MONTHYEARML20217F1951999-10-0707 October 1999 Application for Amend to License NPF-29,to Revise Licensing Basis to Credit One of Insights/Conclusions of NUREG-1465, Revised Source Term Insights ML20211E7061999-08-20020 August 1999 Application for Amend to License NPF-29,incorporating Many of Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0791999-06-29029 June 1999 Suppl to 980720 Application for Amend to License NPF-29, Implementing BWROG Enhanced Option I-A,reactor Stability long-term Solution.Rev to TS 3.4.1 Inadvertently Omitted from Original Application ML20196G6901999-06-23023 June 1999 Application for Amend to License NPF-29,revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5241999-05-0606 May 1999 Application for Amend to License NPF-29,changing TSs Required to Support Ggns,Cycle 11 Operation,Including Slmcpr.Portions of Encl Re Addl Info on Calculated Cycle Specific SL MCPR for Plant Cycle 11 Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 ML20236T1551998-07-20020 July 1998 Application for Amend to License NPF-29,revising TSs Re BWROG Enhanced Option I-A Reactor Stability Long Term Solution ML20198J3451998-01-0909 January 1998 Revised Application for Amend to License NPF-29,providing Clarifications to Amend & Adding Restriction to Allowed Interval Extensions Re Option B of 10CFR50,app J ML20198N3851997-10-28028 October 1997 Application for Amend to License NPF-29,revising TS to Implement Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20210V5461997-09-18018 September 1997 Application for Amend to License NPF-29,reflecting Decrease of Two Recirculation Loop SLMCPR to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12.Proprietary Info Re SLMCPR for Cycle 10,encl.Proprietary Info Withheld ML20134E1191996-10-22022 October 1996 Application for Amend to License NPF-29,revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Pressure, Curves Using Methodology of Reg Guide 1.99,Rev 2, Radiation Embrittlement.. ML20117P4421996-09-19019 September 1996 Application for Amend to License NPF-29,changing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117G6661996-08-27027 August 1996 Application for Amend to License NPF-29,modifying Tech Specs Surveillance Requirements for Safety/Relief Valves ML20116F0141996-07-31031 July 1996 Rev 1 to Application for Amend to License NPF-29,revising TSs Required to Support Cycle 9,reload 8.Rev 1 to J11-02863SLMCPR, GGNS Cycle 9 Safety Limit MCPR Analysis Encl.Rept Withheld ML20113B7341996-06-20020 June 1996 Application for Amend to License NPF-29,redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks ML20117F4541996-05-0909 May 1996 Application for Amend to License NPF-29,modifying SRV Surveillance Test for Relief Mode of Operation ML20117D6901996-05-0909 May 1996 Application for Amend to License NPF-29,revising TSs to Support Unit 1,cycle 9 Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits ML20111B2631996-05-0808 May 1996 Application for Amend to License NPF-29,placing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3551996-05-0606 May 1996 Application for Amend to License NPF-29,changing Name from Mississippi Power & Light to Entergy Mississippi,Inc ML20107E2521996-04-18018 April 1996 Application for Amend to License NPF-29,prohibiting Performance of 24-h EDG Maint Run While Unit in Either Mode 1/2 RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells ML20100J8311996-02-22022 February 1996 Application for Amend to License NPF-29,modifying Safety Setpoint to Tolerance Requirements for Safety/Relief Valves ML20097C3491996-02-0101 February 1996 Application for Amend to License NPF-29,revising TS Bases to Include Changes Since 950221 Approval of TS Bases RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage ML20087B5031995-08-0101 August 1995 Application for Amend to License NPF-29,by Revising TS Assoc W/Various ESF Sys Following Design Fuel Handling Accident ML20086N2071995-07-21021 July 1995 Application for Amend to License NPF-29,proposing to Recapture Approx 2 1/2 Yrs of Low/No Power Operation by Extending 40-yr Operating License Term from 220616 to 241101 ML20078S4891995-02-14014 February 1995 Application for Amend to License NPF-29 Consisting of Changes to TS Requirements 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6481995-02-10010 February 1995 Application for Amend to License NPF-29,consisting of Mod to Proposed Amend to OL (PCOL-93/13),requesting to Perform Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4431994-11-0909 November 1994 Application for Amend to License NPF-29,revising TS Associated W/Various ESF Sys Following Design Basis Fuel Handling accident.Mark-up of Current Ts,Proposed TS & mark- Up Improved TS Encl ML20076F9781994-10-12012 October 1994 Application for Amend to License NPF-29,consisting of PCOL-94/01,closing & Deleting License Condition 2.C.(26) for Turbine Disc integrity.Mark-up of Affected OL Page & Proprietary Supporting Info Encl.Proprietary Info Withheld ML20069P4401994-06-17017 June 1994 Proposed Amend to OL (PCOL-94/02),removing License Conditions for EDGs Associated w/NUREG-1216 ML20059H6011994-01-13013 January 1994 Application for Amend to License NPF-29,consisting of Proposed Amend to OL PCOL-93/15,removing 2,324 Spent Fuel Pool Storage Limit & Allowing Full Use of Spent Fuel Storage Spaces ML20059A4801993-10-22022 October 1993 Application for Amend to License NPF-29,modifying Testing Frequencies for Drywell Bypass Test & Airlock Tests ML20059B0131993-10-15015 October 1993 Application for Amend to License NPF-29,converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20056E2861993-08-17017 August 1993 Application for Amend to License NPF-29,proposing Changes to Amend TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Loose Part Detection Instrumentation to Administrative Controls ML20056D5321993-08-11011 August 1993 Proposed Change to OL (PCOL-93/09) to License NPF-29, Amending TS Section 3/4.3.7.5 by Relocating Certain Accident Monitoring Instrumentation from TS to Administrative Control,Per NUREG-1434,Rev 0,w/respect to RG 1.97 ML20046D2041993-08-11011 August 1993 Proposed Change to OL (PCOL-93/07) to License NPF-29, Amending TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Locating Loose Part Detection Instrumentation from TS to Administrative Controls,Per NUREG-1434,Rev 0 ML20046D1911993-08-11011 August 1993 Proposed Change to OL (PCOL-93/06) to License NPF-29, Revising TS to Support Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056C7131993-07-15015 July 1993 Application for Amend to License NPF-29,proposing Changes to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve Hours ML20045H7111993-07-14014 July 1993 Application for Amend to License NPF-29,changing TS to Eliminate Previous Retrictions on Ensuring Operability of Igniters in Encl Areas & Igniters in Open Areas Adjacent to Inoperable Igniters & Redefining Hydrogen Ignition Sys ML20044F1571993-05-20020 May 1993 Proposed Amend PCOL-93/04 to License NPF-29,revising TS 4.8.3.1.2 & 4.8.3.2.2 to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing (LSS) Sys & Increase AOT for Inoperable LSS Sys from Eight to 24 H ML20044F1621993-05-20020 May 1993 Proposed Amend PCOL-92/09 to License NPF-29,removing Unnecessary Operability Requirements for IRMs & APRMs During Plant Shutdown Conditions.Ts Changes Follow NUREG-1434, Rev 0 Requirements ML20116D1391992-10-29029 October 1992 Application for Amend to License NPF-29,consisting of Proposed Change,Revising TS Per Generic Ltr 88-16, Removal of Cycle Specific Parameter Limits from TS, That Will Change Each Fuel Cycle ML20118A5681992-09-14014 September 1992 Application for Amend to License NPF-29,deleting TS Tables 3.6.4-1 Re Containment & Drywell Isolation Valves, 3.6.6.2-1 Re Secondary Containment Ventilation Sys & 3.8.4.2-1 Re MOV Thermal Overload Protection,Per GL 91-08 ML20113H6001992-07-29029 July 1992 Application for Amend to License NPF-29,consisting of PCOL-92/03,changing Selected TS Instrumentation Surveillance Test Intervals & Allowed Outage Times,Based on Cited GE Repts ML20101B6681992-05-29029 May 1992 Application for Amend to License NPF-29,changing TS Bases 3/4.9.7, Crane Travel - Spent Fuel & Upper Containment Fuel Storage Pools ML20096B8861992-05-0606 May 1992 Application for Amend to License NPF-29,changing TS Re Primary Containment Penetration Conductor Overcurrent Protective Devices,Under Exigent Circumstances,Per Generic Ltr 89-10 ML20095K0351992-04-30030 April 1992 Application for Amend to License NPF-29,changing TS 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.6 Re Control Rod Block Instrumentation & 3/4.3.7.6 Re Source Range Monitors,Per Violations in Insp Rept 50-416/92-04 ML20095E7341992-04-22022 April 1992 Suppl to 910626 Application for Amend to License NPF-29, Modifying Wording of Requested Change to LCO 3.3.2,Action B Re Extension of Instrumentation Surveillance Intervals & Allowed Outage Times 1999-08-20
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20217F1951999-10-0707 October 1999 Application for Amend to License NPF-29,to Revise Licensing Basis to Credit One of Insights/Conclusions of NUREG-1465, Revised Source Term Insights ML20211E7061999-08-20020 August 1999 Application for Amend to License NPF-29,incorporating Many of Generic Improvements Agreed Upon Between Industry & NRC Since GGNS Conversion to ITS ML20196K0791999-06-29029 June 1999 Suppl to 980720 Application for Amend to License NPF-29, Implementing BWROG Enhanced Option I-A,reactor Stability long-term Solution.Rev to TS 3.4.1 Inadvertently Omitted from Original Application ML20196G6901999-06-23023 June 1999 Application for Amend to License NPF-29,revising TS Associated with Various Esfss Which Need No Longer Be Credited Following Design Basis Fuel Handling Accident ML20206K5241999-05-0606 May 1999 Application for Amend to License NPF-29,changing TSs Required to Support Ggns,Cycle 11 Operation,Including Slmcpr.Portions of Encl Re Addl Info on Calculated Cycle Specific SL MCPR for Plant Cycle 11 Withheld ML20206R9271999-01-12012 January 1999 Application for Amends to Licenses NPF-29 & NPF-47,proposing Required Actions Consistent with NRC Accepted Change to BWR Improved TS NUREG-1433 & NUREG-1434 ML20236T1551998-07-20020 July 1998 Application for Amend to License NPF-29,revising TSs Re BWROG Enhanced Option I-A Reactor Stability Long Term Solution ML20217P0241998-04-0606 April 1998 Amend 135 to License NPF-29,revising TSs for GGNS to Permit Implementation of Containment Leak Rate Testing Provisions of 10CFR50,App J,Option B ML20198J3451998-01-0909 January 1998 Revised Application for Amend to License NPF-29,providing Clarifications to Amend & Adding Restriction to Allowed Interval Extensions Re Option B of 10CFR50,app J ML20198N3851997-10-28028 October 1997 Application for Amend to License NPF-29,revising TS to Implement Option B & Ref SE Issued by NRR for Ggns'S App J Exemption as Implementing Document for performance-based Leakage Testing Program ML20210V5461997-09-18018 September 1997 Application for Amend to License NPF-29,reflecting Decrease of Two Recirculation Loop SLMCPR to 1.11 & Single Recirculation Loop SLMCPR Limit to 1.12.Proprietary Info Re SLMCPR for Cycle 10,encl.Proprietary Info Withheld ML20134E1191996-10-22022 October 1996 Application for Amend to License NPF-29,revising TS Figure 3.4.11-1, Minimum Reactor Vessel Metal Temperature Vs Reactor Vessel Pressure, Curves Using Methodology of Reg Guide 1.99,Rev 2, Radiation Embrittlement.. ML20117P4421996-09-19019 September 1996 Application for Amend to License NPF-29,changing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20117G6661996-08-27027 August 1996 Application for Amend to License NPF-29,modifying Tech Specs Surveillance Requirements for Safety/Relief Valves ML20116F0141996-07-31031 July 1996 Rev 1 to Application for Amend to License NPF-29,revising TSs Required to Support Cycle 9,reload 8.Rev 1 to J11-02863SLMCPR, GGNS Cycle 9 Safety Limit MCPR Analysis Encl.Rept Withheld ML20113B7341996-06-20020 June 1996 Application for Amend to License NPF-29,redefining Secondary Containment Boundary to Allow Encl Bldg to Be Inoperable During Upcoming Refueling Outage ML20112E1741996-05-31031 May 1996 Application for Amends to Licenses NPF-29 & NPF-47 Adding Addl Acceptable Required Actions to Tech Spec Limiting Condition for Operation (LCO) 3.9.1, Refueling Equipment Interlocks ML20117D6901996-05-0909 May 1996 Application for Amend to License NPF-29,revising TSs to Support Unit 1,cycle 9 Including Changes to SLMCPR & Ref for Analytical Methods Used to Determine Core Operating Limits ML20117F4541996-05-0909 May 1996 Application for Amend to License NPF-29,modifying SRV Surveillance Test for Relief Mode of Operation ML20111B2631996-05-0808 May 1996 Application for Amend to License NPF-29,placing Containment Purge Valves W/Resilient Seals on Performance Based Leakage Testing Frequency ML20108E3551996-05-0606 May 1996 Application for Amend to License NPF-29,changing Name from Mississippi Power & Light to Entergy Mississippi,Inc ML20107E2521996-04-18018 April 1996 Application for Amend to License NPF-29,prohibiting Performance of 24-h EDG Maint Run While Unit in Either Mode 1/2 RBG-42766, Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells1996-04-18018 April 1996 Application for Amends to Licenses NPF-29 & NPF-47,adding Addl Acceptable Method of Fuel Movement,Control Rods Removed or Withdrawn from Defueled Core Cells ML20100J8311996-02-22022 February 1996 Application for Amend to License NPF-29,modifying Safety Setpoint to Tolerance Requirements for Safety/Relief Valves ML20097C3491996-02-0101 February 1996 Application for Amend to License NPF-29,revising TS Bases to Include Changes Since 950221 Approval of TS Bases RBG-42193, Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage1995-11-20020 November 1995 Rev to Application for Amend to License NPF-29 & Proposed Amend to License NPF-47,revising TS 3/4.6.2.2, Drywell Bypass Leakage ML20087B5031995-08-0101 August 1995 Application for Amend to License NPF-29,by Revising TS Assoc W/Various ESF Sys Following Design Fuel Handling Accident ML20086N2071995-07-21021 July 1995 Application for Amend to License NPF-29,proposing to Recapture Approx 2 1/2 Yrs of Low/No Power Operation by Extending 40-yr Operating License Term from 220616 to 241101 ML20078S4891995-02-14014 February 1995 Application for Amend to License NPF-29 Consisting of Changes to TS Requirements 4.4.1.4.a.1 & 4.6.1.4.a.2 ML20078N6481995-02-10010 February 1995 Application for Amend to License NPF-29,consisting of Mod to Proposed Amend to OL (PCOL-93/13),requesting to Perform Drywell Bypass Leakage Rate Surveillance on Performance Based Interval ML20079B4431994-11-0909 November 1994 Application for Amend to License NPF-29,revising TS Associated W/Various ESF Sys Following Design Basis Fuel Handling accident.Mark-up of Current Ts,Proposed TS & mark- Up Improved TS Encl ML20076F9781994-10-12012 October 1994 Application for Amend to License NPF-29,consisting of PCOL-94/01,closing & Deleting License Condition 2.C.(26) for Turbine Disc integrity.Mark-up of Affected OL Page & Proprietary Supporting Info Encl.Proprietary Info Withheld ML20069P4401994-06-17017 June 1994 Proposed Amend to OL (PCOL-94/02),removing License Conditions for EDGs Associated w/NUREG-1216 ML20059H6011994-01-13013 January 1994 Application for Amend to License NPF-29,consisting of Proposed Amend to OL PCOL-93/15,removing 2,324 Spent Fuel Pool Storage Limit & Allowing Full Use of Spent Fuel Storage Spaces ML20059A4801993-10-22022 October 1993 Application for Amend to License NPF-29,modifying Testing Frequencies for Drywell Bypass Test & Airlock Tests ML20059B0131993-10-15015 October 1993 Application for Amend to License NPF-29,converting Current GGNS TS to TS Based Largely on NUREG-1434,Rev 0 ML20056E2861993-08-17017 August 1993 Application for Amend to License NPF-29,proposing Changes to Amend TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Loose Part Detection Instrumentation to Administrative Controls ML20046D2041993-08-11011 August 1993 Proposed Change to OL (PCOL-93/07) to License NPF-29, Amending TS Section 3/4.3.7.10, Loose Part Detection Sys by Relocating Locating Loose Part Detection Instrumentation from TS to Administrative Controls,Per NUREG-1434,Rev 0 ML20046D1911993-08-11011 August 1993 Proposed Change to OL (PCOL-93/06) to License NPF-29, Revising TS to Support Compliance W/New Requirements of 10CFR20 & 10CFR50.36a ML20056D5321993-08-11011 August 1993 Proposed Change to OL (PCOL-93/09) to License NPF-29, Amending TS Section 3/4.3.7.5 by Relocating Certain Accident Monitoring Instrumentation from TS to Administrative Control,Per NUREG-1434,Rev 0,w/respect to RG 1.97 ML20056C7131993-07-15015 July 1993 Application for Amend to License NPF-29,proposing Changes to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing Sys & Increase AOT for Inoperable Load Shedding & Sequencing Sys from Eight to Twelve Hours ML20045H7111993-07-14014 July 1993 Application for Amend to License NPF-29,changing TS to Eliminate Previous Retrictions on Ensuring Operability of Igniters in Encl Areas & Igniters in Open Areas Adjacent to Inoperable Igniters & Redefining Hydrogen Ignition Sys ML20044F1571993-05-20020 May 1993 Proposed Amend PCOL-93/04 to License NPF-29,revising TS 4.8.3.1.2 & 4.8.3.2.2 to Remove Operability Requirements for auto-test Feature of Load Shedding & Sequencing (LSS) Sys & Increase AOT for Inoperable LSS Sys from Eight to 24 H ML20044F1621993-05-20020 May 1993 Proposed Amend PCOL-92/09 to License NPF-29,removing Unnecessary Operability Requirements for IRMs & APRMs During Plant Shutdown Conditions.Ts Changes Follow NUREG-1434, Rev 0 Requirements ML20116D1391992-10-29029 October 1992 Application for Amend to License NPF-29,consisting of Proposed Change,Revising TS Per Generic Ltr 88-16, Removal of Cycle Specific Parameter Limits from TS, That Will Change Each Fuel Cycle ML20118A5681992-09-14014 September 1992 Application for Amend to License NPF-29,deleting TS Tables 3.6.4-1 Re Containment & Drywell Isolation Valves, 3.6.6.2-1 Re Secondary Containment Ventilation Sys & 3.8.4.2-1 Re MOV Thermal Overload Protection,Per GL 91-08 ML20113H6001992-07-29029 July 1992 Application for Amend to License NPF-29,consisting of PCOL-92/03,changing Selected TS Instrumentation Surveillance Test Intervals & Allowed Outage Times,Based on Cited GE Repts ML20101B6681992-05-29029 May 1992 Application for Amend to License NPF-29,changing TS Bases 3/4.9.7, Crane Travel - Spent Fuel & Upper Containment Fuel Storage Pools ML20096B8861992-05-0606 May 1992 Application for Amend to License NPF-29,changing TS Re Primary Containment Penetration Conductor Overcurrent Protective Devices,Under Exigent Circumstances,Per Generic Ltr 89-10 ML20095K0351992-04-30030 April 1992 Application for Amend to License NPF-29,changing TS 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.6 Re Control Rod Block Instrumentation & 3/4.3.7.6 Re Source Range Monitors,Per Violations in Insp Rept 50-416/92-04 1999-08-20
[Table view] |
Text
- - - - - - - - - - - - - - - - - - . - - - - - - - - - -
, e' ,
' l, Entergy Operations,inc.
y
.__ ge gy .,a.m Operations - 1.m'Of" ---
W. T. C ottle
] o April 26, 1991 U.S. Nuclear Regulat ory Commission Mail Station P1-137 Washington, D.C. 20555 Attention: Document Control Denk SUBJFCT: Grand Gulf Nuclear Station Unit 1 Docket No. 50-416
] License No. NPF-29 Reactor Protection System Instrumentation Surveillance Requirements (Table 4.3.1,1-1)
Proposed Amendment to the Operating License (PC0h-91/03)
GNRO-91/00043 Gentleman:
Entergy Operations, Inc. is submitting by this letter a proposed amendment to the Grand Gulf Nuclear Station (GGNS) Operating License.
The proposed GGNS Technical Specification (TS) amendment dolotes the requirement to perform Note (h) daily for the Average Power Range Monitor Flow Blased Simulated Thermal Power-liigh Functional Unit identified as Item 2'.b in TS Tabic 4.3.1.1-1.
In accordance with the p ovisions of 10CFR50.4. the signed original of the requested amendment is enclosed. Attachment 2 provides the technical just.if.ication and discussion to support the requested amendment. Th is amendment request has been rnvlewed and accepted by the Plant Safety Review Committee and the Safet.y Review Committee.
Based on the guidelines presented in 10CFR50.92, Entergy Operations has concluded that this proposed amendment involves no significant hazards conside ra tions .
Yours truly, 44;9 Y ~~~ W WTC/ PRS /ams attachments: 1. Affirmation per 10t:FR50.30
- 2. GGNS PCOL-91/03 i ec- (See Noxt page)
G9103051/SNLICFLR - 1 9104300008 910426 eg
- c. o t PDR .ADOCK 05000416 P POR I
4 p
[W/g
April 26, 1991 GNRO-91/00043 Pago 2 of 3 cc: Mr. D. C. Ilintz (w/a)
Mr. J. Mathis (w/a)
Mr. R. B. McGehoe (w/a)
Mr. N. S. Reynolds (w/a)
Mr.11. L. Thomas (w/o)
Mr. F. W. Titus (w/a)
Mr. Stewart D. Ebneter (w/a)
Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 Atlanta, Georgia 30323 Mr. L. L. Kintner, Project Manager (w/a)
Of fice of Nuclent Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 11D21 Washington, D.C. 20555 Dr. Alton B. Cobb (w/a)
State llcalth Officer State Board of Ilealth P.O. Box 1700 Jackson, Mississippi 39205 G9103051/SNLICFLR - 2
m .
4 BEFORE Tile UNITED STATES NUCLEAR REGULATORY COMMISSION LICENSE NO. NPF-29 IXX KET NO. 50-416 IN Tile MATTER OF HISSISSIPPI POWER & LIGitT COMPANY and SYSTEM ENERGY RESOURCES, INC.
and SOUTll MISSISSIPPI ELECTRIC POWER ASSOCIATION and ENTERGY OPERATIONS, INC.
AFFIRMATION I, W. T. Cottle, being duly sworn, state that I am Vice President, Operations GGNS of Entergy Operations, Inc.; that on behalf of Entergy Operations, Inc., System Energy Resources, Inc. , and South Mississippi
-Electric Power Association I an authorized by Entergy Operations, Inc. to sign and file with the Nuclear Regulatory Commission, this application for amendment of the operating License of the Grand Gulf Nuclear Station; that-I signed this application as Vice President, Operations GGNS of Entergy Operations, Inc.; and that the statements made and the matters set forth therein are true and correct to the best of my knowledge, information and belief.
Cd M '
W. T. Cottle STATE OF MISSISSIPPI COUNTY OF CLAIBORNE SUBSCRIllED AND SWORN To before me, a Notary Public, in and for the County and State above named, this Ob day of G rahit , 1991.
\
(SEAL) dwe bw th Notary Pub }
Hy commission expires:
o , c m +d e ydnn M) Ti lm G9103051/SNLICFLR - 4
Attachment 2 to GNRO-91/00043 A. SUBJECT
- 1. N1.-91/03 Deletion of Daily Requirement to Perform Note (h) for the APRM Flow Blamed Simulated Thormal Power-liigh Functional Unit
- 2. Affected Technical Specification:
Tahlo 4.3.1.1-1, " Reactor Protection System Instrumentation Surveillanen Requirements", Item 2.b and Note (h) - pagos 3/4 3-7 and 3/4 3-8 B. DISCUSSION
- 1. This proposed change to the GGNS Technical Specifications (TS) would deleto the requirement to perform Note (h) daily for the Average Power Rango Monitor (APRM) Flow Biased Simulated Thermal Power-liigh scram function identified as item 2.b in Table 4.3.1.1-1.
- 2. The daily surveillanen provides information and protection redundant to other surveillanco requirementn. GGNS identified the dolotion of this surveillance as a TS change honoficial to safety through reduction of operator burden.
- 3. Through our evaluation of the historical basis for the Daily Channel Check requiremont, wo havo found that the note was incorporated into the draft CWR-6 Standard Technical Specificat. ion (STS) (the last official version of the BWR STS for the llWR-5 does not contain the footnoto at all) with the following wording:
" Verify measured corn flow to be greater than or equal to established corn flow at the ox1st.ing flow contiol valyn position."
- 4. The wording of the noto varios from plant to plant. A rovjow of selected sampics of dif ferent plant TS has shown how the original intent of the note has been obscured as each of thesn plants have negotiated their own wording. We hollove that the dif ferences in the wording are due to each plant's attempt to rationalizn the note or to minimize its offect having determined that the notn does not reflect a serious concern or has no basis for being in'the Reactor Protection System (RPS) Instrumentation TS.
- 5. GGNS, proposes the following TS changes:
- a. Delete the daily survoillanco specified in Tabic 4.3.1.1-1 f3r item 2.b, " Average Power Range Monitor Flow Blased Simulated Thermal Power-Iligh."
09103051/SNI,iCFI,R - 8 y v
Attachment 2 to GNRO-91/00043
- b. Delete the Note (h) Table 4.3.1.1-1 associated with the
( daily surveillanca w. is also being deleted.
Marked up TS pages rollecting the proposed TS changes described above are included.
- 6. The proposed changes and basis are similar to those granted by the NRC for Fermi-2 in Amendment No. 19 and Clinton Power Station in Amendment No. 30.
C. JUSTIFICATION
- 1. The APRM Flow-Biased Simulated Thermal Power (APRM-FBSTP) scram function monitors parameters to approximate the thermal power being transferred to the reactor coolant. The APRM neutron flux is electronically filtered with a time constant representative of the fuel heat transfer dynamics to generato a signal proportional to the thermal power in the reactor. The trip setpoint is varied as a function of recirculat_ ton drive flow (i.e., at lower core flows the setpoint is reduced proportional to the reduction in powoc experienced as core flow is reduced with a fixed control rod pattern) but is clamped at an upper limit. The APRM-FBSTP scram function can provide an added level of protection against transients where thermal power increases slowly. During these type of events, the thermal power increase does not significantly lag the neutron flux response and, because of a lower trip setpoint the APRM-FBSTP function can initiate a scram before the high neutron flux scram. For rapid neutron flux increase events, the thermal power lags the neutron flux and the APRM Neutron Flux - liigh scram function provides a scram signal before the APRM-FBSTP scram function setpoint is exceeded. The GGNS reload safety analysis does not take credit for the APRM-FBSTP scram function in ensuring the safety limit minimum critical power ratto is not exceeded.
- 2. The daily surveillance performed to safisty Note (h) is somewhat in disagreement with the jetpump surveillance contained in TS 4.4.1.2.1.a. The Note (h) surveillance requires the measured drive flow to be less than or equal to the established drive flow while the jetpump surveillance requires the measured drive flow to be within 10% of the established. Thus, in order to ensure compliance to Note (h), the jetpump surveillance is forced to be less than or equal to minus 10% of the established as the instrumentation is the same. This requirement places undue restrictions on the jetpump surveillance. In addition, at measured drive flows greater than approximately 69%, the
'APRM-FBSTP scram function is clamped and therefore the surveillance provides no useful indication except at reduced flows.
G9103051/SNLICFLR - 9
- - ... _ -. __ _ _ ._ _2 _.
c .
Attachannt 2 to GNRO-91/00043 l
l i
- 3. A review of the various versions of the noto shows that, with _
minor variations, there are two general versions, nolth- r l
which exactly matches the wording appearing in the drai.
_5 STS:
(a) Ono version of the note requires verifying that indicated or measured reactor recirculation loop drive flow for a given flow control valvo position is less than or equal to a previously ostablished reactor recirculation -loop drive flow for that flow control valve position. (This is the version that appears .in the GGNS and River Bend TS.)
- (* 1 Tho other version requires verifying that mansured total core flow (total jet pump flow) for a given indicated reactor recirculation loop drive flow (as sensed by the APRMs) is greater than or equal to a previously ostablished total core flow for that particular recctor recirculation-loop drive flow. (This la the version that appears in tho Porry and was in the Clinton TS as well as the Nine Mllo Point TS except that the latter repla,es the " greater than
-or equal to" with the words '!1n thn range of." LaSailo has a similar ito , 1.o., the words "greator than or equal to" are not included.)-
- 4. Based on our evaluation, wo bellove that the following concerns and/or events may have been considered when the note was '
incorporated in the TS:
(a) Flow control valvo crudding; (b) Jet pump beam crackfrg; (c) Jet pump blockago; (d) Core crudding; and-(c) Jet pump instrumentation problems. j
-An nvaluation of these concerns is discussed as follows:
Flow Control ValyoJFCVLCrudding'- Crudding of tto flow control valve would result in a trend where recirculation
, loop drive flow would decreaso over timo for a glvon FCV position. . Because core' flow would also decrease (the core-flow / drive-flow relationship is roughly proportional except at low flow conditions where natural circulation dominates), this situation would not result in a noi. conservativo condition with respect to the APRM-FBSTP scram function.
Vorsion (a) of the note addresses the drive-flow /FCV-position relationship, but, for the reason discussed above, should not be associated with APRM-FDSTP TS since it would be of . limited value f rom that standpoint. (A check performed in accordance with Vorsion (a) will always be satisfied because the abovo-noted trend ensures it. The-09103051/SNLICFhR - 10
. Attachment 2 to GNRO-91/00043 I
requirement for ensuring that the APRM-FBSTP instrumentation is sensing the correct drive flow is fully mot by perfoaming the required Channel Check, Channel Functional Test and Channel Calibration requirements for this instrumentation.) Version (b) is not applicable to the drive-flow /FCV position relationship since it only considers changes in the corn-flow / drive-flow relationship.
A chnek of the drive-flow /FCV position relationship is only appropriate for TS 3/4.4.1.2 (Jet pump Operability) where a number of daily surveillances are required for the reactor recirculation system. These surveillances are listed below:
(a) Verify the indicated recirculation loop flow does not differ by more than 10% from the established FCV-position-loop flow characteristics.
(b) Verify the indicated total core flow does not differ by more than 10% from the established total core flow value derived from recirculation loop flow mosaurements.
(c) Verify the indicated dif fuser-to-lower plenum differential pressure of any individual jet pump does not differ from established patterns by more than 10%.
It should be noted that relationships addressed by either version of the note are both addressed in these surveillances. Changes in the drive-flow /FCV-position relationship would be revealed by performance of item (a) above.
Jet pump _Boam Cracking - This phenomenon was addressed in GE Servico Information hotter (SIL) No. 330. GGNS has ovaluated the SIL and a discussion of the GGNS responso is found in Supplomont 6 to the GGNS Safety Evaluation Report (NUREG-0831). The individual jet pump dif fuser-to-lower-plenum dif ferential pressure check, as required por GGNS TS 4.4.1.2.1.c (i.e., the third item on the list presented previously), was identified in the SIL as an acceptable method for identifying this phenomenon. If this event was to occur, this daily surveillance chock would recognizo it.
Failure to moot the acceptanco critoria would then require a plant shutdown because the corresponding ACTION under TS 3.4.1.2 states, "With one or more jet pumps inoperable, be in at least il0T SilUTDOWN within 12 hours." Additional ACTION under the RPS instrumentation TS is redundant and unnecessary.
Jet Pump _ Block _ago - In the unlikely event a jet pump becomes blocked or obstructed, the daily jet pump performance surveillances discussed above would reveal this condition as well.
G9103051/SNLICFLR - 11
, . Attachment 2 to GNRO-91/00043 l
Core _Crudd.ing - The change in m-ratio (rocirculation loop flow minus recirculation loop drive flow divided by recirculation loop drive flow), 1e., core flow / drive flow relationship that might occur from beginning-of-cycle to end-of-cycle due to core crudding is so slight that this phenomenon is not a significant concern. The resultant change in the m-ratio would have negligible impact on the APRM-FBSTP trip setpoint. A core flow calibration is performed at least once per cycle using Reactor Engineering procedures to ensure that accuracy is being maintained in the core flow and recirculation flow measurement systems.
The recirculation flow units and APRM flow biased scram circuitry is checked periodically per required surveillances. These activities ensurn that W (percent of rated recirculation drive flow) as required for RPS instrumentation is accurate. A significant change in core flow or drive flow is more likely to be the result of the phenomena ((b) and (c)] discussed previously.
Jet Pump Instrumentation Problems - A jet pump instrumentation problem is always a possibility, and if any of the surveillances under TS 3/4.4.1.2 yicided unacceptable results, a jet pump instrumentation problem would be suspected. Cross checks against other related instruments associated with the rcquired jet pump would be performed to determine if it is indeed just an instrument problem. If an instrument problem is identified, then necessary actions would be performed to restore the instrumentation to operable status. No concern with respect to the APRM-FBSTP trip exists (assuming the APRM-FBSTP instrumentation is operable as verified by the performance of its associated surveillances) because the jet pump instrument problem does not involve an actual change in jet pump flow.
- 5. In summary, the above five concerns are adequately addressed by the RPS instrumentation surveillances, the daily jet pump surveillances and the cycle core flow calibration. Jet pump beam crackin3 or jet pump blockage, which could cause a gross change in core flow and recirculation flow reintionships are adequately addressed by specific surveillance requirements.
Changes to the core flow due to core crudding would be expected to be minimal over the course of the cycle. The corn flow calibration at least once per cycle and the surveillance requirements for RPS and jet pump instrumentation provide assurance that the concerns associated with core crudding are adequately addressed. On the other hand, the multiple burdens placed upon operators in the control room are a continuous concern, particularly unnecessary requirements which serve no safety function. The daily performance of Note (h), therefore, should not be included in the RPS instrumentation TS.
09103051/SNLICFLR - 12
Attachment 2 to GNRO-91/00043 D. NO SIGNIFICANT llAZARDS CONSIDERATIONS
- 1. Entergy Operations, Inc. is proposing that the TS Surveillance Requirement of Table 4.3.1.1-1 to perform Note (h) daily for the Avorage Power Range Monitor Flow Blased Simulated Thermal Power-High scram function be deleted. Adequato steps are taken without the Surveillance Requirement and Noto (h) to detect and take appropriato action for degradation in the amount of core flow resulting from a given recirculation loop flow.
- 2. The Commission has provided standards for determining whether a no significant hazards consideration exists as stated in 10CFR50.92(c). A proposed amendment to an operating licenso involves no significant hazards if operation of the facility in accordance with the proposed amendment would not: (1) involvo a significant increase in the probability or consequences of an accident previously evaluated; or (2) create the possibility of a new or dif ferent kind of accident from any accident previously evaluated; or (3) Involve a significant reduction in a margin of safety.
- 3. GGNS has ovaluated thn no significant hazards considerations in Lts request for a license amendment. In accordance with 10CFR50.91(a), GGNS is providing the following analysis of the proposed amendment against the three standards in 10CFR50.92:
- a. No significant increase in the probability or consequences of an accident previously evaluated results from this change.
The proposed change to the GGNS TS does not involve an increase in the probability or consequences of an accident previously evaluated because the proposed change only removes a requirement determined to be redundant to existing requirements and has no meaningful valun from a safety point of view. With operablo RPS Instrumentation and periodic core flow calibrations, the accuracy of the APRM-FBSTP trip is assured. Deviations or trends away from established core-flow and drive-flow conditions will continue to be indicated by performance of the aurveillances required under TS 3/4.4.1.2. In addition, the proposed change is expected to result in an unquantifiable decrease in the probability of previously evaluated accidents through the resulting reduction in control room operator burden.
- b. This change would not creato the possibility of a new or dif ferent kind of accident from any previously analyzed.
G9103051/SNLICFhR - 13
o . . . .
4
. Attachment 2 to GNRO-91/00043 4
The proposed change does not create the possibility of a new or different kind of accident from any previously evaluated because no new modes of operation or changes to plant design are involved. The scope of the proposed change is strictly limited to the deletion of the daily surveillance requirement specified by Note (h) which has been determined to involve no significant change to the protection afforded by existing surveillances.
- c. This change would not involve a significant reduction in the marein of safety.
The proposed change does not involve a reduction in a margin of safety because the relationships (under TS 3.2.2) used to establish the APRM Flow-Blased Simulated Thermal Power-liigh scram and Flow-Biased Neutron Flux-Upscale control rod biotk trip setpoints will remain unchanged.
The APRM-indicated recirculation loop drive flows will ontinue to be appropriately checked to ensure that their established relationship to total core flow is preserved or accounted for undar other TS. All other OPERABILITY and Surveillance Requirements associated with the affected Instrumentation remains unchanged. . It should also be noted ,
that the current redunancy of surveillance requirements does not reflect a margin of safety but rather a situation which, if carried to extremes, would constitute a serious safety concern.
- 4. Based on the above evaluation, Entergy Operations, Inc. has concluded that operation in accordance with the proposed amendment involves no significant hazards considerations, a
G9103051/SNLICFLR - 14