Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076K283 + (ML20076K283)
- A03074, Forwards Program Description & Schedule for Resolving NUREG-0737,Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Program Completion Scheduled for End of 1983.Results of Analysis & Training Dates Will Be Communicated by 831231 + (ML20076K287)
- RBG-15-377, Interim Deficiency Rept DR-96 Re Linear Indications Found in Bergen-Patterson Tube Steel.Initially Reported on 830217. Ae Awaiting Addl Info from Vendor.Next Rept Will Be Submitted by 830826 + (ML20076K290)
- ML20076K292 + (ML20076K292)
- ML20076K304 + (ML20076K304)
- ML20076K310 + (ML20076K310)
- ML20076K311 + (ML20076K311)
- ML20076K318 + (ML20076K318)
- ML20076K321 + (ML20076K321)
- ML20076K323 + (ML20076K323)
- 2CAN109404, Forwards Proprietary & non-proprietary, Amend 12 to ANO-2 Updated Safety Analysis Rept. Proprietary Portion Withheld + (ML20076K324)
- ML20076K325 + (ML20076K325)
- ML20076K326 + (ML20076K326)
- 1CAN078301, Requests Extension Until Aug 1983 for Submittal of Plans & Schedules for Resolution of Reactor Coolant Pump Trip Issue.Delay Caused by Late Submittal of B&W Owners Group Plan + (ML20076K337)
- RBG-15-351, Interim Deficiency Rept DR-114 Re Weld Defects in Radial Rebar Anchor Ring for Shield Bldg Roof.Initially Reported on 830419.Util Awaiting Addl Info from Ae.Next Rept Will Be Submitted by 830726 + (ML20076K340)
- ML20076K343 + (ML20076K343)
- ML20076K346 + (ML20076K346)
- ML20076K354 + (ML20076K354)
- ML20076K361 + (ML20076K361)
- ML20076K364 + (ML20076K364)
- ML20076K367 + (ML20076K367)
- ML20076K368 + (ML20076K368)
- ML20076K373 + (ML20076K373)
- ML20076K376 + (ML20076K376)
- ML20076K383 + (ML20076K383)
- ML20076K386 + (ML20076K386)
- ML20076K388 + (ML20076K388)
- ML20076K390 + (ML20076K390)
- ML20076K401 + (ML20076K401)
- ML20076K403 + (ML20076K403)
- ML20076K405 + (ML20076K405)
- ML20076K406 + (ML20076K406)
- ML20076K410 + (ML20076K410)
- ML20076K413 + (ML20076K413)
- ML20076K414 + (ML20076K414)
- ML20076K417 + (ML20076K417)
- ML20076K451 + (ML20076K451)
- 05000482/LER-1994-012, :on 940925,failure to Correctly Calibr Refueling Machine Load Monitor Occurred.Caused by Inadequate Procedure Controlling Calibr,Setup & Checkout of Refuel Machine Load Monitor.Procedure Revised + (ML20076K455)
- ML20076K465 + (ML20076K465)
- ML20076K471 + (ML20076K471)
- ML20076K474 + (ML20076K474)
- ML20076K479 + (ML20076K479)
- ML20076K480 + (ML20076K480)
- ML20076K483 + (ML20076K483)
- 05000498/LER-1994-016, :on 940923,failure to Fully Meet Requirements of TS Due to Not Placing CR Envelope HVAC Sys in Required Mode.Toxic Gas Analyzers Repaired & Mod Implemented + (ML20076K488)
- PY-CEI-NRR-1879, Informs That Info Requested by GL 94-04, Voluntary Reporting of Addl Occupational Radiation Exposure Data, Has Been Voluntarily Supplied to NRC in + (ML20076K490)
- BECO-LTR-94-115, Forwards Anticipated Operator Licensing Exam Schedule for FY95-98 as Requested by Administrative Ltr 94-12 + (ML20076K494)
- ML20076K496 + (ML20076K496)
- 05000293/LER-1994-006, :on 940917,unplanned Actuation of Portion of Channel B Core Standby Cooling Sys Logic Circuitry Occurred.Caused by Inadequate Plant Impact Reviews for Activity Performed.Procedure Revised + (ML20076K498)
- ML20076K502 + (ML20076K502)
- ML20076K507 + (ML20076K507)