RBG-40873, Monthly Operating Rept for Aug 1994 for River Bend Station
| ML20073D969 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 08/31/1994 |
| From: | James Fisicaro, Glueck D ENTERGY OPERATIONS, INC. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| RBF1-94-0042, RBF1-94-42, RBG-40873, NUDOCS 9409280170 | |
| Download: ML20073D969 (6) | |
Text
_
k
==ENTERGY E"TLfC"'" "*' '""
l PO Box ??O St. riancevale. LA 70776 t
i September 14,1994 U.S. Nuclear Regulatory Commission 3
Document Control Desk M/S PI-37 Washington, D.C. 20555 l
Subject:
River Bend Station - Unit I Docket No. 50-458 Monthly Operating Report File No.-
G9.5, G4.25 RBG-40873 RBF1-94-0042 Gentlemen:
In accordance with River Bend Station (RBS) Technical Specification 6.9.1.6, enclosed is the August 1994 Monthly Operating Report for RBS - Unit 1.
Sincerely,
( awv-> hM
[ames J.
sicaro Director - Nuclear Safety j
JJF/kdg enclosure I
n n.
9409280170 940831 PDR ADOCK 05000458 I\\
R PDR I
August 1994 Monthly Operating Report September 14,1994 RBG-40873 Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 NRC Resident Inspector P.O. Box 1051 St. Francisville, LA 70775 INPO Records Center 1100 Circle 75 Parkway Atlanta, GA 30339 Chester R. Oberg PUCT 7800 Shoal Creek Blvd, Suite 400N Austin, TX 78757 Dottie Sherman American Nuclear Insurers 29 South Main Street West Hardford, CN 06107 Cajun Electric Power Coop, Inc.
l l
i
4 RIVER BEND STATION UNIT 1 REPORT NO.
R-94-08 DATE September 8.1994 COMPLETED BY D. R. Glueck TITLE Senior Ennineer TELEPIIONE 504-381-4317 MONTH Aunust.1994 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER LEVEL POWER LEVEL (MWe-Net)
(MWe-Net) 1.
911 17.
916 2.
910 18, 912 3.
909 19.
900 4.
908 20.
899 5.
905 21.
912 6.
909 22.
911 7.
912 23.
886 8.
914 24.
844 9.
913 25.
798 10, 913 26.
910 11.
913 27.
896 12.
878 28.
912 13.
882 29.
912 14.
912 30.
911 15, 911 31.
911 16, 915
l l
i l
DOCKET NO. 50/458 RIVER BEND STATION UNIT 1 REPORT NO.
R-94-08 DATE Septemher 8.1994 COMPLETED BY D. R. Glueck TITLE Senior Engineer TELEPIIONE 504-381-4317 PAGE I
OF 2 OPERATING STATUS
- 1. REPORTING PERIOD: Aunust 1994 GROSS IIOURS IN REPORTING PERIOD:
744
- 2. CUR 9' NTLY AUTIIORIZED POWER LEVEL (Mwt): 2894 MAX. DEPEND CAPACITY (MWe-Net): 936 DESIGN ELECTRICAL RATING (MWe-Net): 936
- 3. POWER LEVEL TO WIIICII RESTRICTED (IF ANY)(MWe-Net): N/A
- 4. REASONS FOR RESTRICTION (IF ANY): N/A TIIIS YR TO CUMU-MONTII :
DATE LATIVE
- 5. NUMBER OF IIOURS REACTOR WAS CRITICAL 744 4000.3 54.812.2
- 6. REACTOR RESERVE SIIUTDOWN IIOURS 0
0 0
- 7. HOURS GENERATOR ON LINE 744 3871.1 51.852.5
- 8. UNIT RESERVE SIIUTDOWN IIOURS 0
0 0
l l
- 9. GROSS THERMAL ENERGY GENERATED (MWii) 2.127.751 10.949.218 138.648.887
- 10. GROSS ELECTRICAL ENERGY GENERATED (MWII) 717.620 3.705.205 46.868.813 j
- 11. NET ELECTRICAL ENERGY GENERATED (MWII) 670.688 3.469.786 43.859.287
l
)
i DOCKET NO. 50/458 RIVER BEND STATION UNIT I REPORT NO.
R-94-08 DATE Septemher 8.1994 COMPLETED BY D. R. Glueck TITLE Senior Engineer TELEPHONE 504-381-4317 PAGE 2
OF 2
OPERATING STATUS tills YR TO CUMU-MONTH DATE LATIVE
- 12. REACTOR SERVICE FACTOR 100.0 68.6 71.3 13 REACTOR AVAILABILITY FACTOR 100.0 68.6 71.3 1
- 14. UNIT SERVICE FACTOR 100.0 66.4 69.0
- 15. UNIT AVAILABILITY FACTOR 100.0 66.4 69.0 l
- 16. UNIT CAPACITY FACTOR (USING MDC) 96.3 63.6 63.7 l
- 17. UNIT CAPACITY FACTOR (USING DESIGN MWe) 96.3 63.6 63.7
- 18. UNIT FORCED OUTAGE RATE O
O 12.5 i
- 19. SHUTDOWNS SCIIEDULED OVER NEXT SIX MONTIIS (TYPE, DATE, AND DURATION OF EACil):
NO SliUTDOWNS SCHEDULED OVER NEXT SIX MONTIIS l
- 20. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
N/A i
l l
UNIT SIIUTDOWNS AND POWER REDUCTIONS TIME TIME START RECOVER OF FROM DURATION TYPE REASON METHOD CORRECTIVE ACTION /
NO.
DATE OCCURRENCE OCCURRENCE (IIOURS)
NOTE (1)
NOTE (2)
NOTE (3)
COMMENTS None
SUMMARY
NOTE (1)
TYPE OF OCCURRENCE:
ENTER CODE DOCKET NO. 50/453 F:
FORCED RIVER BEND STATION UNIT I S:
SCIEDULED NOTE (2)
REASON FOR OCCURRENCE: ENTER CODE REPORT NO.
R-944X A:
EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
B:
MAINTENANCE OR TEST REPORT MONTil August.1994 C:
REFUELING D:
REGULATORY RESTRICTION E:
OPERATOR TRAINING AND LICENSE EXAMINATION DATE September 8.1994 F:
ADMINISTRATIVE G:
OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)
D. R. Glucck II:
OTIER (EXPLAIN IN CORRECTIVE ACTIONS /CONB1ENTS)
COMPLETED BY NOTE (3)
METilOD OF SIIUTTING DOWN REACTOR OR REDUCING POWER:
ENTER ONE x
$1GNATURE 1.
MANUAL 2.
MANUAL SCRAM 3.
ALTTOMATIC SCRAM Senior Encincer 4.
OTIER (EXPLAIN IN CORRECTIVE ACTION /CONB1ENTS)
TITLE TELEPIlONE: 504-381-4317
- - -