GPU Nuclear Corporation g3Ml r
One Upper Pond Road J-Mws a
Parsippany. New Jersey 07054 201-316-7000 TE LE X 136-482 Wnter's Direct Dial Number.
i April 24, 1991 5000-91-2040 C321-91-2112 U.
S. Nuclear Regulatory Commission Attentions Document Control Desk Washington, DC 20555 Gentlemen:
Subject Oyster Creek Nuclear Generating Station (OCNGS)
Docket No. 50-219 License No. DPR-16 Core Spray Sparger Inspections Referencet (1) GPUN letter 5000-91-2036/C321-91-2100, dated 4/15/91 (2) GPUN letter 5000-89-1697, dated 1/1.9/89 Topical Report No. 000 which was recently sent for your review described the nondestructive examinations (NDE) that were performed during the 13R outage on the Core Spray Spargers and the associated in-vessel annulus piping.
During a recent conversation with NRC staff, it was identified that a footnote from Table 1 of the report was inadvertently omitted.
This footnote was previously included in our 12R inspection report (Reference 2), and does not change the results (no new indicatione) from our 12R or 13R inspectione.
Please replace Table 1 with the enclosed amended table.
In the event the staff may have any further comments or questions, please contact Mr. Michael Laggart, Manager, Corporate Nuclear Licensing at (201) 316-7968.
Sincerely, j'hk ?f
[ Vice President and Director, J.
C.
DeVine, Jr.
Technical Functions Enclosure 9105010001 91o424
{DR ADOCK 05000219 ph PDR onc3212112 I
\\ \\
p {j i,1 O
GPU Nuclear Corporation is a subsidiay of General Pubhc Utilit es Corporation
l C321-91-2112 PAge 2 I
JCD/DJ/ pip ect Administrator, Region 1 NRC Resident Inspector Oyster Creek NRC Project Manager DJ:C3212112
Topical Report Wo. TR-080 Page 9 of 14 TABLE 1 CORE SPRAY PIFING INSPECTION
SUMMARY
Annulus Pip 1B Sparcers Visual Ultrasonic Visual Ultrasonic Air Test Remarks Air release One Repair Bracket 1978 1 through No indications observed from installed at 208*
wall crack 1 crack (208*)
(Sys II) only Seven Repair 1980 19 indications 16 indications 2 indications Brackets installed caIIed cracks (Sys II) two repair brackets installed (Sys I) 28 Total Indications (excluding 1978 indication) 1282 Video enhanced Video enhanced on 1980 indication Video 1980 visual in-Enhance-dications. Results Results: Not a crack (6 x 5 ments identified:
3 cracks reducer) 2 possible cracks 1983 No indications
- No indications
- No indications No indications Area of Inspection limited (4 of 1980 (5 of 16 - 1980 7 welds indications indications inspected by repair brackets examined) rechecked) 1986 No indications
- No indications
- No indications 1988 No indications
- No indications
- Air release
- Air release observed from two from 196* repair repair brackets bracket intermittent.
Air upper sparger.
release from 208' repair bracket continuous.
0352v
[
Topical Report No. TR-CEO Page 10 of 14
~
f TA M.E 1 - (Continued) l CORE SPRAY PIPING INSPECTION
SUMMARY
I Spargers Annulus Piping visuni
. t?Itrasonic visual Ultrasonic Air Test Remarks t
1991 No indications
- No indications Air release Air release from I
observed from 208' repair bracket one repair continuous.
i bracket (208*)
t trpper sparger.
f I
I l
l I
i I
t 1
I l
i i
J j
i t
i l
Area of inspection limited by repair brackets i
i
- A subsequent air test confir W that air bubbles were released from the sparger nozzles beneath the 196* repair clamp.