Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073D791 + (ML20073D791)
- JPN-91-016, Forwards Application for Amend to License DPR-59,changing Tech Specs to Incorporate Sections 3.11.F & 4.11.F Re Operability Requirements for HVAC Equipment Associated W/ Four Environ Encls Installed in Electrical Load Ctrs + (ML20073D797)
- ML20073D799 + (ML20073D799)
- ML20073D802 + (ML20073D802)
- NLS9100248, Application for Amend to License DPR-46,consisting of Proposed Change 88 to Tech Spec Revising Section 5.2.B to Allow Use of Approved Neutron Absorber Matl in BWR Control Rods & Section 6.5.1.D for Tech Spec Guidelines + (ML20073D808)
- ML20073D812 + (ML20073D812)
- ML20073D814 + (ML20073D814)
- ML20073D823 + (ML20073D823)
- U-601832, Requests That Senior Operator License SOP-20907 for Ks Moore Be Changed to Expired + (ML20073D856)
- ML20073D858 + (ML20073D858)
- ML20073D861 + (ML20073D861)
- BSEP-91-0185, Responds to Violations Noted in Insp Repts 50-324/91-03 & 50-325/91-03.Corrective Actions:Emergency Air Filtration Dampers & Components Properly Labeled & Copper Moisture Drain Lines Replaced & Covered to Prevent Future Damage + (ML20073D863)
- ML20073D867 + (ML20073D867)
- LD-83-031, Forwards Proprietary & Nonproprietary Responses to 830131 Questions Re Core Protection Calculators & Reactor Power Cutback Sys for CESSAR-F.Proprietary Responses Withheld (Ref 10CFR2.790) + (ML20073D871)
- ML20073D876 + (ML20073D876)
- ML20073D877 + (ML20073D877)
- ML20073D879 + (ML20073D879)
- ML20073D886 + (ML20073D886)
- ML20073D888 + (ML20073D888)
- ML20073D893 + (ML20073D893)
- ML20073D898 + (ML20073D898)
- ML20073D907 + (ML20073D907)
- ML20073D909 + (ML20073D909)
- ML20073D910 + (ML20073D910)
- ML20073D911 + (ML20073D911)
- 05000260/LER-1991-005-01, :on 910327,unplanned ESF Actuation Occurred. Caused by Unexpected Failure of Relay Coil.Replacing Relay Coil & Realigning Affected Sys,Work Requests Issued & Replacing GE Type Relays + (ML20073D912)
- ML20073D914 + (ML20073D914)
- ML20073D915 + (ML20073D915)
- ML20073D920 + (ML20073D920)
- ML20073D922 + (ML20073D922)
- 05000374/LER-1991-003-06, :on 910328,reactor Bldg Ventilation Isolation Occurred.Caused by Personnel Error.Personnel Involved Tailgated Operating Crews on Importance of Procedural Adherence + (ML20073D932)
- JAFP-91-0228, Forwards Update of Status of Activities for Emergency Svc Water Sys Per NRC 901009 Request Re 900821 Enforcement Conference.Updated Response to Generic Ltr 89-13 Will Be Provided by 910430 + (ML20073D934)
- ML20073D935 + (ML20073D935)
- ML20073D939 + (ML20073D939)
- 05000298/LER-1991-003, :on 910325,unplanned Actuation of Group IV Isolation Occurred During Testing.Caused by Personnel Error & Procedure Deficiency.Procedure Change Being Processed Providing Improved Direction for Action + (ML20073D941)
- ML20073D942 + (ML20073D942)
- 05000458/LER-1991-005, :on 910322,design Deficiencies in Fire Doors. Discovered.Caused by Design Error.Hourly Fire Watch Established,Fire Doors Inspected & Surveillance Procedure STP-000-3001 Revised + (ML20073D943)
- ML20073D955 + (ML20073D955)
- ML20073D956 + (ML20073D956)
- 05000298/LER-1991-004, :on 910326,unplanned Automatic Startup of Diesel Generator 1 Occurred.Caused by Inadequate Planning & Poor Communications.Shutdown Cooling Restored & Sys Realigned Prior to Configuration + (ML20073D957)
- ML20073D965 + (ML20073D965)
- RBG-40873, Monthly Operating Rept for Aug 1994 for River Bend Station + (ML20073D969)
- ML20073D974 + (ML20073D974)
- ML20073D980 + (ML20073D980)
- GO2-83-178, Forwards Emergency Plan Implementing Procedures,W/Exception of EPIP 13.1.1, Classification of Emergency. EPIP 13.1.1 Will Be Submitted by 830315.W/o Encl + (ML20073D986)
- ML20073D991 + (ML20073D991)
- ML20073D998 + (ML20073D998)
- ML20073E004 + (ML20073E004)
- ML20073E005 + (ML20073E005)
- HL-1586, Responds to NRC Re Violations Noted in Insp Repts 50-321/91-04 & 50-366/91-04.Corrective Actions:Design Change Request 2H91-023 Implemented to Raise Condensate Storage Tank Level Switch Setpoints Approx 22 1/2 Inches + (ML20073E008)
- NLS9100264, Forwards Scope & Objectives for 1991 Emergency Preparedness Exercise Scheduled for 910724-25 + (ML20073E010)