ML20073D965
| ML20073D965 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 08/31/1994 |
| From: | Paustian H NORTHERN STATES POWER CO. |
| To: | |
| Shared Package | |
| ML20073D959 | List: |
| References | |
| NUDOCS 9409280168 | |
| Download: ML20073D965 (4) | |
Text
~
OPERATING DATA REPORT DOCKET NO.
50-263 DATE 9-1-94 COMPLETED BY H.
H.
Paustian l
TELEPHONE 612/295-5151 OPERATING STATUS
] Notes
]
Monticello
]
]
~
'1.
Unit Name :
- 2. Reporting period:
August
)
)
- 3. Licensed Thermal Power (MWt):
1670
]
]
- 4. Nameplate Rating (Gross MWe):
569
]
]
- 5. Design Electrical Rating (Net MWe):
545.4
]
]
- 6. Maximum Dependable Capacity (Gross MWe):
564
]
]
- 7. Maximum Dependable Capacity (Net MWe):
~~536
]
]
8.~If' Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
N/A
- 10. Reasons For Restrictions, If Any: __N/A THIS MONTH YR.-TO-DATE CUMULATIVE
- 11. Hours In Reporting Period 744 5831 203112
- 12. Number Of Hours Reactor Was Critical 744.0 5669.2 165044.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 940.7
- 14. Hours Generitor On-Line 744.0 5636.3 162237.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1108162 9231924 250496704
- 17. Gross Electrical Energy Generated (MWH) 367156 3110062 84664725
- 18. Net Electrical Energy Generated (MWH) 347467 2980596 80999389
- 19. Unit Service Factor 100.0%
96.7%
79.9%
- 20. Unit Availability Factor 100.0%
96.7%
79.9%
- 21. Unit capacity Factor (Using MDC Net) 87.1%
95.4%
74.4%
- 22. Unit Capacity Factor (Using DER Net) 85.6%
93.7%
73.1%
i
- 23. Unit Forced Outage Rate 0.0%
3.3%
3.6%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- Refueling Outage - 9/15/94 - 39 days
- 25. If Shut Down At'End Of Report Period, Estimated Date Of Startup:N/A
- 26. Units In Test Status (Prior to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9409200169 940919 PDR ADOCK 05000263 R
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263 UNIT Monticello DATE 9-1-94
~~
COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 MONTH OF August DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 497.
17 465.
2 493.
18 466.
3 490.
19 459.
4 490.
20 458.
5 488.
21 458.
6 488.
22 451.
7 486.
23 454.
8 485.
24 448.
9 484.
25 447.
10 485.
26 445.
11 482.
27 439.
12 481.
28 442.
13 474.
29 438.
14 473.
30 438.
15 470.
31 437.16-468.
INSTRUCTIONS j
on.this format,. list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
l
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-263 DATE 9-1-94 COMPLETED BY H.
H.
Paustian TELEPHONE 612/295-5151 MONTH AUG 08-01-94 to Power operation (End-of-cycle coastdown began 7/18/94.)
08-31-94 Note: Power operation defined as essentially 100% of rated power except for weekend load drops for specified surveillance testing.
s -
~
UNIT SIRTfDOUNS AND POWER REDUCTIONS DOCKET NO.
50-263 UNIT NAME l onticello DATE ~ 9-01-94 COMPLETED BY 71. I!. Paustian REPORT M0tml August TELEP110NE [612/295-5151 ~~.
Duration Reason Method LER System Comp.
Cause & Corrective Ty(pe (hours)
(2) of No.
Code Code Action to No.
Date 1)
Shutdown (4)
(5)
Prevent Recurrence (3)
None i
1 2
3 4
F: Forced Reason:
Method:
Draft IEEE Standard S: Scheduled A-Equipment Failure (Explain) 1-Manual 805-1984(P805-D5)
B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram 5
D-Regulator Restriction 4-Other (Explain)
IEEE Standard 803A-1983 E-Operator Training & License Examination F-Administrative C-Operational Error (Explain)
Il-Other (Explain)
..