- ML20073E707 + (ML20073E707)
- NG-94-3144, Forwards Basis for Revised Schedule for Exams on Valve Body & Revised Request for Relief RR-002,rev 2 + (ML20073E708)
- ML20073E713 + (ML20073E713)
- ML20073E714 + (ML20073E714)
- ML20073E716 + (ML20073E716)
- ML20073E718 + (ML20073E718)
- ML20073E720 + (ML20073E720)
- ML20073E721 + (ML20073E721)
- ML20073E722 + (ML20073E722)
- ML20073E727 + (ML20073E727)
- ML20073E730 + (ML20073E730)
- ML20073E732 + (ML20073E732)
- ML20073E733 + (ML20073E733)
- 05000368/LER-1994-003-03, :on 940824,discovered That Surveillance Testing of CEA Position Indication Not Performed as Required by TS Due to Personnel Error Associated W/Computer Software Change.Pms Software Revised + (ML20073E742)
- ML20073E743 + (ML20073E743)
- ML20073E744 + (ML20073E744)
- ML20073E747 + (ML20073E747)
- ML20073E752 + (ML20073E752)
- ML20073E754 + (ML20073E754)
- ML20073E758 + (ML20073E758)
- ML20073E770 + (ML20073E770)
- ML20073E787 + (ML20073E787)
- HL-4696, Forwards Response to NRC 940915 RAI on Ehnp Unit 1 Core Shroud Stabilizer Design Submitted for NRC Review of 940902. Results of Final Stress Analysis & Summary of Dynamic Testing Previously Performed for GE by Hitachi Also Encl + (ML20073E792)
- ML20073E794 + (ML20073E794)
- ML20073E795 + (ML20073E795)
- ML20073E797 + (ML20073E797)
- ML20073E799 + (ML20073E799)
- ML20073E809 + (ML20073E809)
- ML20073E810 + (ML20073E810)
- ML20073E815 + (ML20073E815)
- TXX-9108, Rev 4 to Technical Requirements Manual + (ML20073E817)
- ML20073E828 + (ML20073E828)
- ML20073E832 + (ML20073E832)
- ML20073E835 + (ML20073E835)
- 05000254/LER-1994-010-05, :on 940808,when Attempting to start-B-train CR Air Conditioning,Compressor Repeatedly Tripped on High Pressure Due to Plugged Svc Water Strainers.Flow Indicator Repaired & Procedure Qcop 5750-9 Changed + (ML20073E839)
- ML20073E851 + (ML20073E851)
- 05000499/LER-1993-006, :on 930217,TS Violated Due to Train a Cold Leg Injection MOV Being Inoperable for Greaterthan 72 H.Adequacy of Programmatic Controls Re Operability Determination Evaluated & Enhancements Made + (ML20073E862)
- 05000259/LER-1994-002-03, :on 940428,GE Akr Circuit Breakers Failed Trip Time Tests Due to Different Testing Equipment Used by TVA & GE for Breaker Testing.Akr Breakers Returned to GE for Addl Rework & Retest + (ML20073E878)
- ML20073E880 + (ML20073E880)
- ML20073E887 + (ML20073E887)
- 05000259/LER-1994-003-03, :on 940713,defect Discovered in Pressure Rating for Air Conditioning Units (Acu) Supplied by Ellis & Watts. on 940823,determination Made That Event Reportable Per 10CFR21.All Acus Will Be Reworked + (ML20073E895)
- PY-CEI-NRR-1352, Forwards Rev 15 to Security Plan.Rev Withheld (Ref 10CFR73.21) + (ML20073E896)
- 05000445/LER-1991-013, :on 910328,loss of Offsite Power Occurred. Caused by Grounded Transmission Line Due to Accumulation of Bird Droppings on Insulators.Increased Attention Given to Need for Cleaning + (ML20073E898)
- ML20073E901 + (ML20073E901)
- ML20073E907 + (ML20073E907)
- ML20073E912 + (ML20073E912)
- 3F0491-05, Describes Change to Estimated Emergency Feedwater Quantity & Time Necessary to Complete Natural Circulation Cooldown at Facility.Cooldown Expected to Use 735,000 Gallons of Water & Will Take 150 H Using Conservative Licensing Assumptions + (ML20073E913)
- ML20073E917 + (ML20073E917)
- ML20073E922 + (ML20073E922)
- ML20073E926 + (ML20073E926)
- ML20073E931 + (ML20073E931)