ML20073D914
| ML20073D914 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/19/1991 |
| From: | Horn G NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20073D918 | List: |
| References | |
| NUDOCS 9104290291 | |
| Download: ML20073D914 (2) | |
Text
'
GENERAL OFFICE P.O. DOX 499. COLUMBUS. NEBRASKA 68602-0499 L
Nebraska Public Power District
- %3e'#@i'"'
w_....__-=m__
m_ n=-=mu-w_ _ _ _. m.m. _ _ _
m_.....
a a
April 19, 1991 Attention:
Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Gentlemen *
Subject:
Revisions to Proposed Technical Specifications Pages Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 Referencect 1) Letter, L. G. Kunc1 to USNRC -dated August 31, 1989, i
" Proposed Change
-No.
- 69. to the Cooper. Nuclear Station Technical Specifications, Low-Low Set" 1
- 2) Letter, G.
R.
Horn to USNRC dated ~ July '2,
- 1990,
" Proposed Change No. 81 to Technical Specifications, Deletion.of. Cycle Specific
-~
Parameter Limits" In the above references, the District submitted two proposed amendments to the Cooper Nuclear. Station =(CNS) Facility Operating License for NRC review-and approval.
Subsequent. approved Amendments to the CNS Facility Operating License have revised some of the CNS Technical Specification pages that are contained in the above references.
This letter. provides updated Technical Specification pages for. proposed change Nos. 69 and 81' that incorporate all amendments to the CNS-Facility-Operating License through Amendment 139 issued March 27, 1991.
If there are any questions, please call.
-Si er dy, G
, Horn Nuc ear Power Group Manager
-GRH/gs:dmr 13234 Attachment
= cc : ~ Regional Administrator USNRC: - Region IV Arlington, Texas
- /
NRC Resident Inspector
. Cooper Nuclear Station-
.PDR.9104290291 91o419 ADOCK 05006298 I.
gJ.
-=-_==
=
_ =, _ =,=
AA. Eurt_ Operating Lirnits Report The Core Operating 1.imits Report is the unit-specific document that provides core operating liinits for the current reload cycle. These cycle specific core operating lini t t n
- r. ball be de te rrn ined for each relond cycle in accordance with Specification 6.5.1.G.
Plant opecation within these core operating limits is addressed in individual specifications.
-bC-
.