)

DATABASE UPDATED f

. c) u

l ** ** OPGP03-ZX-0002 Rev.6 Page 30 of 30 Condition Reporting Process I ForTn 1 _

Condition Report Form - Typical Page 2 of 2 WORK ORDER EVALUATION PRIORITY OTU LCO. EXP. DATEMME WSA MODE SPECIAL PROGRAM NEED DATE LCO F/N) WAN FCD MLST WORK GRP WORK TYPE VOtD %QRK ORDER MINOR MAINT. INVAUD l

COMMENTTdRECOMMENDATION.

1 F02 MINOR MAINTENANCE WSA NOTIFIED:

START e PERSON 44RS CLOSEOLTT SIGNATURE-COMPL HOURS Ot3COVERY CODES STATUS SYMPTOM DETECTION b ADDmONAL PAGES l

CAQ EVALUATION  !

ASSIGNED SUPERVISOR INTERNAL DUE DATE

  • PARENT CAUSE:

l CAUSE CODES.

CORRECTfVE ACTIONS. ,

1 RESP PERSON. DUE DATE:

RESP PERSON: DUE DATE:

RESP PERSOtt DUE DATE.

DEPT APPROVAL

  • DATE:

b ADDITIONAL PAGE FEEDBACK PROCEDURE CURRENT REV; TITLE.

ASSIGNED TO DUE DATE

%OBLEM RESOLUTION REVtCWTR DATE CLOSURE REF.: R EV..

I/ , , pL

^

.. $13 486 (04/93) SOUTH TEXAS PROJECT ELECTRIC GENERATNG STATION

"' OPGPO3-Zx-0002

}f STATION PROBLEM REPORT l cAc CuEc0RY 03 02 03 04 lids Os SeR uo. Tu I4 l,0 P A R T 1: IDENTIFICATION OF CONCERN A.UMT i Oi O C0uuoN NinATEo: uAME Jm R . Por.uA ' oE,1Igofg dw7goz ;

32 O 807n poSm0N Ik nacier. SMcb&puoNE no._ 883I oATE 7/25/* # muE /15'_T oiSC0 VERT: Dt 7/tJNF fiuE eWO EVENT: DATE Tlut IMMEDIATE SUPERVISOR: * /MR DATE TlWE S10 NATURE (NOT REQU: RED)

COMuCNTS B. PROBLEM DESCRPfl0N bul/AS [ val 1)AT/*w of S. A F AAI- 3%N.3 fot /Ar7*

250s) fEMFAfr"< IT k/RS b/SO)esstED 77/kT Al2NE- TT~ 9SW WAS REAntKfb S V B e nik ni n uuk Nr F tr U+s FvL7WEL bhceporn 7tfAT THE scME OF THE 56dv10 R E0t/EST uln s RADADEAIFn '/LNAAltsb V/A efAI + mr

. M A AlfrE RY AAI D e hblX ft/Estb!/10/ . T//f DATE W 7t/s ppgi f'jg/g dikA!6E sib 5 7/zz/sq (syris usLx 57;+,tr unS styfx Art 1/se/rpt .' r tu orno3- EA 8 0 W MP .1.S'.Z A AfwM W4-$ AEQUED F#A WG

/AAAlfE AAID LE V/ Stoat l'ULE f/b4/kT1/2EL Ner 067A//Vf D .

$ C. IMMEDIATE COMPENSATORY OR REME0tAL ACTIONS TAKEN

( ) CONTINUAtl0N SHEET ATTACHED i y -

[ ks Rsoo,wb 5

3%5 LOP Linsws LF:${lsJcD irz*-*/

c. loENuriCAn0N [ ] CONTNUAt0N SHEET ATTACHED SYSTEu W& HN CouPONENT NAuC ~RIfflY Alf 6.R. WIT 3/FM M147 ssesparun isnamarva.

COMPONENT NO. NNE ~ 7 T ~ df FN etoc b$h ROOM INSTRUCTIONS FOR PART 1 COMPLETION '

DESCR$C YOUR CONCERN CIVING AS WUCH Nr0RMAT10N AS POSSIBLE.

FILL W ALL APPLICABLE SECTIONS OR ATTACH DOCUMENTATION.

NDICATE WHAT. MEN. WH0. WHY. WHERE. HOW. UST ANY REFERENCES.

r DESCRSC ALL IMMEDIATE COMPENSATORY / REMEDIAL ACDONS TAKEN NOTE:

E POTENTIALLY REPORTABLE. OR IF ANY 00UST EKISTs RECARDING REPORTABILITY. I.tiiti DELIVER IMMEDIATELY TO THE SHtFT SUPERVISOR. OTHERWLSE. DELIVER TO THE CAC ADMINISTRATOR.

, t .

1' -

, SeRu,.V'{lYlob'~.5 PART 2: REPORTABILITY /

WODE Rr Power Rs Press As Temp Trip,,7

~

. A. UNIT 1 / /00 /i$6 Sf] *Vjl(

UNIT 2 / /OO 'EZA 8 6f3 A'/]

ESr ACTUATION NTIATWC SIGNAL IN (~-

B. OPERABfUTY/REPORTABUTY DETERMWATION

[ ] OPERABluTY REVIEW REOutRED [ ] WTHIN 24 HOURS [ ] OTHER (See Comments)

O g

{ [ ] REPORTABLE PER LAW / PERMIT /UCENSE wTHIN TIME: HOURS

[ ] REPORTABUTY REVIEW REOUIRED NOT REPORTABLE 2  !

aj COwuENTS 5

h 8L N0finCATIONS DUTY PLMdf WANAGER [ A PERSON CONTACTED DATE/flut INITIA($

NRC RESIDD4T 6NSP [ N/A PERSON CONTACTED DATE/ TIME INITIALS NRC OPS CENTER [ PERSON CONTACTED DATE/ TIME INITIALS OTHER

[ N/A PERSON CO TEdl - DATE/ TIME INITIALS shirt SUPERVISOR g- DATE/Tiut >

C. REPORTASluTy REVIEW

[ ] REPORTABLE PER WITHIN

[ ] NOT REPORTA!LE LA /' P(RWIT/UCENSE / DME: HOURS uCENSING REPRESENTATIVE - - # DATE 2M4 D. %RITTEN REPORT TO NRC ypE DUE DATg PART 3: ACTION ASSIGNMENT CAc RECiEvED D4ftYMWuto63 7 EvtNT COoES 1:r/23 c=01/1 si.ib em

< DEPARTWENT U '2" M W C ACDON cT/c>"

  • u DVE DEPARTWENT ACTlON DUC DEPARTWENT ACT)ON DUE g PART 4: ACTIONS TO BE COMPLETED [ Rem.eiei/ Comp.n.atory (R) or coer.eii (C))

l A k> o. a .ws&, e1Am 2,&J/wm e, w i L % u i,Ae 2 w k N MA ew b 1'1.1994 A2 I& f.h14.b % tw & on'Af! w N;Pau b i 0 #

a. Wo. E.02(, (Cseu, othra b ,

y PRIMTY DUE DATE APP AUTHORITY l n DATE a

N PRIORITY 1 G CATE. s CLOSURE

_ DUE D ATE OMd PP AUTHORITY 7-u W DATE

[)@PR,0yA HOR Ty V u CATE. S/6 CLOSURE T

CA/DC OATE

--- 7% ' e, __ ] OA4 [ ] CONTINUATION SHEET ATTACHED 1

l

- . .. _ . _~ -

o .

1 s - . .

.. . a.

l

~

- ' - ~

' /.

c

' Lessons Leamed Transmittal No. 94.026

.. ' 9.;;i

-.e . . ~

i t

,.s.,.

u,w .-. ,., g..m . . + ,, . + . ~ , .

~.~.. e. . . ~ . ~ ..r ...~. , . , . - s. .~..~- ,

IV . f . n,j% m . . . . 4

, . .. .~. .ESSONS' LEARNED RANSMIT.TAL,.E

' . ~ . . , . -

j

'4f M.. 4'W

.. p g a c W.r.;of M mem e:.trer.ps, sW "ty.M ~. %W/#'$ "

~

'i j e g/ i

. . APPLICABL ' DOCUMENT ' l

$..N.M N 4 M , . . . .

l Pf.g., 4 DESCRlP, TION.O EVE

. . : <. D' 4.,, q ..

l f f' SECTION iSWvicMeYeith1$M9 A,. sy, _ _ _ _ _ __at W Won J n I e rvis vi w e .

N cliayto'th'Qteiis' r requiring vaSrepackir'gyt T 'he supept,sh th& .f. ,, ,,,* l

'W W {isfactoryu MfyQe_,,,as(s_.,. _ h MS.1-103919 fad Iristalldd attem'a lb static load'vatve'packingg'ith sat P ,for,t ~

~

^$W chan'~oTvEs g in th,e%u%iEar~y sEdlo"Y' o f th'eTiEdiIrderjQnft'er(kihdeg , of ., the;scopegvaslperformedg _ ,

ng gpu,u

.'~+ . . the valve was released awaiting PMT, When. Unit.1 was,,.re, turned to se3vgs ,

. the, installed leakedbe@v. d' thicapab.ilitjfofha'kidg m c ~ r <.. an.4*m5m.< y adjustment w%vw% g.Q' to' .QTcontrol.Wh *QgG n c m..s.v.:., , ,s.s. c -.

eM&{y Q'g p gpp$*GygyO[b[kNh.h h.WhbkkhYkNENk'[NN$fk!

- Inadequate'docDinent riview and.f.ie. ld walkdown. . .. .pdo.r . to .o,Initiating ....:pen and $ s . .. .

  • ' documenlggyggl,qQQ;ypfWggg,;p.fy.;,Inl 'g changes to a,workym.. ,,_ ...

. . ,. . . ~ . . . . . , . .

j "r .

, QQigjggyQf(ggkQ

- .. . . ~ . , ~ . , . . . ...., n . ~ . ~ . . . . .

SECTION 3: n *

  • LESSONS LEARNED,were .~ -w..n.

. xc..nwf m nf

.n.-... . . . . . . . . . . . . . . ~ . . ~

n.e.c.8re.

1

~

.~ Fully'un'd ers'takiih5the' eifuijin'e'ritlcsridition 'and, history Is_,ne_cessary pdor.to snaking pen and ink q. yf:g , 3 v.m. chanDes. _to wo.rk. do.c.ume.nts .t.o e.n...s.u.re . the., scope,of work Is no.* cmchanged waswm an.d necessary actions are b .p,gyA...

. i.

2 ,

taken to correct the delictency.t., n : . . . ..;s on. .,.nn. m:wpy.9w . w.;.

. .w,.x.. vtem.

mer.

. ;3ys . ww.wm..

G. &M.hnWsi?MiiM4%M3d&G$5 GNAU k changgsg?'.'.W.Y ~* , .

pen en ,kk yo,u.r

%syls,"  ;.r1 Maintain

' u : scope ^wCI these changes make?". and more importantly,[

  • 'a'qu6stioning' attitude)vhen.tnaking&*4.WQd s,oyon,e

}ng thpq,,,pg,y ,,,,~Eh y _ g.,9. .,

,; l j

.. . . . ....,.....s.... . . . ~ .. 3.z...,, . . . i

. . g deficiency.could this cause?. ..; m .g ;g; . m .$.g,..y g y,p ...w. g .,......... ._. s .. .m..em,.g.p'g:pgg.

3, y3.;.g.g.;

. . , , v.m, , l

.a  ::. : ;. '. :;;T, ':, .. :CSm:22. :?:6:1;.:l.2%.?hty;,%kC:,?,,ry W,25 L '

.qq :y:m: a . ';~ p.: w.:v.4mqn1m. gp;6.g:%t':g

. . . . ~ . . . .. ... . .u . , .- .

.:p ?,',MM,2.2W'

. . w. _

..m;.y:;ypq .py.

.. . c. s -

..**u

.',,..y, s

m,-s. s. g 9. .(~:: . .

3._., . r; . s:o.*pp.. .3. . )...c l .* y s . ... ;s.m. ... .. .y.,...>. ., . . 3,; . ;, . . .

. ., g .;

. .x,e :. : . .na , - c: w. , .a w.m.

. . . -v . . .< . ,%. a.- .. .

.n . .. q.s .;y .y 4;yy.,gjf y.;w.a.1pw,ya:g.+.e mryy.,m,ww ,w. w.mn;.:.,:sg y.g.;ggfcg ggigyg:,y y

-.. y..,. . a.y. .. 9.~ ,3.. ., g , . . .s . p. % ,, .

n,,.e.v. e,,

~f.M

.' W $f g t%~M V:' W p %.%ph Mh gg$%g.g p g m g.7,3.9.#.3.. fin.m%  ?,Q. gg. gQ

.. a., &*yUM;%!k M . 4 m&:.tk. @:1QM)p.si:r&.,nv:qg  %%.w-:m.y.M.gs k:W,A'M % lfnh*g!;Qn'O 4yy,W;,;;.k Q;QX

..=:. y.,,

u ~4'um %c;c46.%.e./,.

'777cAWMiWEfGu;,Qnsat4

&s. 6%%g%9,j 4,ka. g.ss%;x:hy.r.m;,.::i. .

pQuqi4W M'w%qekfrg.

- @y.Td.WuGM ' igg 9@UWfifattn7nmsE M W MfMWM M M 8' M M @g.

I. *. & An. n > q W g.". . .w.q5 Qv Q.

M!do ..% . -.L. .?.'..y, Unit 2 Maintenance Managerh.u. ,.w.. .,. y* ,,., . c(Gfe

i , . eu.m,.. 14 , . .-y :. . *.tM2 MMC ..M .:. le?.@Q'Q~[ u g.*

,M

, ,..,,....-.w. *w e

~a. ^M*AmySourco

,W.*Jh.*wf.*w:o,e.<e wree e.g:,2 %ropmW1e

+ *, m ,.v e @'t*/Es e's.4 %dbe.* p** g,g yg g $~ $w #@ 7 Document f .s-A.- '.-

@ hut

  • yrA ..tv t? a) 'I,N o p.p.9,$,,:vy,m'f@. n .gh u;w*gb.w,4/V

. ,v.

c .,y.. : v,.m v QPAhg'.s 3}~: . ML. . ; , .

,.,,.c.

.f,3%. y, b.

.I < '..R .x . . , . n ,. ..s..._,,/.,. c.; n . c .y.,g, . .%,..br,m ..

.. m. w.n.m <, n..

q} qrj h.qd.m*'n.

- se , % ,4, a . 8 .# 8~

4 . . ms. . . s ,e . . . .. .w :. w.t . .c a

,. .s y.u,4.g.t ,e ( , y.g .. e.sh .vr;,. l

  • t t . ,

r, c..'. g pg4.

)

4 '$4 (4 3q*pm, 3c. w .u,y,QJ

,,4 . f M. m y v ; y;: y e rg pg

..A r;w  :~9f. v q e w.sawp,r . ( , g, p

.a.m.s.;.;,,MfGi,g,.,$.,,

2..,',..? tys s v .%

.,t.Yn m: ge w n.p p. @ cutpu,b;f..y44 @t<,.o Xsa t

. . m.%

. ... % g.> g g., y %m.%%,._iry.vg% pQ ,2.y.aapg&n,.

mm e9,y!urp fu..%. r. .c

  • g w.*A i y,u.;..ofe y,gge gpcypga,cpwyggy.u,, .< : g

.....-it .A t . %e ,w. swint"). y, w vA, A p w.-f.g w pJ ..f yst,

'.Q. '.:V 4 *.N. ** irs $U!& :,W.',,Q')*a;:M M W .GtK:'fq W , %,y'rpWI,2'1, "' .stcCC:f.iNgMid%&.G;:
  1. m ,... m q ? wy, yyeqw n y a n. wwgj.

~ k N h,"' M .U}tf41'. h: g# M.h. w whbhh.

w.<a c . w w nr

~h h M- . *;-}~$NhD9'$;m:pr. "k' MM MBN awa i

~

mm_wmm_ W ll N. w -@ m e m$$$9sM

p

\

SPR SCREENING SHEET SPR NUMBER 74lY bD l

YES NO CRITERIA

[ ] [K ] Is the problem described in the SPR needed to comply with the STP I Technical Specifications or other license commitments?

[ ] [g ] Do the consequences of not correcting the problem affect the ability of a l safety system to satisfy its design function?  !

[ ] [K] Do the consequences of not correcting the problem create or could create a condition thatjeopardizes the safe or reliable operation of the Units?  !

[ ] [ () Do the consequences of not correcting the problem create or have the potential to create a condition that will or could affect the station's ability ]

to effectively support unit operatio6 or mitigate emergency situations? I

[ ] [g] Does the problem described in the SPR impact the reliability of the I system to perform its design function?

[ ] Is the problem described in the SPR considered to be a mode restraint?

[K]

(Which mode - 1[ ], 2[ ], 3[ ], 4[ ], 5[ ])

If the answer to any of the above criteria is "YES," the problem described in the SPR needs to be corrected prior to mode change or unit start-up, unless justification for deferral is provided.

COGNIZANT DEPT. #f,fI_./C; OPERATIONS -

3 -

CAG DATABASE UPDATED M DATE 7N i

l l

' '. i ,

, Rev. 1

, April 16, 1993 i PORC Review Evaluation

' ~

sPR '14 l 'l L'~D Subject Does the subject SPR meet any of the following criteria:

37Ji H2

1) concerns a REPORTABLE EVENT? V
2) concerns a sianificant operating abnormality or sianificant deviation ,

. from normal and expected performance of plant equipment or systems that affect _b(,

nuclear safety?

3) Concerns unanticipated deficiencies in the desian or operation of structures, systems, or components that affect _k(

nuclear safety?

I

4)
  • concerns any accidental, unplanned, or uncontrolled radioactive release?
5) concerns the violation of: ,

+ codes

+ Regulations  ;

  • Orders a Technical Specifications Operating Licensing Requirements  !

having nuclear safety significance?  !

6) Concern the abnormal degradation of  !

systems designed to contain radioactive material?

If any of the above questions are answered YES, THEN the subject SPR SHALL be submitt d to PORC.

W-

[Eva'1uator

~ m s'N94 Date '

An SPR that concerns uncontrolled radioactive release requires review and approval by the Plant Manager.

l

!