Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073S796 + (ML20073S796)
- ML20073S797 + (ML20073S797)
- ML20073S799 + (ML20073S799)
- 05000364/LER-1983-019-03, /03L-0:on 830404 & 19,rod Control Sys Declared Inoperable Upon Receipt of Failure Alarm on Power Cabinet 2AC.Following Second Occurrence,Phase Control Card B2 Replaced + (ML20073S800)
- B14788, Application for Amend to License DPR-65,revising TS Re ESFAS Instrumentaion + (ML20073S803)
- ML20073S805 + (ML20073S805)
- ML20073S809 + (ML20073S809)
- ML20073S810 + (ML20073S810)
- ML20073S811 + (ML20073S811)
- 05000373/LER-1994-009-04, :on 940603,high Suction Flow Isolation Was Received Shortly After Starting 1B RHR Pump,Isolating SDC System Due to Procedural Deficiencies.Tailgate Sessions to Be Held & Equipment Revised + (ML20073S815)
- ML20073S816 + (ML20073S816)
- ML20073S817 + (ML20073S817)
- ML20073S821 + (ML20073S821)
- LIC-94-0136, Revises C/A Noted in & Clarifies Relationship to C/A Noted in in Response to Violation Re Personnel Entering RCA W/O Proper Dosimetry.Revised Design & New Schedule for Upgrading RCA Access Process Developed + (ML20073S823)
- ML20073S824 + (ML20073S824)
- ML20073S825 + (ML20073S825)
- ML20073S828 + (ML20073S828)
- ML20073S829 + (ML20073S829)
- ML20073S835 + (ML20073S835)
- ML20073S836 + (ML20073S836)
- ML20073S837 + (ML20073S837)
- ML20073S840 + (ML20073S840)
- ML20073S842 + (ML20073S842)
- ML20073S846 + (ML20073S846)
- ML20073S849 + (ML20073S849)
- ML20073S852 + (ML20073S852)
- 05000454/LER-1992-004-01, :on 920701,station Received Operability assessment,ENC-QE-40.1,regarding Bdps Due to Inadequate Safety Analysis & Subsequent Review for Bdps.Special Operating Order Was Revised + (ML20073S855)
- ML20073S858 + (ML20073S858)
- ML20073S859 + (ML20073S859)
- ML20073S864 + (ML20073S864)
- ML20073S867 + (ML20073S867)
- ML20073S877 + (ML20073S877)
- ML20073S878 + (ML20073S878)
- ML20073S879 + (ML20073S879)
- ML20073S880 + (ML20073S880)
- ML20073S881 + (ML20073S881)
- ML20073S882 + (ML20073S882)
- ML20073S888 + (ML20073S888)
- ML20073S896 + (ML20073S896)
- ML20073S913 + (ML20073S913)
- L-83-274, Final Deficiency Rept Re Loss of Continuity on Mineral Insulated Cable Assemblies.Initially Reported on 830330. Twenty-three Cable Assemblies W/Defective Connectors Repaired.Deficiencies Not Reportable Per 10CFR50.55(e) + (ML20073S917)
- ML20073S928 + (ML20073S928)
- ML20073S930 + (ML20073S930)
- ML20073S941 + (ML20073S941)
- NRC-94-4184, Forwards Responses to NRC RAIs on AP600 from NRC 940316, 0419,29,0502,11,12,23 & 26 Ltrs.Revs of Responses Previously Submitted Also Provided,Completing Responses for NRC + (ML20073S946)
- ML20073S947 + (ML20073S947)
- ML20073S954 + (ML20073S954)
- ML20073S961 + (ML20073S961)
- 05000219/LER-1994-007, :on 940531,reactor Scram Occurred Due to Modification Work in Switchyard.Placing Modification on Hold Pending Engineering Review & Strengthening Procedural Controls Over Switchyard Work + (ML20073S963)
- ML20073S966 + (ML20073S966)
- ML20073S968 + (ML20073S968)