OPERATING DATA REPORT DOCKET NO. 50-293 ,

DATE 03/09/83  !

COMPLETED BY G.G. Whitney TELEPHONE 1-617-746-7900 OPERATING STATUS Pilgrim 1 Notes

1. Unit Name:
2. Reporting Period: February, 1983 1998-
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 678.

655.

5. Design Electrical Rating (Net MWe): ,
6. Maximum Dependable Capacity (Gross MWe): 690.
7. Maximum Dependable Capacity (Net MWe): 670.
8. If Changes Occur in Capacity Ratings (Items Number-3 Through 7) Since Last Report. Give Reasons:

None

9. Power Level To Which Restricted. If Any (Net MWe): Nonc
10. Reasons For Restrictions. If Any: N/A This Month Yr..to Date Cumulative
11. Hours in Reporting Period 672.0 1416.0 89616.0
12. Number Of Hours Reactor Was Critical 630.9 1374.9 63320.2 0.0 0.0 0,0
13. React <'r Reserve Shutdown Hours

. 623.u 136/.6 61a t .u

14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1208208.0 2657280.0 105370872.0 .
17. Gross Electrical Energy Generated (MWH) 421080.0 , _ ,

928710.0 35255534.0

18. Net Electrical Energy Generated (MWH) 405181.0 893777.0 33875288.0 92.8 96.6 66.J
19. Unit Service Factor
20. Unit Availability Factor 92.8 96.6 68.3
21. Unit Capacity Factor (Using MDC Net) - 90.0 94.2 56.4
22. Unit Capacity Factor (Using DER Net) 92.1 96.4 57.7
23. Unit Forced Outage Rate 7.2 3.4 9.6
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each1:

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: Unit Operating ,
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIA L CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ----

8304150297 830311 PDR ADOCK 05000293 PDR R gof773

AVERAGE DAILY UNIT POWER LEVIL DOCKET NO. 50-293 Pilgrim 1 DATE 03/09/83

' C*U* "*Y COMPLETED BY

- TELEPHONE I-617-746-7900 I

MONDI February, 1983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe Net) 1 667. g7 663 2 667. 13' 665 ,

3 667. g, 666 4

666. -

630 649. 667 3 73 666. , 665 6 _

- 666. 3 667 666. 24 666

  • 3 9 667- 25 666 10 666. 26 666 g3 666. 7 664 g, 639. , 664 3

13 29 0 0 0 -

14 30 348 0 15 31 16 625 INSTRUCT 10NS .

On :h:s format. list the average dany unit power level in MWe. Net for each v.sy in the reporung month. Campute to the nearest whole mepwatt.

. t o /-~ )

, - . -.- , _ _ m-.-r , ., . - . .

_ . _ - - _ _. . - . _ _ - - - _ - _ _ - . . . - _ - ._ ~-

DOCKET NO.

50-293 .

UNIT SilUIDOWNS AND P()WER REDUCil0NS Pilgrim 1 UNIT NAME DATE uJ/uw; COMrl.ETED RY G.G. Whitney REPORT IONill February, 1983 TELErilONE l-617-746-7900 "E -

, .!E 3g .}g5 Yh Licensee E **

55 L Cause A Conrective k"lo No. Dale g gg Event Action to

' " c$ 6 5 j di y Repin # A0 p,,,,,,g,c,,,,,c, 6

2 83/02/13 F 48.2 H 3 83-007/03L EA ZZZZZZ Scram due to load reject from salt build up on insulators in switchyard.

i t

l

't

\.

I 2 3 4 F: Fenced Reason: Methoil: Exhible G Instructisms S: Scheduled A Erguipment Failure (Explain) 1-Manuel for Prepsiaihm of Dasm

. B Maintenance of Test 2-Manusi Scrsm. Entry Sheels for I.icensee
4 C Refueling 3 Automatic Sceam. Event Regunt (LER) File INUREG .

! , D Regulatiny Resicletion 4 Other (Explain) 0161)

E Operalor Training & License Examinallem F.Adudnistrative 5 G-Operstitmal Eeror (Esplain) Exhibit I - Same Source

'i 19/77) Il-Othes (Explain) ,

li

. ~ , . . ,. .- ----.~ . . . - - .:

11 BOSTON EDISON COMPANY PILCRIM NUCLEAR POWER STATION l l

{ Summary of Operations for Februar,y, 1983 1 i The month began with the unit operating at 100% reactor power. The "A" TBCCW f

heat exchanger was out of service to repair leaking tubes. It was returned to j service 2/3/83. On 2/5/83 while performing control rod exercise, control rod

) 22-39 inserted to position 16. Reactor power was reduced to 65% to withdraw l ,

the rod and returned to 100% power. On 2/7/83 "B" TBCCW heat exchanger was removed from service to repair leaks. On 2/12/83 "A" standby gas treatment system was declared inoperable to replace charcoal in the filters. The reactor scrammed on 2/13/83 due to load reject at 0)39. At 1025, a loss of offsite i

] power due to salt buildup in the switchyard occured from a Northeast storm. "A" i

i standby gas treatment system filter was declared operable 2/16/83. The reactor 1

was brought critical at 1745 on 2/14/83 and synchronized onto the grid at 0047 4

on 2/15/83.

1 i

100% power was achieved on 2/17/83.

on 2/20/83 while exercising control rods, rod 18-31 inserted to position 26.

Power was reduced to 65%, the rod was withdrawn and the unit returned to 100%

i reactor power. On 2/24/83 "B" standby gas treatment was declared inoperable i

J due to solenoid valve on sprinkler system leaking causing charcoal to become 1

wet. "B" SBGT was returned to es rvice 2/28/83.

I i

i Safety / Relief Valve Challenges for the month of February, 1983 There were no challenges to relief valves during February.

4 i

- ~ - - - _ .

g e-w ----nm> -- -,wg . --wp-- - , c , -

- -, -wr

e REFUELING INFORMATION The following refueling information is included in the Monthly Report as requested in a letter to Mr. G. C. Andognini dated January 18, 1978:

For your convenience, the inforumtion supplied has been enumerated so that each number corresponds to equivalent notation utilized in the request.

1. The name of this facility is Pilgrim Nuc1 car Power Station, Docket Number 50-29 3.
2. Scheduled date for next Refueling Shutdown: September, 1983
3. Scheduled date for restart following refueling: November, 1983 4.
5. Due to their similarity, requests 4, 5, & 6 are responded to collectively:
6. The fuel, which had been loaded during the 1981 scheduled refueling outage, is of the same P8x8R design, as loaded the previous outage con-sisting of 112 P8DRB282 assemblies and 60 P8DRB265 assemblies.
7. (a) There are 580 fuel assemblies in the core.

(b) There are 936 fuel assemblies in the spent fuel pool.

8. (a) The station is presently licensed to store 2320 spent fuel assemblies. ,

The actual spent fuel storage capacity is 1770 fuel assemblies at

]

present.

(b) The planned spent fuel storage capacity is 2320 fuel assemblies.

9. With present spent fuel in storage, the spent fuel pool now has the capacity to accommodate an additional 834 fuel assemblies.

l 9

PILCRIM NUCLEAR POWER STATION Month February, 1983' MAJOR SAFETY RELATED MAINTENANCE .

CORRECTIVE ACTION MALFUNCTION CAUSE MAINTENANCE TO PREVENT RECURRENCE ASSOCIATED L.

SYSTEM COMPONENT

?.cactor 1201-2(R/W Cleanup S-2 LT Temp Mod repair Attributed to normal wear NA Water Cleanup 1/B A&B w/n start Switch when available Clean Up Isolation inop valve)  ;

Core MO-1400-4A 2 bolts fell out vibration replaced bolts Isolated case - LER to be issued Spray Core spray A inspected &

injection retorqued all valve bolts Service B,SSW Pump Pump vibration Normal oil change and Rebuild pump, perform motor NA Water wear meggar FM Feedwater 1705-2C MSL Out of calibra- Unknown Recalibrated per None NA Rad monitor S.M1-13

Standby B SBGT Wet charcoal Deluge Replaced all 24 Install valve in proper LER to be issued gas System charcoal filters orientation to correct desigo treatment Failure error j.

Dicsel "A" Diesel Broken Belt Worn Replaced Failure considered normal 83-009/03L-0 G:nerator Gen wear f.

Standby A SBGT Failed Test Age Installed 11 new Procedures adequate to detect 83-006/03L-0 I Gas charcoal filters end of life of filters freatment in first charcoa L bank A train Diezel B Diesel Gen Broken Belt Worn Replaced Failure considered normal 83-009/03L-0 '

Generatoi wear. i N/A Emergency air None N/A Removed from Potential personnel safety N/A l breathing ,

Control Room hazard and. system no longer apparatus required.

s ,

o i e I 0

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _