OPERATING DATA REPORT DOCKET NO.

50-263 DATE 9-1-94 COMPLETED BY H.

H.

Paustian l

TELEPHONE 612/295-5151 OPERATING STATUS

] Notes

]

Monticello

]

]

~

'1.

Unit Name :

2. Reporting period:

August

)

)

3. Licensed Thermal Power (MWt):

1670

]

]

4. Nameplate Rating (Gross MWe):

569

]

]

5. Design Electrical Rating (Net MWe):

545.4

]

]

6. Maximum Dependable Capacity (Gross MWe):

564

]

]

7. Maximum Dependable Capacity (Net MWe):

~~536

]

]

8.~If' Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
11. Hours In Reporting Period 744 5831 203112
12. Number Of Hours Reactor Was Critical 744.0 5669.2 165044.9
13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
14. Hours Generitor On-Line 744.0 5636.3 162237.0
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 1108162 9231924 250496704
17. Gross Electrical Energy Generated (MWH) 367156 3110062 84664725
18. Net Electrical Energy Generated (MWH) 347467 2980596 80999389
19. Unit Service Factor 100.0%

96.7%

79.9%

20. Unit Availability Factor 100.0%

96.7%

79.9%

21. Unit capacity Factor (Using MDC Net) 87.1%

95.4%

74.4%

22. Unit Capacity Factor (Using DER Net) 85.6%

93.7%

73.1%

i

23. Unit Forced Outage Rate 0.0%

3.3%

3.6%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
Refueling Outage - 9/15/94 - 39 days
25. If Shut Down At'End Of Report Period, Estimated Date Of Startup:N/A
26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9409200169 940919 PDR ADOCK 05000263 R

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263 UNIT Monticello DATE 9-1-94

~~

COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 MONTH OF August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 497.

17 465.

2 493.

18 466.

3 490.

19 459.

4 490.

20 458.

5 488.

21 458.

6 488.

22 451.

7 486.

23 454.

8 485.

24 448.

9 484.

25 447.

10 485.

26 445.

11 482.

27 439.

12 481.

28 442.

13 474.

29 438.

14 473.

30 438.

15 470.

31 437.16-468.

INSTRUCTIONS j

on.this format,. list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-263 DATE 9-1-94 COMPLETED BY H.

H.

Paustian TELEPHONE 612/295-5151 MONTH AUG 08-01-94 to Power operation (End-of-cycle coastdown began 7/18/94.)

08-31-94 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.

s -

~

UNIT SIRTfDOUNS AND POWER REDUCTIONS DOCKET NO.

50-263 UNIT NAME l onticello DATE ~ 9-01-94 COMPLETED BY 71. I!. Paustian REPORT M0tml August TELEP110NE [612/295-5151 ~~.

Duration Reason Method LER System Comp.

Cause & Corrective Ty(pe (hours)

(2) of No.

Code Code Action to No.

Date 1)

Shutdown (4)

(5)

Prevent Recurrence (3)

None i

1 2

3 4

F: Forced Reason:

Method:

Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)

B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5

D-Regulator Restriction 4-Other (Explain)

IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative C-Operational Error (Explain)

Il-Other (Explain)

..