ML20073D935
| ML20073D935 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 09/22/1994 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Northeast Nuclear Energy Co (NNECO) |
| Shared Package | |
| ML20073D937 | List: |
| References | |
| NPF-49-A-095 NUDOCS 9409280157 | |
| Download: ML20073D935 (4) | |
Text
_.
ja Mao
'o
- g UNITED STATES y-NUCLEAR REGULATORY COMMISSION f
WASHINGTON, D.C. 2055!N)D01
\\
/
4 NORTHEAST NUCLEAR ENERGY COMPANY. ET AL.
l DOCKET NO. 50-423 MILLSTONE NUCLEAR POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
95 i
License No. NPF 49 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee), dated April 18, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have be'en satisfied.
1 i
l l
9409280157 940922 PDR ADOCK 05000423 P
PDR j
l
, 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-49 is hereby amended to read as follows:
(2) Technical Soecifications The Technical Specifications contained in Appendix A, as revised through Amendment No.
95
, and the Environmental Protection Plan contained in Appendix B, both of which are attached hereto are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of the date of its issuance, to be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION k
~
John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: September 22, 1994
ATTACHMENT TO LICENSE AMENDMENT N0. 95 FACILITY OPERATING LICENSE N0. NPF-49 DOCKET N0. 50-423 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by amendment number and contains a vertical line indicating the area of change.
Remove Insert 3/4 7-44 3/4 7-44
e
~
PL$NT5'YSTEMS 3/4.7.14 AREA TEMPERATURE MONITORING LIMITING CONDITION FOR OPERATION 3.7.14 The temperature limit of each area shown in Table 3.7-6 shall not be exceeded.
APPLICABILITY:
Whenever the equipment in an affected area is required to be OPERABLE.
ACTION:
With one or more areas exceeding the temperature limit (s) shown in Table 3.7-6:
a.
By less than 20'F and for less than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, record the cumulative time and the amount by which the temperature in the affected area (s) exceeded the limit (s).
b.
By less than 20*F and for more than 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, prepare and submit to the Commission within 30 days, pursuant to Specification 6.9.2, a Special Report that provides a record of the cumulative time and the amount by which the temperature in the affected area (s) exceeded the limit (s) and an analysis to demonstrate the continued OPERABILITY. of the affected equipment.
The provisions of Specification 3.0.3 are not applicable.
4 c.
With one or more areas exceeding the temperature limit (s) shown in Table 3.7-6 by more than 20*F, prepare and submit a Special Report as required by ACTION b. above and within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> either restore the area (s) to within the temperature limit (s) or declare the equip-1 ment in the affected area (s) inoperable.
ciavr11i auer nrnntarurm 4.7.14 The temperature in each of the areas shown in Table 3.7-6 shall be determined to be within its limits-i a.
At least once per seven days when the alarm is OPERABLE, and; j
b.
At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> when the alarm is inoperable.
NILLSTONE - UNIT 3 3/47-44 Amendment No. J7, 95 0171.
-